多年冻土,Permafrost
1)Permafrost[英]['p?:m?fr?st][美]['p?m?'fr?st]多年冻土
1.Research Summarization on Natural Gas Hydrate in Permafrost Regions;多年冻土区天然气水合物研究综述
2.Relationship between permafrost and gas hydrates on Qinghai-Tibet Plateau.;青藏高原天然气水合物的形成与多年冻土的关系
3.Comparative Analysis on Ecological Conditions of Qinghai—Tibet Plateau Permafrost Areas and Tianshan Mountain Permafrost Areas;青藏高原与天山山地多年冻土地区生态环境状况的比较分析——以青藏公路格拉段与天山公路独库段为例
英文短句/例句

1.The Permafrost Characteristics of Qinghai-Tibet Highway Subgrade in Permafrost Regions青藏公路多年冻土区路基下冻土发育特征
2.Analysis on Bearing Capacity of Refreezing Process of Cast-in-place Bored Pile in Permafrost Region;多年冻土地区钻孔灌注桩回冻过程承载力分析
3.RESEARCH ON THE INITIAL FREEZING TEMPERATURE OF PERMAFROST IN DA HINGGANG LING MOUNTAIN大兴安岭多年冻土起始冻结温度测试研究
4.Numerical Simulation of Thermal Field of Roadbed under Cement Concrete Pavement in Permafrost Region多年冻土区水泥混凝土路面下冻土路基温度场数值分析
5.PERMAFROST ALONG THE QING-KANG HIGHWAY (NATIONAL HIGHWAY NO. 214 );青康公路(国道214线)沿线的多年冻土
6.The Effect of Embankment Construction on Permafrost in the Tibetan Plateau路基施工对青藏高原多年冻土的影响
7.A Discussion on the Evaluation Indexes of Asphalt Pavement in Permafrost Regions多年冻土地区公路路面评价指标探讨
8.Study on Temperature Fields and Frost Heave and Thaw Settlement of Railway Culvert in Permafrost Region;高原多年冻土涵洞温度场及地基土冻融变形规律研究
9.Model Test Study on the Improved Filling Embankment in Permafrost Regions;多年冻土区路堤填土改良模型试验研究
10.Research on High Performance Concrete in Qinghai-Tibet Plateau Permafrost Region(QT-HPC);青藏高原多年冻土区高性能混凝土的试验研究
11.Analysis on the stability of permafrost low filled embankment by riprap slope protection片石护坡保护多年冻土填土低路堤稳定性分析
12.Study of Stability of Embankment upon the Slope in the Permafrost Area at Anduo Section of Qinghai-Tibet Railway;青藏铁路安多段多年冻土斜坡路基稳定性研究
13.Numerical analysis of preventing measures of roadbed problems in the permafrost regions of Yaling Railway牙林线多年冻土区路基冻融病害整治工程效果模拟
14.Influence of Snow Cover on the Lower Limit of Permafrost in Altai Mountains我国阿尔泰山地区雪盖对多年冻土下界的影响
15.Study on Highway Subgrade Stabilization and Predication Technique in Plateau Permafrost Region;高原多年冻土区公路路基稳定及预测技术研究
