1)secondary beam次梁
1.Based on the architectural condition and the girder layout, several methods for planning secondary beam of an underground garage were given.根据建筑条件及主梁的布置情况,考虑在较大的上部荷载作用下,对8m×6m柱网地下车库楼盖次梁的几种方案进行了分析。
2.Considering the restraining moment of the secondary beam, the paper deduces formulas for calculating torsional moment of edge beam of frame.考虑次梁的约束作用,推导了框架边梁的扭矩计算公式,分析了影响扭矩大小的主要因素。
3.In response to distortional double coordination about deflection and torsion in the storied covery in which major and secondary beams are used,utilizing the angle distortion displacement method and moment equilibrium distribution method of deflection and torsion yields the calculation formula of displacement.针对主、次梁楼盖中正交梁系弯扭变形双协调问题 ,采用弯扭角变位移法与弯扭力矩综合平衡分配法 ,推导出杆端位移、弯矩及扭矩的计算公式。
英文短句/例句
1.Study on Static Behavior of Joint of Steel Sub-Beam and Concrete Beam钢次梁—混凝土主梁节点静力性能研究
2.Simulation of compatibility torsion experiments of a spandrel beam in a long-span prestressed concrete secondary beams floor system大跨度预应力次梁楼盖边梁协调扭转模拟分析
3.Test and Analysis of Compatibility Torsion in the Long-span P.C. Secondary Beams Floor System;大跨度预应力次梁楼盖边梁——楼面梁协调扭转试验及研究
4.Simple Discuss Reasonable Orrangement of Secondary Reinforcing Bar of Primary and Secondarry Beam浅谈主次梁交叉部位负筋的合理排放
5.Subaltern beam different modeling method contrast in PKPMPKPM中次梁不同建模方式的对比
6.Researches on Cooperative Work Mechanism and Design Method of Reinforced Concrete Main-beam-Sub-beam-Slab Structure钢筋混凝土主梁—次梁—板结构协同工作机理及设计方法研究Ⅰ
7.Compatibility Torsion Test of Spandrel Beam with Cast-in-Place Slab in Long-Span PC Secondary Beam Floor System带板大跨度预应力次梁楼盖边主梁协调扭转试验
8.Calculation and Analysis of Frame Supported Shear Wall Structure with Transfer Story of Orthogonal Beams and Secondary Beams;带主次梁转换层框支剪力墙结构计算分析
9.The ANSYS Secondary Development Study for Space Computation Method of Cross Diaphragm in Box Girder;箱梁内横隔梁空间算法的ANSYS二次开发研究
10.The contemptible scoundrel made himself up and went on the stage once more.这跳梁小丑又一次粉墨登场了。
11.She broke her back in a climbing accident.她在一次攀登事故中折断了脊梁骨.
12.Influence on RC beam with glued steel plate of second bearing force二次受力对粘钢加固混凝土梁的影响
13.Secondary Development for GUI of Box Girder Bridge Based on ABAQUSABAQUS箱型桥梁的GUI二次开发
14.Six times she tried to throw her frail thread from one beam to another,and six times it fell short .她六次试图把她那纤弱的细丝从一道横梁系到另一道横梁上去。但是六次都失败了。
15.Treatment consisted of 50 laser exposures across 180° of trabecular meshwork.治疗包括对小梁网进行50次180°的激光照射。
16.Research on operation behaviorevaluation of bridge anchorage based on AHP基于层次分析法的桥梁锚体安全性评价研究
17.The Overflow Weir Instant-formation Technology in Shilianghe Reservoir Reinforcing Project石梁河水库加固工程滚水堰一次成型施工技术
18.Study on Bearing Capacity of Twice-prestressed Composite Structure Continuous Beam;二次预应力组合结构连续梁承载力试验研究
相关短句/例句
Beam[英][bi:m][美][bim]次梁
1.In structural computation with PKPM CAD,beam can be input in two ways,i.采用PKPM CAD软件进行结构计算时,次梁可以按主梁和次梁两种方式进行输入。
2.There are some problems in structure design with PKPM CAD software, such as the input of beams and the load verification on beams, the calculation of crack width, the calculation of internal forces and the disposition of reinforced bars of the special-shaped columns, the loads transfer of the complex structure with wall-supported-by-girder and the cantilever beams on the supported walls and etc.采用PKPM CAD软件进行结构设计时,次梁的输入及其上部荷载的校核、裂缝宽度验算、异型柱的计算及配筋、复杂的墙下托梁结构中荷载的传递以及承重墙上挑梁的荷载传递等方面存在一些问题;在设计与分析过程中,软件的计算结果须经调整。
3)main and second bridge主次梁
1.The stress analysis and the construction supervision on the joint of the main and second bridge;主次梁交接处受力分析与施工监理
4)secondary-beam scheme次梁方案
5)fictitious sub-beam虚拟次梁
6)supports of secondary beam次梁支座
延伸阅读
行次田家澳梁作【诗文】:田家俯长道,邀我避炎氛。当暑日方昼,高天无片云。桑间禾黍气,柳下牛羊群。野雀栖空屋,晨昏不复闻。前登澳梁坂,极望温泉分。逆旅方三舍,西山犹未曛。【注释】:【出处】:全唐诗:卷137_9