1)power engineering cost电力工程造价
1.In order to control the power engineering cost the Electric Power Planning and Design General Institute (EPPDGI) has analyzed various factors of quick growth of the engineering cost, standardized the mutual relations between the engineering cost management, technical innovation and standardization construction, put forward 3 significant measures to control the engineering cost, i.为了控制电力工程造价 ,电力规划设计总院分析了工程造价快速增长的各种因素 ,理顺了工程造价管理、技术创新及标准化建设的相互关系 ,提出了控制工程造价的 3项重大措施。
英文短句/例句
1.Study on the Cost Change Characteristics of the Power Projects Commissioned during 1998~2005;1998~2005年电力工程造价变化特点研究
2.Influence of Entering into WTO on Power Engineering Cost in China;加入WTO对我国电力工程造价的影响
3.Reasonable Confirmation and Control of Electric Power Engineering Cost浅谈电力工程造价的合理确定与控制
4.Application of Full Life Cycle Cost Management Theory in Power Engineering Cost Management全生命周期造价管理理论在电力工程造价管理中的应用探讨
5.Study on the Methods of Cost Management and Performance Appraisal in Electric Power Engineering;电力工程造价管理及其业绩考核方法研究
6.Cost forecast model for power engineering based on feature extraction and small-sample learning特征提取和小样本学习的电力工程造价预测模型
7.Management and Control of Project Investment of Electric Power Engineering;电力建设项目全过程工程造价管理和控制
8.How Make the Electrical Power Construction Business Enterprise Work Well the Engineering Cost Control;浅谈电力施工企业如何搞好工程造价的控制
9.A Brief Discussion on Cost Management and Control of Electric Engineering Project;浅谈电力工程项目造价管理与成本控制
10.Discuss How to Control Efficiently the Engineering Cost in Power Construction Unit;论电力建设单位如何有效控制工程造价
11.Researchs on Cost Management and Control for Electric Power Projects during Design Phase电力工程项目设计阶段的造价控制管理研究
12.Effective way for controlling cost of electrical projects under new investment system新体制下电力企业工程造价控制的有效途径
13.Application of the Cost Analysis System in Power Engineering Project Construction造价分析体系在电力工程建设中的应用
14.Electic Power Construction Cost Control At Design Stage浅谈设计阶段的电力工程建设造价控制
15.Strengthening the whole process management of project cost,improving the benefit of project investment in electric grid construction;加强全过程造价管理工作 努力提高电网建设工程投资效益
16.Cost Management and Control of Water and Electric Power Project Enterprises水利水电工程施工企业的造价管理和造价控制
17.The cost engineer is the fresh combatant of Chinese project cost management.【中英文摘要】造价工程师是我国造价工程管理工作的生力军。
18.The Analysis of Factors of the Engineering Unit Price of the Power Line Construction;改进输电线路工程单位造价指标,提高工程造价评估水平
相关短句/例句
cost management for power engineering电力工程造价管理
3)cost of hydropower project水电工程造价
1.This paper compares the hydropower projects in Tibet and other areas,analyzes particularities of climate and geography in Tibet such as tableland,strict cool and temperature difference and studies the effect of these particularities on the cost of hydropower project in Tibet.以西藏与藏外水电工程相比,从高原、严寒、温差和远征等方面的特殊性,对西藏水电造价的影响进行了研究,分析构成工程建设成本的人工、材料、机械和费用等方面与内地相比大幅增加的原因,提出西藏水电工程造价编制时应注意的问题,以尽可能真实、合理地反映西藏水电工程造价。
4)engineering cost工程造价
1.The importance of engineering cost management in development of construction enterprises;工程造价管理在建筑施工企业发展中的重要性
2.On the prophase management and the control of the engineering cost;浅谈工程造价的前期管理和控制
3.Study on the influence of the contract management on the engineering cost;合同管理对工程造价影响的研究
5)project cost工程造价
1.Full process controlling and management of constructing item project cost;建设项目工程造价的全过程控制与管理
2.Exploration and practice of the case teaching method in project cost;案例教学法在工程造价中的探索与实践
3.Project Cost Management Reform and Control Methodology;工程造价管理改革与控制方法浅论
6)construction cost工程造价
1.The Establishment of the Practice Teaching System of Construction Cost;试论工程造价专业实践性教学体系的构建
2.On the way to strengthen construction cost control;浅谈如何加强工程造价控制
3.On the overall-process management of construction cost of construction enterprises;浅析施工企业工程造价的全过程管理
延伸阅读
发电工程造价发电工程造价power project construction cost fadion gongeheng zoojlo发电工程造价(power projeet constructioncost)指发电工程从前期工作开始,到投产发电的全部工程费用。它因内容不同可分为发电工程静态投资、发电工程动态投资。 发电工程静态投资由建筑工程费、设备购!费、安装工程费、其他费用、基本预备费和材料价差组成,其反映的是某一价格水平年的静态造价水平。1998年价格水平中国内发电工程单位造价水平为:2x300MW国产引进型机组新建4422元/kW,扩建3759元/kw,4台机组时4090元/kw;2X600MW国产引进型嫌煤机组新建3675元/kW,扩建3381元/kw,4台机组时3528元/kw;2 x 300 MW等级进口嫩煤机组新建5010元/kw,扩建4460元/kw,4台机组时4735元/kW;2x600MW等级进口燃煤机组新建4640元/kw,扩建4450元/kW,4台机组时4545元/kW。 发电工程动态投资由发电工程静态投资、价差预备费和建设期贷款利息组成,其中价差预备费是指工程从编制年至竣工年期间建筑工程费、设备购置费、安装工程费、其他费用上涨而预备的费用;建设期贷款利息是指工程项目的各类融资在建设期发生的利息。按电力工程单机竣工结算办法,第一台机组及公用系统所发生利息计算到第一台机组投产前一季度,第二台机组投资所发生的利息计算到第二台机组投产,以下类推。1”8年审批的发电工程初步设计概算动态投资情况如下:2台30万新建国产机组为4997元/kW,2台60万扩建国产机组为4481元/kW,2台35万新建进口机组为5588元/kW,2台“万新建进口机组为6388元/kW。由于价差预备费、建设期贷款利息与国民经济发展情况、物价上涨情况、利息变化情况有关,而这些因素往往具有不可预见性,因此从1995年起对工程概算执行“静态控制,动态管理”的政策,即控制静态投资在批准的额度以内,动态投资则可根据实际情况进行调整。