迟后,lagged
1)lagged[英][l?g][美][l?g]迟后
1.The paper points out some problems of lagged documented evidences in the Chinese Dictionary(Vol.指出《汉语大字典》(第二、三卷)中若干条书证迟后问题,补充了一些始见书用例,以期正确反映字义的源头,提高字典释义质量。
英文短句/例句

1.Hanyu Da Cidian(The Latter Four Volumes) and its Documentary Evidence:Laggings Exemplified《汉语大字典》(后四卷)书证迟后举例
2.Loads files to memory for later printing.将文件加载到内存中以便迟后打印。
3.After a specified delay, bit "o" is read again.经过一定的延迟后,再次读“O”位。
4.Tang Yu Lin and the Citations in The Grant Chinese Dictionary;从《唐语林》看《汉语大词典》书证迟后问题
5.Lagged Illustrations of Documented Evidences for the Chinese Dictionary(Vol.2&3);《汉语大字典》(第二、三卷)书证迟后举例
6.Some Late Samples in A Comprehensive Dictionary of Chinese Characters(Vol.1);《汉语大字典》(第一卷)书证迟后举例
7.It is too late to grieve when the chance is past坐失良机,后悔已迟
8.The meeting was deferred until after New Year's Day.会议被推迟到元旦以后。
9.after-effect n.effect that occurs afterwards,eg a delayed effect of a drug used medically后效(如用药后延迟的效应)
10.The belated moon looks over the roofs,姗姗来迟的月亮从屋顶后面探出脸来,
11.Explanations and prolonged discussions must be put on the next pages.解释和延迟的讨论必须放到后面一页。
12.Do I have your permission that I put off the work till a later day?你允许我把工作推迟到以后再做吗? ?
13.Our plans must hang fire for a time.我们的计划必须向后推迟一些时间。
14.Drag onto the page to indicate a delay in the process.拖到绘图页后,可以指示进程中的延迟。
15.There will be a way out sooner or later and the beginning steps are always much easier than the ending ones.办法迟早会有的,步骤总是先易后难。
16.Late onset globe rupture after radial keratotomy放射状角膜切开术后迟发性眼球破裂
17.Let's study it later. Listen to me and repeat.我们迟些再学习。听我说,然后重复一遍。
18.We can put it off till next week.我们可以延迟到本周较后的时间。
相关短句/例句

lateness binding迟后联编
3)lagging and time-delay滞后延迟
4)maximum lateness最大迟后
1.Taking the maximum lateness as objective function, this paper develops a polynomial time algorithms for the processing sequence of the n jobs given or not given.文中以工件的最大迟后为目标函数,对工件加工顺序预先给定和可任意时的最优分批分别给出了多项式时间算法。
2.Taking the minimization of the maximum lateness of the jobs as the objective fu.文中以工件的最大迟后为目标函数,对上述分批问题用动态规划技术给出了一多项式时间算法。
5)earliness-tardiness超前迟后
6)late work迟后工程
1.In the second chapter, we studies the problem of scheduling n jobs on a single batching machine to minimize total weighted late work.若给定一个排序,我们可以很容易地得出每个工件J_j(j=1,2,…,n)的完工时间C_j及其迟后工程V_j=min{T_j,p_j},这里T_j=max{C_j-d_j,0}。
延伸阅读

哀蜀人为南蛮俘虏五章·出青溪关有迟留之意【诗文】:欲出乡关行步迟,此生无复却回时。千冤万恨何人见,唯有空山鸟兽知。【注释】:【出处】:全唐诗:卷518-92