16.Study on Mechanism of Subgrade Thawing and Countermeasrue Against Pavement Structure Distress in Permafrost Region;多年冻土路基融沉机理及路面结构对策研究
17.Research on Thermal Stability of Railway Roadbed in the Permafrost Area of the Qinghai-Tibet Plateau;青藏高原多年冻土区铁路路基热稳定性研究
18.Analysis of Excavating Stability and Water Seepage Feature of Tunnel in Permafrost Region;多年冻土隧道开挖稳定性及其渗漏水特征分析
相关短句/例句

permafrost soil多年冻土
1.The application of thermal probe on subgrade in permafrost soil zone in Qingzang railway;热棒在青藏铁路多年冻土区路基中的应用
2.An evaluation of the island-shaped permafrost soil near Bagazha village;对青藏铁路巴嘎榨岛状多年冻土的评价
3.By means of preliminary experimental study on reinfo rced embankment in Qingshuihe Section of Qinghai-Tibet Railway,this paper analy ses its action of protecting permafrost soil and maintaining stability of railwa y subgrade, carries out the analysis study on its ground temperature and up lim it of temperature with human intervention.通过对青藏铁路清水河段加筋路堤一些初步的试验研究 ,分析加筋路堤在保护多年冻土和维护铁路路基稳定性方面的作用 ,对该加筋路堤下地温情况及多年冻土的人为上限进行分析研究。
3)perennial frozen earth多年冻土
1.Distributing of perennial frozen earth area and its bridge and culvert engineering;浅谈多年冻土地区的分布及其桥涵工程
2.This article analyzed the reason why the road built in the perennial frozen earth is destroyed.分析了在多年冻土地带修筑的铁 (公 )路路基被破坏的原因 ,提出了对路基采取保温的防治措施 ,介绍了路基保温的机理及硬质聚氨酯泡沫塑料在路基上的施工工
3.Considering the bad natural condition of Qinghai-Tibet Plateau and the special engineering character of perennial frozen earth ,the author carried out some research on getting temperature index,laws during concrete construction through calorific calculating,which will guide the concrete construction in perennial frozen earth area of Qinghai-Tibet Plateau and other chilly area as well.针对青藏高原腹地多年冻土区恶劣自然环境和多年冻土独特工程特性条件下桥梁施工对混凝土提出的技术要求 ,通过热工计算 ,推导混凝土施工过程中各阶段的温度控制指标、措施和一些规律 ,对青藏铁路多年冻土区桥梁混凝土施工及其它严寒地区混凝土施工具有指导意义。
4)perennial frozen soil多年冻土
1.Underground water types and the reated regulation in perennial frozen soil environment in Holapen Basin;霍拉盆盆地多年冻土环境中地下水类型及赋存规律
