1)valley-rill填谷式
英文短句/例句
1.Study on the Application of Valley-fill Possitive PFC in Off-line LED Lighting Power Supply填谷式无源PFC在离线LED照明电源中的应用研究
2.A Design of Constant-current High-voltage Power Supply for LED Based on Valley Fill Circuits基于填谷电路的恒流式LED高压驱动电源的设计
3.The DEM Generalization Based on the Filling Valley Coverage一种基于谷地填充的DEM综合方法
4.The Role of TOU for Large Industry Consumers Participating Power Grid Peak Shaving and Valley Filling;大工业用户运用峰谷电价参与电网削峰填谷的实践
5.Study on Ion-exchange Packing Materials in EDI Stacks and the Packing Forms;EDI膜堆填充材料及其填充方式的研究
6.Determination and analysis of TOU power price based on DSM when load shifting optimized;削峰填谷最优时基于DSM分时电价的确定与分析
7.A Discussion on Application of Clay Underlayer to Valey-Type Waste Landfill山谷型安全填埋场实施粘土衬层的探讨
8.Research on increasing the sewage treatment capacity by peak load shifting of CAST processCAST工艺改进削峰填谷增加处理量的研究
9.surface gravel pack地面倾倒式砾石充填
10.outside-packed floating head exchanger外填料式浮头换热器
11.over-the-top gravel packing too皮碗式砾石充填工具
12.auger backfiller万能螺旋钻式回填机
13.5. Fill in the blanks with the right verb form.用适当的动词形式填空。
14.2. Fill in the blanks with the right form of the verbs.用动词的适当形式填空.
15.6. Read and put in the right forms of the verbs.用动词适当形式填空.
16.Fill in each blank, using the correct verb in its correct form.用正确动词形式填空。
17.alkaline packed tower scrubber碱性填充塔式洗涤器
18.top-down packing由上而下的沙丘式充填
相关短句/例句
filling valley load填谷
3)Dapak峰谷搭片式波纹填料
1.Researches on the Hydromechanics and Mass Transfer Properties of Dapaks;峰谷搭片式波纹填料的流体力学与传质性能研究
2.Development and application of Dapak packing;峰谷搭片式波纹填料开发与应用
3.9] and Dapak [ZL 97220464.9]、峰谷搭片式波纹填料 [ZL 972 2 0 46 4。
4)peak load shifting移峰填谷
1.Autocontrol technology of peak load shifting in electrolyzers;隔膜碱电解槽移峰填谷自动控制技术
2.Evaluation and spot test of peak load shifting ability for cold storage regenerator system;蓄冷空调项目电力移峰填谷效果评价及现场测试
3.Electric heat-storage boiler technology and the evaluation method of its peak load shifting effect;蓄热电锅炉技术及其移峰填谷效果的评价方法
5)load shifting削峰填谷
1.Determination and analysis of TOU power price based on DSM when load shifting optimized;削峰填谷最优时基于DSM分时电价的确定与分析
2.It can accomplish the goal of load shifting and reducing co.作为用户侧电价的一种,分时电价目前在世界各国得到了广泛的应用,而且分时电价是需求侧管理的一种重要手段,可以达到削峰填谷与减少用户购电费用的目的。
6)peak load shifting削峰填谷
延伸阅读
春日金谷园(一本缺谷字)【诗文】:火急召亲宾,欢游莫厌频。日长徒似岁,花过即非春。晚雨来何定,东风自不匀。须知三个月,不是负芳晨。【注释】:【出处】:全唐诗:卷739-19