1)post-construction后施工
1.Combined with general engineering situations the post-construction method of cast-in-place reinforced concrete coal hopper is introduced.根据施工巨宏热电厂现场的实际情况,介绍了现浇钢筋混凝土煤斗采用后施工的方法,经过施工达到了整个工程的工期和质量目标,给项目管理带来了较好的施工效益。
英文短句/例句
1.Construction cost management of construction enterprise after implement of engineering quantity list pricing;谈工程量清单计价实施后施工企业的造价管理
2.The management and development of construction enterprises after ISO9000 certification;ISO9000认证后施工企业的管理与发展
3.Implementation: Construction, Planting. Maintenance. Post-construction Evaluation.实施: 施工、,绿化、养护 和完工后的评价
4.Then we'll start construction.然后我们就开始施工了。
5.Constructional problems in back gated area and countermeasures for them浅谈后浇带施工质量问题及预控措施
6.The Project Management on the 3th Biding of the Last Part Station Construction of Jin-Jun Railway;金筠铁路站后工程第Ⅲ标段施工管理
7.After the pouring of the reinforced concrete structure construction ribbon common quality problems and preventive measures后浇带施工常见的质量问题及预防措施
8.The measures of concrete late poured band and expansive reinforce tape in construction混凝土后浇带及膨胀加强带在施工中的措施
9.Assist center director in completing the report upon finishing construction with the construction company.在施工完毕后协同学校负责人和施工方共同完成竣工验收报告。
10.The bad weather will set back our building plans.恶劣的天气将使我们的施工计划延后。
11.Post Grouting Construction Technique for Bored Piles with Slurry-supported Wall泥浆护壁钻孔灌注桩后压浆施工技术
12.Construction Method of Replacing the Upper Section of Concrete Poles after Stringing架线后更换混凝土杆上段的施工方法
13.Research on the Deep Excavation Effect of the Interchanging Metro Station;地铁换乘枢纽后建车站施工影响研究
14.Thinking on Implementation of ‘National Natural Forest Protection Project’in Mile County;弥勒县“天保”工程启动实施后的思考
15.Design and construction of late poured band of the super long concrete structure超长混凝土结构后浇带的设计与施工
16.Post-tensioning Producing Method of the Prefabrication of 40 m Prestress Box后张法40m预应力箱梁预制施工技术
17.Analysis on the Anti-seepage Measures in the Danger Removal and Dam Reinforcement Project of Houwan Reservoir后湾水库除险加固工程防渗措施简析
18.Discussion About The Effect After The Implement Of Changing Farmland Into Forest对实施退耕还林工程后续效果的初探
相关短句/例句
the late term of construction施工后期
3)post grouting construction后压浆施工
1.The application of post grouting construction technology at end and lateral of cast-in-place bored pile;钻孔灌注桩桩端桩侧后压浆施工技术应用
4)after-pouring joint construction后浇缝施工
1.Comparison between after-pouring joint construction and nonjoint construction method;对后浇缝施工和无缝施工方法的比较与认识
5)Control after the construction施工后控制
6)post-tensioned construction后张法施工
延伸阅读
安装工程施工安装工程施工installation works anZhuong gongCheng shlgong安装工程施工(installation works)在基本建设工程施工中将设备安装就位并连接成有机整体的工作.设备安装后,经过调整试验和试运行,证明各项安装质量指标符合设计和规程规范的要求,将工程移交给生产单位后,安装工程施工才能宜告结束. 安装工程施工的依据是:设计文件,制造厂技术资料,安装工程施工及验收规范,行业工艺规程、规范,工程质t验评标准,以及安装、调试单位编制的施工方案,安装和调试的措施等。 火电厂安装工程的内容主要有:①锅炉本体安装和锅炉附属设备安装,包括锅炉钢架、汽包、水冷壁、过热器、再热器的焊接和安装,磨煤机、给煤机、引送风机、嫩烧装里、除灰装置的安装,以及管道和金属结构的安装.锅炉安装还包括化学酸洗和水压试验等工序。②汽轮发电机组本体安装:包括汽轮机、发电机本体和管道、给水泵、循环水泵、凝汽器、除氧器、加热器、主油箱、冷油器等设备的安装。③嫌煤系统安装:主要包括翻车机、取料机、皮带运输机、电磁分离器、轨道衡等设备的安装。④电气设备安装:主要包括全厂厂用电系统和升压站系统设备的安装,以及计算机监控和全厂自动化系统的安装。⑤其他设备安装,如桥式起重机、循环水系统、铁路专用线、全厂通信设备等的安装。安装工程还包括分部调试和启动调试工作。 水电站安装工程的内容主要有:①金属结构设备安装,包括各闸门及启闭设备、拦污栅、通航设备、压力管道的安装;②机电设备安装,包括水轮发电机、主变压器及配电设备、机组辅助设备、主闸门、桥式起重机,以及油、气、水、通风、用电、通信、计算机监控及自动化系统设备等的安装。 输变电工程安装分愉电线路安装和变电工程安装。输电线路安装主要包括运输、土石方、基础施工、杆塔安装、架线、附件安装等。变电工程安装主要包括配电装置设备和母线安装、变压器安装、继电保护二次部分和计算机监控与自动化设备、通信设备、全所用电设备等的安装。 在安装工程施工中,需要严格执行质量检查和隐蔽工程验收签证制度,确保工程质量;做好各项技术记录和质检纪录,妥善保管设计变更文件资料;竣工后,按规定的内容向项目法人移交完整的技术资料. 在安装工程施工过程中,还需要保持作业场所的整洁,做到安全文明施工。