2.Most areas along the Qinghai-Tibet Railway are of perennial frozen soil.青藏铁路的大部分区域由多年冻土组成,冻土顶层或活动层特别容易受季节冻融的影响。
5)permafrost regions多年冻土区
1.Study on stochastic earthquake characteristics of ground in permafrost regions;多年冻土区场地地震动随机特性研究
2.Based on the governing differential equations of the transient problem of temperature fields with phase change, the two-dimensional finite element formula of computing temperature fields around a buried pipeline in permafrost regions are achieved by using Galerkin's method.根据相变瞬态温度场的控制微分方程,应用Galerkin法推导出计算温度场的二维有限元公式,对中国东北多年冻土区运行30年的加热输油管道土壤温度场(融化圈)进行了计算分析和比较。
3.This paper discusses the influence of seepage of surface water in the sides of embankment on the temperature field of roadbed in permafrost regions.运用传热学理论和渗流理论导出了路堤侧向有地表积水人渗情形下,多年冻土区路基温度场渗流场耦合作用的控制微分方程,然后以现场观测资料为基础,用Galerkin有限元方法对青康公路(214国道)花石峡冻土研究站1号试验路段路基温度场未来可能的变化状态进行了数值预报结果表明,若无渗流作用,5a后路堤左侧天然地表、路堤堤身和路堤右侧天然地表的最大季节融深分别为1。
6)permafrost zone多年冻土区
1.Analysis of life cycle cost for asphalt pavement in permafrost zone;多年冻土区沥青路面寿命周期费用分析
2.Construction of water-stop ridge for subgrade at permafrost zone;青藏铁路多年冻土区路基挡水埝施工技术
3.Lot 19 of the Qinghai-Tibet railway is at an elevation of nearly 5,000 meters and is located in permafrost zone,where the construction climate is extremely harsh,construction period is short.青藏铁路19标段海拔高度近五千米,位于多年冻土区,气候极为恶劣,施工期短。
延伸阅读

多年冻土  含冰冻结连续3年或3年以上的岩土。在北美,则将至少在两个连续的冬季和其间的夏季,温度均处于0℃以下的岩土,称为多年冻土。    分布  多年冻土分布面积约占地球陆地面积的25%,包括苏联和加拿大近一半的领土,中国22%的领土,美国阿拉斯加85%的土地;在南极和格陵兰的无冰盖地段和被冰盖边缘覆盖的地下;南美和中亚的高山地区也有分布。除澳大利亚大陆外,地球上所有的大陆均有多年冻土分布,甚至地处赤道附近的非洲乞力马扎罗峰顶也发现有多年冻土。    中国的多年冻土面积约215万平方公里,占世界第三位,主要分布在青藏高原,东北大、小兴安岭和西部高山。中国东北的多年冻土区位于欧亚大陆高纬度多年冻土区的南缘,其南端可达46.6°N。在北美,多年冻土分布的最南端为 51°N。青藏高原的多年冻土区属于高海拔多年冻土,是世界上中低纬度地带海拔最高、面积最大的多年冻土区。    围绕极地的多年冻土为高纬度多年冻土。其分布有明显的纬度地带性,在北半球自北而南多年冻土分布的连续性逐渐减小。北部为连续多年冻土带,通常以-5℃年平均地温等值线作为分布的南界。往南形成断续或广布多年冻土带,其南界大致与-4℃年平均气温等值线相符。?偻衔呶扯榷嗄甓惩燎哪喜勘咴档厍纬傻鹤椿蛏⒉级嗄甓惩链淠喜拷缦呒次嗄甓惩聊辖纭?    多年冻土南界以南、一定海拔高度上出现的多年冻土称为高海拔多年冻土。 分布有明显的垂直带性, 其厚度一般自多年冻土出现的最低界线(即多年冻土下界)往上,随高度的递增而增加。    多年冻土南界以南还分布有残余多年冻土。它们是更新世寒冷期形成的多年冻土退化残存的结果。如在西西伯利亚,多年冻土南界为北纬66°,而在63°N地下200米深处发现残余多年冻土。