1)Luding hydropower station泸定水电站
1.Study on the Fired Capability of Bent Structure of Concrete Filled Steel Tube of Luding Hydropower Station泸定水电站厂房钢管混凝土排架柱结构受火性能研究
2.In this paper, Based on closure of LuDing hydropower station in SiChuan province, the author systemic overviews and expounds the latest technologies, methods and thinks; Summarizes the obedience rules through closure design; Put forward the basic countermeasures in order to reduce closure difficulty; introduces hydraulic calculation of closure on diverse closure type.本文以四川省泸定水电站的施工截流为应用研究背景,系统地回顾和阐述了截流工程的新技术、新方法和新思想;总结了截流设计中应遵循的基本原则,提出了减小截流难度的基本对策、工程措施和施工措施;介绍了不同类型截流的水力计算公式和方法,针对泸定水电站的截流方案进行了一系列的水力模型试验研究,提出了较为合理的截流方案;重点针对深水截流过程中常见的堤头坍塌问题进行了分析研究,得出解决此类问题的相应措施。
英文短句/例句
1.Surface Water Environmental Impact Assessment and Analysis of Hydropower Project of Luding Hydropower Station;泸定水电站水电工程地表水环境影响评价分析
2.Analysis of the Stability of the Slope of the Outlet Section of Spillway Tunnel of Luding Hydropower Station;泸定水电站右岸泄洪洞出口边坡稳定性研究
3.The Stability Numerical Analysis of High Slope Behind the Workshop Building of Luding Hydroelectric Station泸定水电站厂房后缘边坡稳定性数值分析
4.Numerical Research on the Stability of the Right Abutment Slope of Luding-dam泸定水电站右坝肩边坡稳定性的数值研究
5.The Stability Analysis of High-rock Slope on the Right Bank Spillway Tunnel of Luding Hydroelectric Station;泸定水电站右岸泄洪洞出口边坡稳定性数值分析
6.Study on the Fired Capability of Bent Structure of Concrete Filled Steel Tube of Luding Hydropower Station泸定水电站厂房钢管混凝土排架柱结构受火性能研究
7.The Lightning Over-voltage Calculation of Luzhou 500kV Substation Based on PSCAD/EMTDC;基于PSCAD/EMTDC的泸州500kV变电站雷击过电压分析
8.Analysis on influence of narrowed river channel in upper reaches on water flow of Luding reach上游河道缩窄对泸定河段水流影响分析
9.The Design on the Conservation for Water and Soil at Dingqu River Zhengdou Hydropower Station Engineering Project定曲河正斗水电站工程水土保持设计
10.Recheck stability of left bank slope at water intake of Baise HPP百色水电站进水口左侧边坡稳定复核
11.On the Geologic Hazards Caused by Small Hydropower Stations Construction along Narrow Gorges--Case study in Lushui County,Yunnan Province;峡谷地区小水电建设诱发地质灾害研究——以泸水县为例
12.Research on Vibration Characteristics & Stability of Hydro-mechanical-electrical System in Hydropower Station;水电站水机电系统振动特性和稳定性研究
13.An Analysis of Surrounding Rock Stability of Diversion and the Generating Tunnel of the Jiangpinghe Power Station江坪河水电站引水发电洞围岩稳定性分析
14.Research on Hydro stability and Vibration of TGP 700MW Hydro-turbine;三峡电站700MW水轮机水力稳定性及水力振动研究
15.Test Research on Hydraulic Stability of 4# Hydraulic Turbine at Hongshi Hydropower Station红石水电站4#水轮机水力稳定性的试验研究
16.floating power barge水上动力站水上发电站
17.Computation of Two-Phase Transient Flow in Li Jia Xia Hydroelectric Power Plant;李家峡水电站两相非恒定流数值计算
18.Study on Stability of Approach Channel Slope for Jinping I Hydropower Station锦屏一级水电站引渠边坡稳定性研究
相关短句/例句
Luding泸定
1.A detailed re-study of the paleomagnetic polarity stratigraphy of Xigeda Formation with an approximate thickness of 400m in Haiziping,Luding,Sichuan suggests that the upper and lower parts separated at a depth of 360m from the surface belong to the Gauss normal polarity chron and the Gilbert reverse polarity chron respectively.文章对泸定海子坪昔格达组重新进行了详细的古地磁测试,结果显示昔格达组发育时代为4。
3)Puding Hydropower Station普定水电站
1.In the transformation and repair of the hydrau lic hoist of Puding hydropower station, it s found that when air temperature rises the opened gate can automatically move up and when air temperature goes down the opened gate also can automatically move down.在普定水电站液压启闭机改造维修过程中 ,发现开启的闸门会出现在气温升高时自动升高、气温降低时自动降低的现象。
2.RCC arch dam of Puding Hydropower Station is the highest one in the world,the first one in China.普定水电站碾压混凝土拱坝是目前国内首座、世界最高碾压混凝土拱坝, 对其运行初期变形进行观测是从一个侧面判断其施工方法优越性和可靠性, 为科学研究积累和提供资料的重要手段。
4)Liding Hydropower Plant里定水电站
1.Construction quality supervision for Liding Hydropower Plant洛清江里定水电站工程质量监督实践与体会
5)Lushui泸水
1.An Investigation of Current Condition of Dental Caries in Lushui;云南省怒江州泸水县龋病防治现状调查
6)Kangding-Luding康定-泸定
延伸阅读
特里水电站