路堤,embankment
1)embankment[英][?m'b??km?nt][美][?m'b??km?nt]路堤
1.Realization of Small Bridge Design under High Earth Filling Embankment;高填方路堤中的小桥设计体会
2.Construction method of filling the embankment of the expressway with the heavily weathered granite;强风化花岗岩填筑高速公路路堤施工方法
3.Study on the characteristic and prediction model for lateral deformations under embankments;路堤侧向变形性状及预测模型研究
英文短句/例句

1.Cooperative solving on embankment settlement based on layer wise summation method and FLAC分层总和法和FLAC联合求解路堤堤身沉降
2.Study on the early settlement of the high-liquid limit soil embankment in southwest mountain areas西南山区高液限土路堤填筑初期堤身沉降研究
3.Technical code for design and construction of highway fly ash embankment公路粉煤灰路堤设计与施工技术规范
4.He ran up the embankment to the railway.他跑上路堤向铁路线奔去。
5.Study on Highway Embankment Construction Technology in High Liquid Limit Soil Area;高液限土地区公路路堤修筑技术研究
6.Study on the Stability and Deformation of Highway s High-Filled Embankment on the Mountainous Area;山区公路高填路堤稳定性和变形研究
7.Study on the Stability of Embankment on Valley -type Soft Ground of Highway高速公路沟谷型软基路堤稳定性研究
8.Research on the Technique of Stone Filled Embankment Construction in Karst Area溶岩地区公路填石路堤施工技术研究
9.High Embankment Design on Mountain Expressway关于山区高速公路高路堤设计的探讨
10.The numerical modeling of soft soil foundation settlement under embankment load路堤荷载下软土路基沉降的数值模拟
11.Application of Fly-ash in Highway Embankment Engineering粉煤灰在高速公路路堤工程中的应用
12.Deep Section of High Embankment Construction Technique of Dynamic Compaction深沟路段高路堤强夯法施工技术初探
13.Physical treating techniques of highway embankments filled with expansive soils膨胀土填筑公路路堤的物理处治技术
14.Research on the application of lower embankment in plain terrain's highway平原区高速公路低路堤推广应用研究
15.Filling the Low Embankment with the Improved Silt and the Study of the Embankment Stability in Capillary Water Effect低路堤填筑的粉土改良及毛细水作用下路堤稳定性研究
16.Pilecap bedding embankment is widely used in practice.桩承垫层路堤在实践中广为采用。
17.A raised bank or path, such as one along a canal.堤岸,小路高出的堤岸或小路,如沿着一条沟渠的堤岸或小路
18.The standard embankment projects标准的堤围(路基)工程
相关短句/例句

road embankment路堤
1.The analysis of the road embankment reinforced by the geograte basing on ANSYS;基于ANSYS的土工格栅加筋路堤分析
2.Application of dynamic compaction to fill of high road embankment;强夯在高路堤填筑上的应用
3.Centrifuge modeling construction of road embankment on soft clay ground软土地基路堤施工控制的离心模拟试验研究
3)roadbed[英]['r?udbed][美]['rod,b?d]路堤
1.The influence of water content on padding roadbed with fine soil and related countermeasures;含水量对路堤细粒填土的影响及对策
2.With the purpose of testifying whether the permeability of roadbed stuffing meets the design requirements,the spot double-ring experimental method is used to test the permeability performance of roadbed stuffing.检测路基填料的透水性是否满足设计要求为目的,采用现场双环原位试验方法来检测路堤填充料的渗透性能,并对渗透系数与填料的级配、含泥量及其粒经不均匀性的关系进行了研究分析,根据试验和分析的结果对工程施工提出了相应的建议与解决途径。
3.Difference from the designing bridge,the dynamic analysis of roadbed is not usually done at the condition of earthquake,but the earthquake failure character of high roadbed will influence the amount work of opening up the broken highway.与桥梁工程不同,公路设计中一般不会进行地震条件的路堤动力分析,但软土地区的高路堤公路在地震作用下破坏特征将会影响到破坏公路的疏通工作量。
4)subgrade[英]['s?bɡreid][美]['s?b,ɡred]路堤
1.The paper introduced technical and economical analysis of highgrade highway high fill subgrade compaction methods for reference.对高等级公路高填方路堤采取强夯压实和振动碾压两种压实方法进行了详细的技术和经济比较,从而为修建高填方工程提供了一个科学依据。
2.Use of veneer cover soil on the slope of expansive soil subgrade is a method to prevent early failure of expansive soil subgrade.膨胀土路堤边坡封面是一种保证其正常使用的工程措施。
5)road bank路堤
1.Constructing skill of powdered coal ash road bank;粉煤灰纯灰路堤施工技术
2.With a construction example of the splice section of Xicheng\|Hu ning expressway,combining project cost and treatment effect,authors analyze and discuss foundation treatment methods in road bank splice section.以锡澄 沪宁高速公路拼接段工程为例 ,结合工程造价、处理效果对公路路堤拼接的地基处理方法进行了分析探讨 ,实践证明 ,采用折线定喷、小角度摆喷的分离式定喷墙方案能明显减少原有路堤的工后沉降 ,施工方便、省时、省钱。
3.Based on theoretical analysis and engineering practice,the stability of road bank and the road surface thickness for preventing frostbite in higher cold region have been studied.通过理论分析和工程实践 ,研究高寒地区路面防冻厚度 ,并对路堤稳定性进行分析 。
6)causeway[英]['k?:zwe?][美]['k?z'we]长堤;路堤
延伸阅读

