1)CBM Project煤层气项目
1.Risk Management of CBM Project in Operation;煤层气项目运营期风险管理
英文短句/例句
1.Research on Method of Evaluating Economically the Coalbed Methane Project;煤层气项目经济评价方法及应用研究
2.The Evaluation Methodology for Selecting of the Coal-bed Methane′s Blocks and Their Benefits煤层气项目选区及效益综合评价方法
3.Development of Projects by Methane to Markets Partnership;利用甲烷市场化机制发展煤矿区煤层气项目
4.Develop coal-mine methane project through implementing methane to market parthership;利用甲烷市场化机制发展煤矿煤层气项目
5.Design and Application of Computer-aided Decision-making System of Coal Bed Gas Evaluation;煤层气项目经济评价辅助决策系统设计及应用
6.Study on system models of the coal-bed methane project economy evaluation and its application;煤层气项目经济评价系统模型及应用研究
7.Methane to Markets Partnership-Opportunities for Coal Mine Methane Project Development;甲烷市场化合作计划——煤矿煤层气项目开发的机遇
8.Problems in Data Acquisition of 2D Seismic Prospecting for a CBM Project煤层气项目二维地震勘探数据采集中应注意的几个问题
9.THE THEORETIC MODEL OF INTEGRATED ECONOMY EVALUATION ON COAL-BED METHANE PROJECT BASED ON INTERNALIZING EXTERNALITY;基于外部性内部化的煤层气项目综合经济评价模型
10.Financial Appraisal Method for Coalgas Pipeline Transport Project;煤层气管道输送项目的财务评价方法
11.The Promoted Use Coal Rake(Gas) Was Made Generates Electricity Aproject Humble Opinion;推广使用煤层气(瓦斯)发电项目的建议
12.Coalbed methane/coal mine methane development and utilization in China:latest progress and project opportunities;中国煤层气开发利用最新进展及项目机会
13.Economic Evaluation and Prediction Model for Coalbed Methane Development;煤层气开发项目经济评价方法与预测模型
14.POTENTIAL ANALYSIS AND RESEARCH OF DEVELOPING COAL BED METHANE CDM PROJECTS IN HEBEI PROVINCE河北省开展煤层气CDM项目的潜力分析与研究
15.Approaches to Issues of National CBM Resources Assessment of China煤层气资源评价项目中几个重要问题的技术处理
16.Study of Assessment on Environmental Benefits of CO_2-ECBM Project;注CO_2提高煤层气采收率项目的环境效益评价研究
17.The Discussion of the Baseline Methodology of CBM/CMM Power Generation CDM Projects;煤层气发电清洁发展机制项目基准线方法学探讨
18.Technique Designing for the Production of 30×10~4t/a DME Project with Coal Methane Gas in Shanxi Qinshui山西沁水煤层气生产30×10~4t/a二甲醚项目工艺设计
相关短句/例句
coal gasification project粉煤气化项目
3)CBM perspective煤层气目标区
1.The evaluation of CBM perspectives affects the exploration results and it is the basic work for CBM exploration,so it is highly necessary to conduct comprehensive analysis and evaluation on Chinese CBM perspectives.本研究在大量收集煤层气资源基础材料和借鉴前人研究成果的基础上,从地质背景、煤储层、资源以及开发基础等4个因素出发,确定了煤层气矿区评价参数选择标准,建立了煤层气目标区资源评价指标体系,采用无量纲化指标处理并通过层次分析法对中国煤层气矿区进行资源优选排序,确定了中国煤层气开发优选目标及不同优选层次。
4)coal mine construction projects煤矿项目
5)coal-fired power project煤电项目
1.The paper discussed the issues concerning coal-fired power projects pre-planning,including power industry plan- ning,market demand forecoast,facility and technology selection,and comprehensive utilization of resources,which aimed at giving some suggestions on power investment,project planning and analysis.本文从电力规划、市场需求、设备选型与技术进步、资源综合利用等方面,全面论述了煤电项目前期工作的若干问题,旨在为电力投资、编制项目规划、开展项目研究等方面提出专家分析意见。
6)plant of methanol made by Shell coal gasificationShell煤气化制甲醇项目
延伸阅读
煤层气(见煤成气)煤层气(见煤成气)coal-bed gas:see coal derived gas 于煤煤层气(c oal一bed gas)以吸附状态赋存 层内部的煤成气。见谋成气。-