1)detonating method起爆方法
英文短句/例句
1.Initiation is chosen so that during the blasting and collapse procedure, the bridge is subjected to as much stress as possible.选择的起爆方法应使桥梁在爆破及坍塌的过程中,受到尽可能大的应力。
2.Numerical simulation method and different initiation modes for prefabricated multilayer fragment warhead多层预制破片战斗部数值仿真方法及起爆方式影响
3.This article introduces capacity feature and application method in construction, also introduces combination of detonating net.介绍了导爆管的性能,优点及其在施工中的具体应用方法,并简单地介绍了起爆网络的联结。
4.The simple connection method for plastic detonating tube in blasting爆破作业中塑料导爆管简易连接方法
5.Detonation is an important factor in under water blasting.起爆方式对于水下爆破也是一个重要因素。
6.RESEARCH ON INFINITE DIVISION DETONATING TECHNOLOGY OF LARGE-SCALE ROCK BLASTING大型土石方爆破无限分段起爆网路技术研究
7.Numerical Simulation of Different Detonation Modes for Underwater Drilling Blast水下钻孔爆破不同起爆方式的数值模拟
8.The features parameters selection and ignition plan of rat hole blasting are studied.研究了斜孔爆破的特点、孔爆破参数的选择及起爆方案。
9.Police are investigating the type of explosive used in the blast.警方正在调查引起爆炸的炸药类型。
10.Here and there the contest breaks out into riots.有些地方,斗争爆发为起义。
11.An analysis of the explosion of a boiler illegally made一起非法自制的土锅炉爆炸事故分析
12.Research on Application of Filter Arithmetic Base on Control of Optimal Burst Angle最佳起爆角控制的滤波算法应用研究
13.Numerical Simulation of Column Projectile Impact Shielded Explosive Using FE/SPH Coupling MethodFEM/SPH耦合算法的射弹冲击起爆仿真
14.To demolish(a building) by causing to collapse inward.内爆拆除用造成内爆的方法拆除(建筑物)
15.On blasting perturbation mechanism of rock burst in tunnel by dynamic photo-elasticity用动光弹方法研究隧道岩爆的爆破扰动机理
16.Test methods of explosion-proof performance for explosion-proof applied TV equipment with separate typeGB/T13953-1992隔爆型防爆应用电视设备防爆性能试验方法
17.Research and Application the Radial Detonating Explosives in the Hole Detonation Wave Propagation Direction;孔内炸药径向起爆爆轰波传播方向的研究及应用
18.Numerical Simulation of the Process of Discrete Rod Deployed by Different Modes Detonation不同起爆方式下离散杆战斗部爆炸驱动杆条的数值研究
相关短句/例句
initiating direction起爆方位
1.The optimal delay time and initiating direction of a deformable warhead is a precondition for promotion of the warhead s lethal effect.最佳起爆延时和起爆方位是实现可变形战斗部高效毁伤威力的前提。
3)initiation method起爆方式
1.The effects of structural parameters of liner and initiation methods on projectile formation and performanc.通过模拟计算得到了药型罩结构参数和起爆方式对弹丸成型的影响规律,并初步确定药型罩结构参数间的相互关系:药型罩直径D,内径R1=(0。
2.It was demonstrated that the initiation methods such as center point initiation,four-point initiation and peripheral initiation had an effect on the formation and the performance parameters of the high velocity rod-shaped projectile.应用LS-DYNA动力学分析软件对变球缺型罩装药结构下高速杆式弹丸的形成过程进行数值模拟研究,揭示了其成型机理,并研究了中心点起爆、四点同时起爆和环形起爆等三种起爆方式对高速杆式侵彻体的成型和性能参数的影响,得到了弹体的速度分布。
4)ways of initiation起爆方式
1.By analyzing the results,it suggests that ways of initiation have great influence on jet performance.应用LS-DYNA有限元程序,采用ALE方法对聚能装药在点起爆、面起爆、正向环形起爆和逆向环形起爆等不同起爆方式下的射流形成过程进行了三维数值模拟。
5)initiation position起爆方式
1.In order to investigate the influence of different initiation positions on the directed performance of fragments,the numerical simulation for an assumed directed fragment warhead was conducted by using ANSYS/ LS DYNA in this paper.利用ANSYS/LSDYNA软件,采用数值模拟方法,针对一虚拟的定向破片战斗部,研究了不同起爆方式对破片定向性能的影响,获得了破片在定向区域的破片数、平均速度和动能等物理量,通过分析比较不同起爆方式的密度、速度和动能增益,取得了起爆方式对破片定向性能影响的规律性认识,给出了一个工程上易于实现的、相对优越的起爆方式。
6)Ignition plan起爆方案
延伸阅读
地下采矿方法设计的计算机方法地下采矿方法设计的计算机方法computerized design of under-ground mining method d一x!0 eo一kuong fongfo shejl deJ一suanjl fongfa地下采矿方法设计的计算机方法(c omPuter-ized design of underground mining method)用计算机和优化技术完成地下采矿方法设计的一种手段。由于地下采矿方法设计时,要考虑的因素很多,判断决策时又十分灵活,没有固定的程式和准则,计算机处理时难度较大,因此,世界各国在20世纪80年代才开始将计算机和现代数学方法应用于地下采矿方法的设计。地下采矿法设计的计算机方法包含采矿方法优选和采场结构参数的优化两方面的内容。其目的是达到安全、经济、有效地采出矿石。 采矿方法的优选主要方法有模糊数学法、专家系统法、多目标决策法和价值工程法等。 (l)模糊数学法选择采矿方法的主要依据是众多的地质技术条件。但是,并没有定义明确的选择准则可以遵循,所以,采用模糊数学法处理。首先,初选一些采矿方法作为候选者,已知这些采矿方法所要求的地质技术条件。然后列出拟选择采矿方法的矿山的地质技术条件,计算并确定它们与候选采矿方法所要求的地质技术条件之间的模糊相似程度,选择条件最相近的那个采矿方法。 模糊数学还可用来预测采矿方法将取得的技术经济指标。首先,列出本矿山的地质技术条件,再收集一些采用同样采矿方法的其他矿山的地质技术条件,对它们进行模糊聚类。聚类时,与本矿山近似程度最高的矿山取得高权值,其余矿山按聚类近似程度排序依次取较低的权值;然后将各矿山用这种采矿方法取得的技术经济指标加权平均,得到本矿山采用这种采矿方法可能取得的技术经济指标。 (2)专家系统法采矿专家选择采矿方法时,通常先根据矿岩稳固性选择空场法、崩落法或充填法等采矿方法的大类别;然后根据矿体倾角及其他条件选择运输方式和长壁法、分段崩落法等采矿方法小类别;再根据矿体厚度或分段高度选择浅孔、中深孔或深孔等不同的落矿方式。这个过程是一个明显的逻辑推理过程。把这种逻辑因果关系总结成规则,存放在计算机系统中,就建立了采矿方法选择的专家系统(见采矿专家系统)。使用时,输人所设计的矿山的地质技术条件.系统就会自动推理,选择出适用的采矿方法。 (3)多目标决策法选择采矿方法时,考虑采矿成本、采准切割量、矿石贫化率、矿石损失率、采场生产能力等多个因素。这些因素从不同侧面反映采矿方法的优劣,具有各自的计量单位。采用多目标决策法,将这些因素综合起来,从整体上评价几种采矿方法的可行方案,从中择优。 (4)价值工程法价值工程中,事物的价值用其功能与成本的比值来衡量。