后浇带,late poured band
1)late poured band后浇带
1.Plugging reinforcing construction technology of the late poured band in the basement;地下室后浇带堵漏补强施工技术
2.Analysis on the structural late poured band design and the construction quality control;浅析结构后浇带设计和施工质量控制
3.On the construction of concrete late poured band of multilayer architecture;谈多层建筑混凝土后浇带的施工
英文短句/例句

1.Application of After-irrigation-strip Design and Construction in Super-long Cast-in-place Concrete Structure后浇带在现浇混凝土超长结构中的应用
2.Study on Dismantling Mold Base of Post-Pouring Band in Cast-in-place Reinforced Concrete Structure浅探现浇钢筋混凝土结构后浇带模架的拆除
3.Design and construction of late poured band of the super long concrete structure超长混凝土结构后浇带的设计与施工
4.Constructional problems in back gated area and countermeasures for them浅谈后浇带施工质量问题及预控措施
5.On constructional method of replacing after pouring area with expansion to strengthen area of concrete浅谈混凝土膨胀加强带代替后浇带的施工方法
6.The Setting of Embedded Joint for High-rise Concrete Building with Podium简述带裙房高层混凝土建筑后浇带的设置
7.The measures of concrete late poured band and expansive reinforce tape in construction混凝土后浇带及膨胀加强带在施工中的措施
8.Study on Application of the Late Poured Band in Large Scale Plate-type Concrete Structures;后浇带在大尺度板式混凝土结构中的应用研究
9.The Stress Analysis and the Application to the Massive Concrete of the Later Joint-Filled Slots;后浇带的应力分析及在大体积混凝土中的应用
10.A Discussion about the Questions of the Latter Cast Belt in Construction;后浇带造成的临时悬挑构件在施工中的问题
11.Construction Technology of Settlement Late Poured Band of Basement Roof for Advanced Closing地下室顶板沉降后浇带提前封闭施工技术
12.The Presetting and Quality Assurance of Embedded Joint in High-rise Building高层建筑后浇带的留设与施工过程质量控制
13.Use of Embedded Joint in Mass Concrete Tank后浇带施工技术在大体积混凝土水池中的应用
14.Several suggestions about temperature late poured band in basement structure seamless design地下室结构无缝设计中温度后浇带的几点建议
15.After the pouring of the reinforced concrete structure construction ribbon common quality problems and preventive measures后浇带施工常见的质量问题及预防措施
16.The setting scheme of late poured band and attention problems in design and construction后浇带的设置方案及设计施工中应注意的问题
17.Discussion on concrete late poured band design and construction of building construction engineering房屋建筑工程混凝土后浇带的设计与施工初探
18.Analysis of the Temperature and Shrinkage Stress of Over-Long Framed Structure with After-Poured Band and Expansion Reinforcing Strip超长框架结构设置后浇带与膨胀加强带温度收缩应力分析
相关短句/例句

the late poured band后浇带
1.Treatment method of the late poured band;探讨混凝土后浇带处理方法
3)post-pouring strip后浇带
1.Influencing of installation of post-pouring strip to anti-crack;后浇带设置对抗裂效果的影响
2.Construction of post-pouring strip of Shanxi agricultural technique service station;山西省农业技术综合服务基地工程后浇带施工
4)post-pouring belt后浇带
1.The designer can set post-pouring belt,using UEA con- crete and designing pre-stressing concrete structure to avoid the crack caused by temperature and shrinkage.超长混凝土结构的设计和施工中可以采取设置后浇带、采用微膨胀——补偿收缩混凝土或设计无粘结预应力混凝士结构来防止温度收缩裂缝的产生。
2.Authors also advise the design and construction about the anti-crack and anti-seepage of basement from some aspects,such as post-pouring belt,steel reinforcement,concrete,waterproofing materials.结合多项大型地下室工程实践和试验研究,从设计、材料、施工3个方面分析了地下室开裂及渗漏的原因,提出了关于地下室结构后浇带、钢筋、混凝土、防水材料等方面抗裂防渗的设计和构造,并阐述了抗裂防渗高性能混凝土的试验研究和配制原则,以及地下室抗裂防渗的关键施工技术。
5)post-poured strip后浇带
1.Analysis of effect of post-poured strip applying in cracks prevention of gate frusta;设置后浇带对闸墩结构的抗裂作用分析
2.Treating some common problems in the post-poured strip construction process combined with design;结合设计处理好后浇带施工过程中的常见问题
3.Brief analysis of influence of post-poured strips on thermal stresses in concrete main power building for 600MW unit后浇带对600MW机组混凝土主厂房温度应力影响浅析
6)embedded joint后浇带
1.In accordance with related rules and regulations, the article combines with practical engineering to point out the common problems in presetting embedded joint and hereby propose corresponding solutions.文章结合工程案例,依据相关规范要求,对后浇带留设问题进行探讨,指出其施工中存在的质量通病并提出相应的解决措施。
2.It is a common practice to set embedded joint in the construction of mass concrete structure.在钢筋混凝土结构中设置后浇带是目前常采用的一种方法。
3.The article mainly states the function, category and constructional methods of embedded joint for high-rise building with podium and then puts forward the precautious and control measures in the design and construction of the embedded joint.文章重点论述带裙房高层混凝土建筑后浇带的作用、分类和构造做法,以及设计施工中应注意的事项和宜采取的措施。
延伸阅读

板带轧制速度规程(见板带轧制规程设计)板带轧制速度规程(见板带轧制规程设计)speed schedule for plate and strip rolling  bandai zhazhi sudu guieheng板带轧制速度规程(speed seheduxe fo:plateand strip rolling)见板带札制规程设计。