免拆模板,stay-in-place mould
1)stay-in-place mould免拆模板
1.Application of stay-in-place mould in construction of composite concrete shear walls;浅谈免拆模板复合剪力墙体系在施工中的应用
2.Composite shear wall system and mechanical properties of GRC stay-in-place mould;复合剪力墙体系及GRC免拆模板力学性能
英文短句/例句

1.THE TECHNOLOGY OF ASSEMBLED FIELD-CAST CONCRETE WALL WITHOUT DEMOULDING拼装式现浇混凝土墙体免拆模板技术
2.Experimental Study on Non-Dismantling Template of the Concrete Contains Glass Fiber玻璃纤维混凝土免拆模板的实验研究
3.The Aseismic Perfformance Research into Non-Demoulding Formwork Board and Shear Wall Structure System;免拆模板及其剪力墙体系抗震性能研究
4.Designing and Life Cycle Cost Analysis on Composite Shear Wall System with Heat Preservation Formwork;免拆保温墙模复合剪力墙体系模板设计及寿命周期成本分析
5.Application of Non-removal Metal Mesh Formwork in Concrete Construction of Xiluodu Hydropower Station免拆金属模板网在溪洛渡水电站混凝土中的应用
6.Remove the door module from the trim panel.从饰板上拆卸车门模组。
7.The Study of Early-dismantling Template System and Dismantling Template Time of Concrete Structure;混凝土结构早拆模板体系与拆模时间的研究
8.DISCONNECT & REMOVE THE BODY CONTROL MODULE FROM THE JUNCTION BLOCK.从集成板上拆下并移走主体控制模组。*
9.The Application and Development of Earlier Disassembly System of Formworks in Construction;模板早拆体系在施工中的应用和发展
10.Reserch on Printed Circuit Board Electronic Components Dismantling Model and Experiments电路板电子元件拆除模型与实验研究
11.Analysis of construction technology for early dismantlement of floor formwork under the least favorable conditions最不利条件下楼板模板早拆施工技术分析
12.The Research of the Early Removal Formwork System s Impact to the Concrete Structures;建筑施工模板早拆对混凝土结构影响研究
13.Remove left cowl side trim panel.拆下左仪表板侧装饰板。
14.Wall form installation please see attached sketch No.-4. Expended cement mortar shall be used for sealing after form dismantled and pull bolts removed.墙板模板安装见附图4。在模板拆除对拉螺栓拿出后,采用微膨胀水泥砂浆封堵。
15.Calculation Design of Supporting System of Floor Bottom Formwork and Time Control of Formwork Removal浅谈楼板底模支撑系统计算设计及拆模的时间控制
16.Analysis and Study on Energy Efficiency and Anti-Seismic Performance of Complex Shear Walls System without Demoulding Board;免拆墙模复合剪力墙体系保温性能与抗震性能的分析与研究
17.Nonlinear Analysis and Research of Complex Shear-Wall without Moulding Board;免拆墙模复合剪力墙的非线性有限元分析与研究
18.The Experimental Study and Non-Linear Fem Analysis of Thin Shear Wall Without Demoulding of Reinforced Concrete;免拆模薄壁剪力墙抗震性能试验研究及非线性有限元分析
相关短句/例句

non-removal metal mesh formwork免拆模板网
3)moulding board免拆墙模
1.Research on characteristics about complex shearing wall system with moulding board;免拆墙模复合剪力墙体系的特性
4)early form-removal system早拆模板
1.Simple early form-removal system of floor slab structure is put forward considering the defects of traditional formwork.结合楼板结构常规模板存在的缺陷,提出了简易早拆模板体系。
5)formwork assembling and disassembling模板拆装
6)Removing the model boards模板早拆
延伸阅读

NC模板简介 CimatronE 为了加速编程过程和自动化各种操作,使用了各种类型的模板。这篇文章就是描述如何创建 NC 模板和如何使用模板以节省编程时间。 内容 什么是NC模板? 如何使用NC模板来提高工作效率? 如何加载和保存NC模板? NC模板保存在什么地方? 什么是NC模板? NC模板就是包含NC程序和它相关的用于创建刀路的参数。应用模板可以节省时间和编程过程标准化或刀路轨迹生成自动化。
如何使用NC模板来提高工作效率? NC模板有多种使用方法,但事先需将典型的NC程序或刀路轨迹保存为模板,遇到具有相同或相似编程工艺的零件时就可以直接套用NC模板。 如何加载和保存NC模板 ? 加载:当在一个NC文件里,从菜单栏的加工-工具/模板/应用调用你所需要的模板称为加载。 注意,如果在程序管理器窗口里已经选中了一个程序,你只能选择程序模板。你选择的程序模板将被插入到你之前选择的程序之后。自然的,如果模板是基于规则选取了几何,那么模板选择的几何类型将被应用到当前程序里。 如果先程序管理器窗口中已经选中了一个刀路轨迹,系统会允许你选择任何类型的模板。选中的程序模板或刀路轨迹模板将被创建在你选中的刀路轨迹文件之后。 另外在编程时我们可以应用模板修改一个已经存在的程序或刀路轨迹。意思是程序里定义的参数也将被模板的参数覆盖掉。要实现该功能,转到 菜单栏的加工-工具/模板/修改或右键弹出菜单/应用 模板。但是,可选用的模板要由我们在程序管理器里选用的程序来决定,就是用来修改程序的模板必须要与被修改程序类型相同。 保存: 任何加工的刀路轨迹或程序都可以保存成加工模板。要保存模板,在程序管理器里选择你要想保存成模板的程序或刀路轨迹,然后转到菜单栏的加工-工具/模板/保存或右键弹出菜单保存模板。系统将保存你选择的程序或刀路轨迹和它们所包含的参数。如果程序包含通过规则选取的几何,那些选择也将被保存。如果有.JPG图片保存在相同的文件夹,图片可以在加工模板浏览器里显示。图片的名字必须与模板的名字相似,例如 (Template name: 1_FULL-3X-TP.tpt; Picture name: 1_FULL-3X-TP_tpt.jpg). 图片大小应该为 189 像素 宽 X 236 像素高 。