1)concrete-filled steel tubular arch bridge钢管砼拱桥
1.This paper describes a lifting plan and design method based on finite element analysis(FEA)for concrete-filled steel tubular arch bridges.介绍了大型钢管砼拱桥整体吊装方案和采用有限元法对整体吊装专用吊具系统的结构分析计算,并以此为基础进行设计优化,分析过程中同时采用有限元静力分析和屈曲分析校核,保证了强度和稳定性要求,该设计计算方法已经通过了工程实际的考验,为类似吊装问题提供了有效参考。
2.In terms of constitutive relation of existed initial stress concreted-filled steel tubular,author analyses the influence of initial stress in concrete-filled steel tubular arch bridges.利用钢管砼的本构关系,分析钢管初始应力对钢管砼拱桥稳定承载力的影响程度。
英文短句/例句
1.Theoretic Analysis of Arch Rib Steel Tube Heat-Bending Treatment in Arch-Bridge of CFST;钢管砼拱桥拱肋钢管煨弯工艺理论分析
2.Lasting Antiseptic Technology of Thermal Spraying Coating for Steel Arch Rib of Steel-pipe Concrete Arch Bridge钢管砼拱桥钢拱肋热喷涂长效防腐技术
3.Calculation of stayed buckle cable forces for concrete filled steel tubular arch bridge with long span in process of lifting大跨度钢管砼拱桥拱肋吊装中的扣索索力计算
4.Study on Arch Rib Hoisting Method of Large-span CFST Arch Bridge;大跨径钢管砼拱桥拱肋吊装施工技术的研究
5.Concrete-filled Steel Tube Arch Bridge Construction Technology in the Application of the Third Bridge of XiPing钢管砼拱桥施工技术在西屏三桥中的应用
6.Seismic Analysis and ATMD Control for Concrete Filled Steel Tubular Arch Bridge;钢管砼拱桥的地震响应分析及ATMD减震控制
7.The Under-loading Analysis and Controlling during the Construction for the CFST;钢管砼拱桥在施工中的受力分析及施工监控
8.Finite-Element Analysis for Nonlinear Stabilities of Concrete-Filled Steel Tubular Arch Bridges;钢管砼拱桥非线性稳定性的有限元分析
9.Recent development of study on seismic response of long-span concrete filled steel tubular arch bridge大跨度钢管砼拱桥地震反应分析近期研究进展
10.Effect of Initial Stress and Creep on Bearing Capacity of Four-tube Concrete Filled Steel Tube Arch Bridge;钢管初应力及管内砼徐变对四肢格构型钢管砼拱桥承载力影响研究
11.The Rigidity Analysis in Concrete Pouring Phase and Research on Rigidity in Design for CFST Truss Arch Bridge;桁式钢管砼拱桥灌注过程刚度分析及设计刚度取值研究
12.The Analysis about Time、Geometry、Temperature to Long_Span Concrete Filled Steel Tubular Arch Bridges;大跨径钢管砼拱桥的时间、几何、温度非线性空间分析
13.Imitation and Control of Cables in the Process of Lifting Construction of Span Arch Bridge of Concrete-Filled Steel Tubes Base on the Application Development of ANSYS Software;基于ANSYS软件二次开发的钢管砼拱桥吊装施工控制及仿真分析
14.Discussion on the CFST Arch Main Bridge Construction of North Beicheng River Bridge浅谈北澄子河大桥钢管砼拱主桥施工
15.Research on the Preparation and Construction Technology of Giant Steel Tube-confined Concret Arch Bridge;特大型钢管混凝土拱桥的砼配制及施工技术研究
16.Study on Design Method of Composite Arch Bridge Constructed by Vertical Turning竖转钢-砼组合拱桥结构设计方法研究
17.The Study on Technology of Using Reinforced Concrete Yoke to Strengthen Arch Bridge;钢筋砼套箍封闭主拱圈加固拱桥技术研究
18.The Model Test Study of RC Arch Bridges Strengthened with CFRP and Steel;粘贴CFRP、钢板加固钢筋砼拱桥模型试验研究
相关短句/例句
CFST arch bridge钢管砼拱桥
1.Study on construction control technique in the process of replacing suspender of CFST arch bridge;钢管砼拱桥吊杆更换施工控制技术
2.The theory and practice for construction control in large CFST arch bridges;大跨钢管砼拱桥施工控制的理论与实践
3.The free vibration specialty between half-through CFST arch bridge and CFST deck-type arch bridge was contrasted.研究大跨度上承式钢管砼拱桥在地震激励作用下的响应特性。
3)CFST钢管砼拱桥
1.Nonlinear Stability Analysis of Large-span CFST Arch Bridge;大跨径钢管砼拱桥非线性稳定性分析
2.The Under-loading Analysis and Controlling during the Construction for the CFST;钢管砼拱桥在施工中的受力分析及施工监控
4)CFST arch bridges钢管砼拱桥
1.The calculation of the lofting coordinate of the ring segments for the CFST arch bridges;钢管砼拱桥拱肋节段的放样坐标计算
2.It is the urgent problem for the lofting length of segmental arc in Truss CFST arch bridges to be solved.桁式钢管砼拱桥拱肋放样长度是目前施工中急需解决的问题 ,笔者分析了影响弧长变化的主要因素 ,给出了节段弧长变化的简化计算公式 ,并分析不同弧长变化量对拱轴高程的影
5)CFST arches钢管砼拱
6)reinforced concrete arch bridge钢筋砼拱桥
延伸阅读
宝鸡石油钢管厂大口径薄壁钢管的φ508排辊成形机组宝鸡石油钢管厂大口径薄壁钢管的φ508排辊成形机组 宝鸡石油钢管厂大口径薄壁钢管的中508排辊成形机组