1)whole process cost全过程造价
1.Research on Management of Whole Process Cost of Project工程项目全过程造价管理研究
2.This paper using the concept of the whole process cost control, respectively according to the decision-making phase, design phase, construction phase, completion phases, point out the existing problems and the accordingly solutions, and the application of technical and economic measures.本文采用全过程造价控制理念,从工程决策、设计、施工、竣工验收等阶段分别阐述各个阶段工程造价中存在的问题,并提出解决的对策,并应用技术经济方法予以控制。
英文短句/例句
1.Application of Value Engineering to the Whole-process Cost Management;价值工程在全过程造价管理中的运用
2.The Participation of Project Cost Enquiry Agency in All-around Cost Management;工程造价咨询单位如何参与全过程造价管理
3.On cost control of whole process with participation of engineering costs advisory service论工程造价咨询机构参与项目全过程造价控制
4.The Analysis of Project Cost Control with Entire Process Cost Management全过程造价管理模式下的工程造价控制分析
5.On the whole procedure cost management and control of building engineering浅谈建设工程全过程造价管理与控制
6.The overall construction cost management and control under the mode of BQ figure清单计价下的工程建设全过程造价管理与控制
7.The Determination of Cost and Investment Control in Construction Projects;建设项目全过程造价确定与投资控制
8.Discussion on Full Process Management of Construction Cost in Project Agent-construction System项目代建制中的全过程造价管理探讨
9.DYNAMIC CONTROL AND MANAGEMENT OF COST ENGINEER IN THE WHOLE CONSTRUCTION PROJECT;造价工程师对建设工程全过程造价的动态控制与管理
10.Whole Process Cost Management Based on the Concept of the Construction Phase Construction Dynamic Cost Control Research;基于全过程造价管理理念下的施工阶段工程造价动态控制研究
11.Research on Whole Process Cost Consultation Operation of Cost Engineering Consultation Company;工程造价咨询公司进行全过程造价咨询业务研究
12.Construction cost control in construction projects --the role of consulting agency on project cost;建设项目全过程造价控制——浅析工程造价咨询机构的作用
13.The Application of the Whole Process Management in the Power Transmission Project of Cost Control全过程造价管理在输变电工程造价控制中的应用
14.The Study on the Whole-Process Cost Management Mode over Expressway Project;公路工程全过程造价管理模式与方法研究
15.The Study of the Whole Process Cost Management under the Bill of Quality Valuation Model;清单模式下工程项目全过程造价管理研究
16.On the overall process control of projects cost of construction program;浅谈建设项目工程造价的全过程控制
17.Management and Control of Project Investment;建设项目全过程工程造价管理和控制
18.How to Manage the Cost Dynamically in Construction Engineering;建设工程造价动态控制的全过程管理
相关短句/例句
the project cost in the w hole process全过程工程造价
3)total process cost management全过程造价管理
1.Two kinds of valuation mode on construction cost and the meanings of total process cost management(TPCM) are described in this article.介绍了我国工程造价计价的2种模式和全过程造价管理的含义,重点阐述了工程量清单计价模式下的建设项目全过程造价管理,对工程量清单计价中存在的问题也进行了说明。
4)entire process construction cost management全过程造价管理
1.Although at present, we have already established the entire process construction cost management idea, realized to the entire process construction cost management necessity, but there still.虽然目前,我们已经建立了全过程造价管理的理念,认识到全过程造价管理的必要性,但在全过程造价控制中仍存在许多问题,影响了全过程造价管理的效果。
5)whole process cost management全过程造价管理
1.Whole Process Cost Management Based on the Concept of the Construction Phase Construction Dynamic Cost Control Research;基于全过程造价管理理念下的施工阶段工程造价动态控制研究
2.The text introduces the essentials and contents of monthly report system of whole process cost management through the following eight aspects: basic information of project, field situation, whole process cost management, whole elements cost management, whole risks cost management, whole teams cost management, key emphasis of work in later sections, picture of project.通过紧密结合我国目前推行的全过程造价管理理论,以建设项目设计阶段和施工阶段为重点,从项目基本情况、现场情况、全过程造价管理、全要素造价管理、全风险造价管理、全团队造价管理、后阶段工作重点、工程图片共八个方面阐述了全过程造价管理月报的要领和内容,并深入分析了全过程造价管理月报的性质、作用以及对月报的运用。
6)Whole Process Cost Consultation全过程造价咨询
1.Research on Whole Process Cost Consultation Operation of Cost Engineering Consultation Company;工程造价咨询公司进行全过程造价咨询业务研究
延伸阅读
发电工程造价发电工程造价power project construction cost fadion gongeheng zoojlo发电工程造价(power projeet constructioncost)指发电工程从前期工作开始,到投产发电的全部工程费用。它因内容不同可分为发电工程静态投资、发电工程动态投资。 发电工程静态投资由建筑工程费、设备购!费、安装工程费、其他费用、基本预备费和材料价差组成,其反映的是某一价格水平年的静态造价水平。1998年价格水平中国内发电工程单位造价水平为:2x300MW国产引进型机组新建4422元/kW,扩建3759元/kw,4台机组时4090元/kw;2X600MW国产引进型嫌煤机组新建3675元/kW,扩建3381元/kw,4台机组时3528元/kw;2 x 300 MW等级进口嫩煤机组新建5010元/kw,扩建4460元/kw,4台机组时4735元/kW;2x600MW等级进口燃煤机组新建4640元/kw,扩建4450元/kW,4台机组时4545元/kW。 发电工程动态投资由发电工程静态投资、价差预备费和建设期贷款利息组成,其中价差预备费是指工程从编制年至竣工年期间建筑工程费、设备购置费、安装工程费、其他费用上涨而预备的费用;建设期贷款利息是指工程项目的各类融资在建设期发生的利息。按电力工程单机竣工结算办法,第一台机组及公用系统所发生利息计算到第一台机组投产前一季度,第二台机组投资所发生的利息计算到第二台机组投产,以下类推。1”8年审批的发电工程初步设计概算动态投资情况如下:2台30万新建国产机组为4997元/kW,2台60万扩建国产机组为4481元/kW,2台35万新建进口机组为5588元/kW,2台“万新建进口机组为6388元/kW。由于价差预备费、建设期贷款利息与国民经济发展情况、物价上涨情况、利息变化情况有关,而这些因素往往具有不可预见性,因此从1995年起对工程概算执行“静态控制,动态管理”的政策,即控制静态投资在批准的额度以内,动态投资则可根据实际情况进行调整。