《国际铁路货物联运协定》  1951年由阿尔巴尼亚、保加利亚、匈牙利、民主德国、 波兰、罗马尼亚、苏联、捷克斯洛伐克等8个国家缔结的协定。中国和朝鲜、蒙古于1953年加入,越南于1955年7月加入,现有成员国为12国。协定自1951年11月1日起生效后,先后经过7次修订,即1953年7月31日莫斯科代表大会、1955年7月30日柏林代表大会、1957年5月25日北京代表大会所通过的修改和补充事项以及1959年5月2日、1964年11月30日、1970年5月29日和1971年4月15日铁路合作组织委员会所核准的修改和补充事项。现行有效的是1974年7月1日起生效的文本。    协定共分8章40条,分别规定了总则,运送契约的缔结,运送契约的履行,运送契约的变更,铁路责任,赔偿请求、诉讼、赔偿请求时效,各铁路间的清算及一般规定。协定对涉及运输双方当事人权利和义务的运送契约的缔结、发货人和收货人的权利与责任、承运人的责任、索赔和诉讼等都作了详细而具体的规定。    协定规定:运单由发货人在托运货物时填写,运单在发货人提交运单中所列的全部货物按发送路国内规定付清所负担的费用后由铁路加盖戳记。运单在加盖戳记后即成为缔结运送契约的凭证。发货人应对他在运单中所记载或声明的事项的正确性负责。由于上述原因以及未将上述事项记入运单内而发生的一切后果,均由发货人负责。发货人还必须将在货物运送全程中为履行海关和其他规章所需的添附文件附在运单上。如发货人不履行此项规定,发站可以拒绝承运货物。由于没有添附文件或文件不齐全、不正确而发生的后果,发货人应对铁路负责。    协定规定:发送路的运费由发站向发货人核收,到达路的运费由到站向收货人核收。通过几个过境铁路运送时,可由发货人支付一个或几个过境铁路的运费,而其余的铁路运费由收货人支付。如发货人未负担任何一个过境铁路运费时,则由到站向收货人核收全部过境铁路运费。如收货人拒绝领取货物,则发货人应支付该批货物的一切运费及罚款。    协定规定:发货人可对运送契约作如下的变更:在发站将货物领回、 变更到站、 变更收货人、将货物返还发站。收货人亦有权在到达国境内变更到站和收货人。但铁路有权在规定的情况下拒绝变更或延缓执行此种变更。由于变更运送契约而发生的一切运费、杂费或罚款和其他费用,均由发货人或收货人负担。货物到站后,收货人只有在货物因毁损或腐坏而使质量发生变化,以致不能按原来用途使用时,才可以拒绝领取货物。承运人在运到期限届满后30日内,仍未将货物交给收货人或未交由收货人处理时,收货人可不提出任何证据认为货物已经灭失。    协定规定:铁路从承运货物时起,至到站交付货物时止,对于货物运到逾期及因货物全部或部分灭失或毁损而发生的损失负连带责任,对发货人在运单内所记载并添附的文件,由于铁路过失而遗失的后果,以及由于铁路的过失而未能执行根据协定提出的运送契约变更申请的后果负责。但是,铁路对于由于不可抗力、货物的自然特性、发货人或收货人的过失等原因造成的货物的全部或部分灭失、减量或毁损和延迟交货不负赔偿责任。    协定规定:发货人和收货人有权根据运送契约提出赔偿请求,赔偿请求应附有相应根据并注明款额,以书面方式由发货人向发送路、收货人向到达路提出。根据运送契约向铁路提出的赔偿要求和诉讼,以及铁路对发货人或收货人关于支付运费、罚款和赔偿损失的要求和诉讼,应在协定规定的时效期限内提出。一般赔偿请求和诉讼的时效为9个月,有关货物逾期运到的赔偿请求和诉讼的时效为两个月。时效期限的计算方法是:关于货物毁损或部分灭失以及运到逾期的赔偿,自货物交付之日起计算,关于货物全部灭失的赔偿,自协定规定的货物运到期限届满后30日起计算;关于补充支付运费、杂费、罚款等要求,自交款之日起计算;如未交款,则自货物交付之日起计算;关于支付变卖货物的余款的要求,自变卖货物之日起计算;在其他所有情况下,自确定成为赔偿请求的根据之日起计算。发货人或收货人向铁路提出赔偿请求时,时效即行中止。从收到铁路拒绝赔偿的通知或自规定的180天期限届满之时起,时效重新开始计算。凡时效期限已过的赔偿请求和要求,也不得以诉讼的形式提出。铁路在收到赔偿请求之日起,必须在180天内审查该项要求并作出答复。如铁路拒绝或部分拒绝赔偿请求,或在180天内不作出答复时,索赔人可向法院提起诉讼。诉讼只能向受理赔偿请求的铁路所属国的适当法院提出。