切换系统,Switched systems
1)Switched systems切换系统
1.Stability analysis and stabilization control for a class of switched systems;一类切换系统的稳定性分析与镇定控制
2.Robust H_∞ control for a class of uncertain discrete time switched systems;一类不确定离散时间切换系统的鲁棒H_∞控制
3.Robust stability of a class of discrete-time switched systems with time-delay;一类含有时滞的离散切换系统鲁棒稳定性分析
英文短句/例句

1.Stability of Switched Linear Systems Under Fuzzy Switching Strategy基于模糊切换策略的线性切换系统的稳定性
2.H_∞ Optimal Control of Impulsive Switched System and Application;脉冲切换系统H_∞优化控制及应用
3.Research on Theory and Application for Modelling and Control of Swicthing Systems;切换系统建模、控制理论与应用研究
4.Research on Synchronous Switching System of Air Preheater Based on C8051F;基于C8051F的空预器同步切换系统研究
5.Analysis and Synthesis for a Class of Discrete-time Switched Systems;一类离散时间切换系统的分析与综合
6.Technology of baton handover in TD-SCDMA systemsTD-SCDMA系统接力切换技术
7.Research on Handover and Handover Self-Optimization Method in LTE SystemLTE系统中的切换与切换自优化方法研究
8.Hospital information system and switch the switch to prepare the program to explore医院信息系统的切换准备及切换方案探讨
9.Basic analysis on the valve cooling system's switching control problem of Zhaoqing converter station,Gui-Guang HVDC project贵广直流肇庆换流站阀冷切换控制系统浅析
10.Min-projection-strategy switching rules for DC-DC converters modeled as piecewise linear systemsDC-DC变换器分段线性系统的最小投影法切换律
11.Switched and Hybrid Hamiltonian Systems: Analysis, Synthesis and Applications;切换混杂Hamilton系统的分析、综合及其应用
12.Stability and Stabilization Problems of the Linear Peroidic Switched Systems;周期切换线性系统的稳定与镇定问题
13.Research on Handoff for Air-Ground Data Link System;空地数据链系统中越区切换技术研究
14.Study on the Technology of Baton Handover in TD-SCDMA System;TD-SCDMA系统接力切换技术研究
15.Improved Baton Handover Algorithm in TD-SCDMA System;TD-SCDMA系统中新型接力切换算法研究
16.Research on Handoff Algorithms in CDMA Mobile Communication System;CDMA移动通信系统中切换算法研究
17.WCDMA Soft Handover Algorithm Analysis and Simulation;WCDMA系统软切换算法分析与仿真
18.The Signalling Analysis and Optimization of Handover Dropoff in GSM System;GSM系统切换掉话的信令分析及优化
相关短句/例句

switched system切换系统
1.Model predictive control of time delay switched system with certain switching order constrains;具有确定切换序列约束的时滞切换系统预测控制
2.Keeping cost-control of uncertain switched systems;不确定切换系统的保性能控制
3.Stability analysis of linear switched system;线性切换系统的稳定性分析
3)switching system切换系统
1.Output feedback stabilization for a class of linear switching systems based on observer;一类线性切换系统基于观测器的输出反馈镇定
2.Robust H_∞ reliable control for uncertain switching system based on T-S models基于T-S模型的不确定切换系统的鲁棒H_∞可靠控制
3.To compare the different performances of network control system(NCS) under different combination of data packet,an analysis method was proposed based on switching system,H∞ performance and linear matrix inequality(LMI).为了比较不同数据包组合下网络控制系统(NCS)鲁棒性的差异,提出一种基于切换系统、H∞性能、线性矩阵不等式(LMI)的分析方法。
4)system switch系统切换
1.then it discusses the forms and functions of the system,sets up a system frame which arranges several implements of switch param- eters default for partner libraries,data upload,data collection,training certification and system switch.阐述成员馆向联合图书馆系统平台切换的参数制定、数据合并上载、数据典藏、培训认证、系统切换等实施过程,分析该系统的管理体系和管理机制,并提出相应的管理方法。
5)Markov switching systemMarkov切换系统
1.an information fusion problem for a class of Markov switching system with delayed mode measurements is put forward.随着现代传感器处理器的发展及对系统性能要求的提高,本文提出模式观测滞后状态量测下的Markov切换系统融合问题,并针对模式观测滞后状态量测一步时的融合问题,通过状态扩维的方法,转化成无时滞Markov切换系统的广义滤波问题。
6)inter- RAT handover系统间切换
延伸阅读

备用电源自动切换装置备用电源自动切换装置automatic transfer to stand-by supply be(yongd旧nyt一anz一dongq旧hoon zhuongzhl备用电派自动切换装t(automati。transferto stand一by supply)当工作电源消失或当工作电压降低过多时.能将备用电源断路器快速合闸向负载恢复供电的自动切换装置。 自动切换的一次系统常用的设自动切换装置的一次系统接线有以下两种:①两个电源(两台变压器或两条线路)互为备用。正常运行时,两个电源分别工作,电源之间设有经常断开的自动切换断路器,当其中一个电源故障时,另一个电源通过切换断路器迅速投人而恢复运行。这种自动切换方式通常称为暗备用。两个电源需具有充分的容量,以便在故障情况下由同一个电源向两个负荷供电。②利用一个备用电源作多个工作电源的备用.当一个工作电源故障退出运行时,备用电源自动投人,这种方式通常称为明备用。 自动切换装里功能切换装置的接线具有以下基本功能:①当工作电源消失时,快速起动自动切换装里,投人备用电源;②当工作电源母线电压降低,由接在母线上的低电压继电器动作,进行切换;③备用电源自动投人装置只能动作一次;④工作电源母线故障时,备用电源不允许投人。 火力发电厂备用电源自动切换接线,常用的有慢速切换和快速切换两种方式。 慢速切换为工作电源断路器断开后,经延时,当电动机残压下降到电动机允许的安全电压后才实现自动切换。当工作电源侧断路器跳闸时,联动受电侧断路器跳闸,以起动备用电源自动投人装置。同时,在工作母线上装设单独的低电压起动装置,当工作电源电压降到安全值,即20%~30%额定电压以下,而备用电源母线上保持一定电压值时,使备用电源断路器合闸。慢速切换时间一般为0.5一1·5s。 快速切换装置主要用于300 MW及以上容量的发电机,这种切换方式对电动机的冲击及对机组热力系统的正常运行影响较小,切换过程平衡。实现快速切换的条件是工作和备用电源断路器必须快速动作,要求合闸及跳闸时间为0.06~0.085。