1)non-sequential multipurpose batch plants非顺序型多目的工厂
1.A mixed-integer linear programming(MILP) formulation is presented for scheduling of non-sequential multipurpose batch plants with raw material inventory constraints.提出了一种考虑原料库存约束的非顺序型多目的工厂间歇调度的混合整数线性规划(MILP)模型。
英文短句/例句
1.A Novel Formulation for Scheduling of Non-sequential Multipurpose Batch Plants一种改进的非顺序型多目的工厂间歇调度模型
2.3D Optimization Analysis of Excavation and Support for Underground Powerhouse at Nuozhadu Power Plant;糯扎渡大型地下厂房开挖施工顺序和锚固参数的优化分析研究
3.The Multi-Objective Decision-making and EvaluationMethods for the Noninferior Development Sequenceof Power Plants;电站群非劣开发顺序多目标决策评价方法
4.The Option of Excavation Sequence of Large-sized Underground Cavern and the Research of Construction Technique of Underground Factory;大型地下洞室群开挖顺序选择及地下厂房施工技术研究
5.Scheduling Models with Jobs' Processing Times Being Nonconstant;工件加工时间非恒定的排序模型研究
6.Nuozhadu Underground Powerhouse Cavern Group Study of Rational Sequence Constructiong;糯扎渡水电站地下厂房洞室群施工顺序研究
7."Sorts items alphabetically by Creator"按编写者的英文字母顺序来排序项目
8."Sorts items alphabetically by Schedule"按计划的英文字母顺序来排序项目
9."Sorts items alphabetically by Name"按名称的英文字母顺序来排序项目
10.Application of Abstract Factory Pattern in Accessing Multiple Database抽象工厂模式在多种数据库访问程序中的应用
11.A K-product Uncapacitated Facility Location Problem with Multi-type Clients多类型客户k-种产品的工厂选址问题
12.The Application of Multi-Objective Planning Theory to Optimize Excavation Sequence in the New Tunnel多目标规划理论在新建隧道开挖顺序优化问题中的应用
13.It wasn't any walkover to alphabetize all those names.按字母顺序把所有那些名字都排列出来决非一件轻松的工作。
14.Removes the sorting method you applied. Tasks will be sorted as they are in the project file.取消您应用的排序方法。任务的顺序将与项目文件中的顺序相同。
15.Click Sort alphabetically to make the items in this category appear in alphabetical order by title.单击“按字母顺序排序”可使此类别中的项目按标题的字母顺序显示。
16.Hereby It Establishes a Model for Analyzing Sensitive of Nonlinear and Multifactor of Investment Project;基于多因素非线性敏感分析的工业项目评估模型
17.A structural model for large-scale projects is not far different from a job shop model.一个大型工程项目的结构模型同一个定货加工厂的模型相差不远。
18.Research on m*n Different Ordinal Scheduling Algorithm;m*n不同顺序工件排序算法的研究
相关短句/例句
sequential multipurpose batch plants顺序型多目的工厂
1.The investigation in this paper includes analyzing the operational features of sequential multipurpose batch plants, decomposing the overall batch process spatially into several sub-systems, and presenting a modified MILP formulation for the scheduling of sequential multipurpose batch plants with continuous-time approaches.分析了顺序型多目的工厂间歇生产的特点,建立了一种新的混合整数线性规划(MILP)模型。
3)factoried['f?kt?rid]多工厂的
4)non-same technological process非同工艺顺序
5)punching in order in several working position多工位顺序冲压
6)sequence dispatching加工顺序的安排
延伸阅读
DEQ 目的港码头交货 (……指定目的港) %26#8220;目的港码头交货%26#8221;是指卖方在指定的目的港码头将货物交给买方处置,不办理进口清关手续,即完成交货。卖方应承担将货物运至指定的目的港并卸至码头的一切风险和费用。 DEQ术语要求买方办理进口清关手续并在进口时支付一切办理海关手续的费用、关税、税款和其他费用。 这和以前版本相反,以前版本要求卖方办理进口清关手续。 如果当事方希望卖方负担全部或部分进口时交纳的费用,则应在销售合同中明确写明。 只有当货物经由海运、内河运输或多式联运且在目的港码头卸货时,才能使用该术语。但是,如果当事方希望卖方负担将货物从码头运至港口以内或以外的其他点(仓库、终点站、运输站等)的义务时,则应使用DDU或DDP术语。