残余多年冻土有时出现在多年冻土区南缘的地下深处,与现代多年冻土一起构成双层多年冻土(图1)。如在西西伯利亚南部第一层多年冻土厚30~80米,其下有厚度为20~150米的融化层,该融化层下埋藏着残余多年冻土。    冰川下是否存在多年冻土取决于冰川冰温度和厚度,一般讲暖冰川底部温度接近0℃,其下无多年冻土;冷冰川底部温度低于0℃,其下往往有多年冻土。    在极地大陆架地区海底,有从过去寒冷期残留下来的海底多年冷土。其温度接近0℃,其中很大部分因被海水所饱和,所以具有负温却不含冰,属多年寒土;另一部分则为多年冻土,但含冰量通常不大。    除地球上存在多年冻土外,一些学者推测月球岩石圈深处可能具有一定数量的地下冰。一些学者利用遥感技术发现火星表面上存在类似于热喀斯特、多边形裂缝、石冰川等的冰缘地貌,推测火星上多年冻土的平均厚度在赤道为1500米,在两极为5000米。    厚度和温度 多年冻土通常埋藏在地表下不深处,位于季节融化层(或活动层)下。活动层的厚度通常为20~30厘米至2~3米。一般活动层的底板与多年冻土的上限相连,这种多年冻土称为衔接多年冻土。有时活动层在冬季的冻结深度达不到多年冻土上限,在季节冻结层和多年冻土上限之间隔着一层融土,便形成不衔接多年冻土。    多年冻土上下限之间的距离即为多年冻土厚度(图2)。当充填在土粒孔隙和岩石裂隙中的水为淡水时,冻结以后形成的多年冻土下限与0℃地温等温线一致。当充填在土粒孔隙和岩石裂隙中的水为咸水或盐水时,或当岩石无裂隙时,或不含水的土冻结时,多年冻土下限则与0℃地温等温线不一致。在含有地下冰的多年冻土层下还存在着干寒土层和湿寒土层时,冻土层、干寒土层和湿寒土层组成多年冷土层。迄今为止,实测到的多年冻土最大厚度为1300米,见于苏联外贝加尔的乌达康山区56°N处;实测到的多年冷土层的最大厚度为1450米,见于雅库梯西北、马尔赫河源头的北极圈纬度上。推测天山和帕米尔高山区的多年冷土层厚度可达2500~3000米。    多年冻土上层的地温在一年内随季节而变化。这种变化随深度增加而衰减,至某一深度上,多年冻土的温度在一年内相对稳定不变(一年内不超过±0.1℃),这一深度为地温年变化深度或零较差深度。地温年变化深度一般为10~15米。该深度上的年平均地温即为多年冻土的年平均地温,通常为0~-15℃。推测天山和帕米尔高山区道多年冻土年平均地温低达-25℃,南极的山地则为-40℃。    在年变化深度以下,多年冻土的温度随深度增加而升高,在多年冻土或多年冷土层的下限处达到0℃。因此在冻土层中存在着地热梯度,其值在不同的地区很不一样,可由每20米变化1度至每100米变化1度。    多年冻土厚度和温度的变化也受纬度地带性和垂直地带性的控制。当其他条件相同时,在中国东北纬度每增加1度,多年冻土年平均地温平均降低0.5℃;在祁连山区海拔每升高100米,多年冻土温度降低0.6℃,厚度增加14~21米。    形成和演变  当岩土的温度降至0℃以下,岩土中水就冻结形成冻土。如果该处地表一年中的吸热量大于散热量,冷季形成的冻土在热半年全部融化,便为季节冻土。如果该处地表一年中的吸热量小于散热量,冷季形成的冻土在暖季不全部融化,年复一年,就成为多年冻土。    多数多年冻土是在物质沉积之后自上而下冻结形成的,称为后生多年冻土。在沼泽、冲积平原和洪积扇等堆积地区,有时在沉积过程中发生冻结,产生自下而上冻结的多年冻土,称为共生多年冻土。由后生和共生作用混合形成的冻土称为多生冻土。    在地球历史上,多年冻土曾广泛发育。迄今为止,有据可查的最老的多年冻土位于北极北部,自60万年前形成后一直保存到现在。中更新世的多年冻土也有一部分保留到现在,如苏联中雅库梯的多年冻土,其年代距今至少10万年。晚更新世时,苏联多年冻土南界南进到48°N处,中国多年冻土南界达到北纬39°~40°,北美多年冻土南界至少比现在的位置南推2000公里。全新世时期,多年冻土逐渐向北退缩。北极地区一些近海低地的多年冻土开始退化,成为现今的海底多年冻土。晚更新世时在苏联欧洲部分北部和西西伯利亚形成的多年冻土并没有全部融化,而以残余冻土的形式保存下来。中国满归以北和西部高山高原区海拔较高处的多年冻土也没有全部融化。约2000~3000年前出现了新冰期,多年冻土重新发展。在西西伯利亚北部,新形成的多年冻土与更新世残余多年冻土衔接在一起;在南部,新形成的多年冻土覆盖在融化层上,故与融化层下的残余多年冻土组成双层多年冻土。这一时期冻土的范围比更新世时小,所以在新冰期的多年冻土南界以南的地下深处仍有更新世残余多年冻土存在。中国东北这一时期的多年冻土南界已超过了现今多年冻土南界的位置。距今约 700年前开始的小冰期,北半球多年冻土南界位置的变化很不一致,有的南进,有的北退。    现代多年冻土处在变化之中。从全球范围看处在退化阶段,但不排除局部地区的多年冻土出现加积的可能。