吸收塔,absorber
1)absorber[英][?b's?:b?][美][?b's?rb?]吸收塔
1.Multiobjective optimization of phosgene absorber using NSGA-Ⅱ;NSGA-Ⅱ用于光气吸收塔的多目标优化
2.Discussion on the WFGD absorber process design of a 600MW unit;浅谈600MW机组湿法脱硫吸收塔的设计
3.The absorber module in wet FGD system;湿法烟气脱硫系统的吸收塔设备
英文短句/例句

1.gasoline mercaptan absorber汽油中硫醇的吸收塔
2.389 The distilling column( absorber, column evaporator, regenerator, column washer) is a kind of equipment for outdoor installation.蒸馏塔(吸收塔、蒸发柱、再生塔、洗涤塔)是一种室外安装的设备。
3.The Analysis about The Scaling of Nozzle in Flue Gas Desulfurization Absorber烟气脱硫吸收塔喷嘴堵塞问题的分析
4.Study on anti-corrosion method in FGD absorber of power plant电厂烟气脱硫吸收塔内防腐方式分析
5.Analysis and improvement for absorption tower liquid level measurement in wet FGD systemFGD系统中吸收塔液位测量方法改进
6.Under negative pressure, the Gaseous Chlorine Dioxide is absorbed through the fun-air in absorber( tower).二氧化氯气体在负压下通过空气鼓吹到吸收塔吸收。
7.Filler absorbing tower is an important unit operation in chemical engineering.填料吸收塔是化工过程常用的一种单元操作。
8.The Parameters and Their Relationships of a Spraying Absorber for Wet FGD烟气脱硫吸收塔中的传质参数及其关系
9.Study of Gas Distributor Used in Large-scale Desulfurization Packed Columns;大型脱硫填料吸收塔气体分布器的研究
10.Design Modification for CO_2 Absorber in Ammonia Plant Capacity Increasing from 1000T/d to 1500T/d;合成氨1000T/d改1500T/d的脱碳吸收塔改造设计
11.Research on the Reliability Evaluation and Reinforcement of Steel Desulfurating Tower after Fire Hazard;钢吸收塔火灾后可靠性评估与加固处理研究
12.Thermal Power Plant FGD Absorber Flip Construction Technology火力发电厂烟气脱硫装置吸收塔倒装施工工艺
13.Process Calculation for Tailgas Scrubber--Turbulent Ring Absorber of a Phosphate Compound Fertilizer Plant磷复肥装置尾气洗涤器——湍环吸收塔的工艺计算
14.INFLUENCE OF SMOKE CONCENTRATION UPON ABSORPTION TOWER IN WET DESULPHURATION SYSTEM AND COUNTERMEASURES THEREOF烟尘浓度对湿法脱硫吸收塔的影响及对策
15.A Simulation Study on the Absorption Column of One-Step Synthesis of Dimethyl Ether from Syngas合成气一步法制二甲醚吸收塔的模拟研究
16.The Buckling Analysis of Thermal Power Plant Smoking Desulfuration Absorber Tower under Earthquakes地震作用下烟气脱硫吸收塔稳定计算分析
17.FINITE ELEMENT ANALYSIS OF FLUE GAS DESULPHURIZATION ABSORBER BASED ON API STANDARD基于API规范的烟气脱硫吸收塔有限元分析
18.Hydromechnical Calculation and Optimum of the Absorption Towers of Low Temperature Cleaning by Methyl Alcohol低温甲醇洗吸收塔流体力学计算及优化
相关短句/例句

Absorption tower吸收塔
1.Application of regular Packing to Absorption Tower in Fertilizer Plant;规整填料在化肥工业吸收塔上的应用
2.Analysis and improvement for absorption tower liquid level measurement in wet FGD systemFGD系统中吸收塔液位测量方法改进
3)absorbing tower吸收塔
1.Analysis on operation of stuffing absorbing tower;填料吸收塔操作分析研究
2.The device absorbing and cooling ammonia was incorporated with U-type heat exchanger,whose upper part is absorbing tower and the lower part is a U-type heat exchanger.高效氨吸收冷却器是将吸收塔和U型管式换热器合为一体,其结构为上部是吸收塔,下部是U型管式换热器。
3.In order to trap the liquid foam and separate the water in the tail gas,a whirlwind board separator is installed in the top of the absorbing tower and a gas-liquid cyclone .为了捕集液沫和分离尾气中水分,在吸收塔顶部增加了一个旋流板分离器,在吸收塔外增设气液旋风分流器的二级分离方案,以减少吸收液的损失。
4)absorption column吸收塔
1.Capacity escalation of primary units of quenching and absorption column system for acrylonitrile units is studied in this paper.对引进的 5 0kt/a丙烯腈生产装置中急冷吸收塔系统扩能技术改造进行了核算和工艺研究。
5)re-absorbing tower再吸收塔
1.A re-absorbing tower, redesigned with the Combined Trapezoid Spray Tray (CTST), was an important column of the fluidized catalytic cracker unit (FCCU) with 0.采用新型立体传质塔板对燕山石化炼油事业部的8×105t/年减压渣油催化裂化装置的再吸收塔进行技术改造,新设计塔径为 1200mm,30层CTST塔取代原 1400 mm浮阀塔,改造后C3、C4、C5的吸收率分别提高了60。
6)double absorption column双吸收塔
1.Through comparing the ferrous chloride double absorption column with alkaline liquor double-jet,advantages and disadvantages of the two technologies were described respectively.通过对氯化亚铁双吸收塔和碱液双水射器两种氯气吸收装置的比较,说明了这两种氯气吸收装置的优缺点,指出双吸收塔氯气吸收装置具有吸风量大、吸收时间短、无废气和废液排放、不易发生吸收液泄漏、玻璃钢材料不易老化等优点。
延伸阅读

吸收塔分子式:分子量:CAS号:性质:见吸收设备。