绑扎,binding
1)binding[英]['ba?nd??][美]['ba?nd??]绑扎
1.New Motor Winding Binding tool;新颖的电机绕组绑扎工具
英文短句/例句

1.The act of tying or binding.绑扎,结扎绑扎或结扎的动作
2.To tie or group together.绑扎捆扎或聚集在一起
3.The act of binding or of applying a ligature.绑扎绑扎或使用绷带的行为
4.The nurse will strap up your wound.护士会绑扎你的伤口。
5.fastening with the fastened ends facing inward里顺头绑扎法(风筝)
6.To tie or bind with a ligature.绑扎用绷带系上或缠上
7.fastening by holding the thread in the mouth口咬线绑扎法(风筝)
8.A cord, wire, or bandage used for tying or binding.绷带,绳索用于绑扎或结扎的绳子、金属丝或绷带
9.Container lashing fitting for shipsGB/T16956-1997船用集装箱绑扎
10.Don't forget to lash the scenery up ready for the fourth act.别忘了把第四幕的舞台布景绑扎好。
11.The double stilts are usually tied to one's shank to fully demonstrate his skill;双跷多绑扎在小腿上,以便展示技艺;
12.Study on the Friction Thermal Effect of Non-latitude Belt Binding Machine Brake;无纬带绑扎机制动器摩擦热效应研究
13.Column rebars and cushion block work, install the steel inserts and wall binding rebar.绑扎柱筋,垫保护层垫块,安放埋件、拉结筋。
14.The Research of the Application (Reliability and Validity) of the Securing System of the Vehicle on Board Ro-Ro Ships;滚装船上车辆绑扎系固系统的应用分析研究
15.The Mathematical Model of the Dynamic Simulation of the Lashing System of the Vehicle on Board Ro-Ro Ships;滚装船上车辆绑扎系固动态模拟的数学模型
16.This paper discusses the necessity, possibility, feasibility and reliability of application of soft end band wound and bound by polester fibre sleeve with spun glass beam.论述采用涤纶套玻璃丝束绑扎绳绕绑的软端箍的必要性、能性、行性和可靠性。
17.A blood vessel severed by trauma or surgery that requires cautery or ligature to arrest the flow of blood.放血由于外伤或外科手术而切断的血管,需要灼烧或绑扎以止血
18.tie a band or strip of material round sth(用带或条)束捆、扎、绑
相关短句/例句

stiching绑结、绑扎、扎结
3)assembling reinforcement钢筋绑扎
1.According to assembling reinforcement,concrete mixing,transport and pouring,striping,curing and other aspects practical construction technology is introduced for secondary lining works,which provides good references for similar works.以秦岭1号隧道工程为例,对二次衬砌施工时间的确定和施工准备工作进行了介绍,并对钢筋绑扎,混凝土的搅拌、运输及其浇筑,拆模与养护等各施工环节的二次衬砌混凝土的施工技术进行了阐述,对类似工程具有参考价值。
2.Combined with practical work,from formwork design,fabrication and installation,assembling reinforcement,pouring and curing of concrete and other aspects construction technology of fair-faced concrete is introduced as well as quality control measures and standards in order to reduce engineering cost to acquire satisfied economic and social benefits.结合工程实例,对模板的设计、制作安装、钢筋绑扎、混凝土浇筑及养护等关键工序的操作要点进行了阐述,并介绍了成型后混凝土的质量控制标准,以降低工程造价,具有很好的经济和社会效益。
4)bunding and binding箍筋绑扎
5)lashing bars绑扎杆
1.A mathematic model for tension calculation of lashing bars on container stacks on deck;舱面集装箱堆两端绑扎杆受力计算的数学模型
6)steel bar binding钢筋绑扎
1.During the construction of large cross-section stiff concrete beam of high-rise building transfer floor in Nanjing International Plaza Phase I Project,analysis was made on construction methods for steel bar binding,formwork bracing and massive concreting,and technical measures were accordingly taken to ensure smooth construction.在南京国际广场一期工程转换层大截面劲性混凝土梁施工中,对钢筋绑扎、模板支撑及大体积混凝土浇筑等的施工方法进行分析,采取相应技术措施,保证施工顺利进行。
延伸阅读

绑扎捆扎;包扎:~行李ㄧ~伤口。