1)Shenzhen Metro line 2深圳地铁2号线
2)Shenzen Metro Line深圳地铁4号线
英文短句/例句
1.Study on Dichophase Project Financing Mode of Shenzhen Metro Line 4;深圳地铁4号线二期工程项目融资模式研究
2.Application of CFG pile on the No.3 line of Shenzhen subwayCFG桩在深圳地铁3号线中的应用
3.Design of auxiliary system for Shenzhen Metro Line 1 extension深圳地铁1号线续建工程车辆辅助系统设计
4.Fireproof design of metro vehicle for Shenzhen Metro Line 1 express深圳地铁一号线增购项目车辆的防火设计
5.Design of Architectural Scheme of Taoyuan Station on No.1 Line of Shenzhen Metro深圳地铁一号线续建桃园站建筑方案设计
6.On the general design for metro line No.3 elevated segment bridge in Shenzhen浅谈深圳地铁3号线高架段桥梁总体设计
7.Reliability of Multifunctional Vehicle Bus for Shenzhen Metro Line 1深圳地铁1号线续建工程多功能车辆总线网络系统的可靠性分析
8.Decision of ATC-antenna fitting mode for Shenzhen Metro Line 1 extension深圳地铁1号线续建工程车辆ATC天线安装方式的确定
9.Study on Construction Method and Whole Structure Design in No .1 Line of Shenzhen Extend Metro;深圳地铁1号线续建工程总体结构设计土建工法研究
10.Detailed Exploration for Geotechnical Engineering of Qianhaiwan Station in Construction of Continued Project of Shenzhen Subway Line 1深圳地铁1号线续建工程前海湾站岩土工程详细勘察
11.Carbody Design for Shenzhen Metro Line 1 Expanding Engineering深圳地铁1号线续建工程铝合金全焊接鼓形车体研制
12.Options of Signaling System for the Extension Project of Beijing Subway Line 4北京地铁4号线延伸信号系统方案分析
13.Analysis of Interface between Vehicle and Signal of Guangzhou Metro Line 4广州地铁4号线列车车辆与信号接口分析
14.Analysis of Troubles in Safety Line of Door System for Guangzhou Metro No.4 Line广州地铁4号线门系统安全线故障分析
15.Analysis of Ground Distortion for Xisi Subway Station on the Line 4 of Beijing Subway北京地铁4号线西四站地面变形与分析
16.CFD Simulation on Tunnel Fire Smoke Control in Beijing Metro the 4th Line北京地铁4号线隧道火灾烟气控制的CFD模拟
17.Traffic Transfer Optimization of Higher Education Mega Center South in Guangzhou No.4 Metro Line广州地铁4号线大学城南站交通换乘优化
18.On Transfinite Treatment of Building Enclosure in the Construction of Foundation Ditch of Daxin Stop深圳地铁罗宝线大新站基坑围护桩侵限处理探讨
相关短句/例句
Shenzen Metro Line深圳地铁4号线
3)Shenzhen Subway Line 1深圳地铁1号线
1.Features of the Design of Shijiezhichuang Station on Shenzhen Subway Line 1;深圳地铁1号线世界之窗站的设计特点
4)Shenzhen metro深圳地铁
1.Driveriess Train Reverse Function in Shenzhen Metro;深圳地铁列车无人驾驶自动折返功能
2.Key techniques of design and construction for the overlapped tunnel in Shenzhen metro;深圳地铁重叠隧道设计与施工技术要点
3.Innovation in the Localization of the Equipment System in Shenzhen Metro;深圳地铁装备系统的国产化创新
5)Shenzhen subway深圳地铁
1.Waterproofing technique in running tunnel of Shenzhen Subway;深圳地铁区间隧道防水施工技术
2.There existed security problems to install pre-tensioned cables on the south side of the pile-group supported foundation pit on Line 3 of Shenzhen subway, and it was difficult to drive perforated steel pipes.针对深圳地铁3号线轨排井基坑施工中预应力锚索存在的安全隐患,考虑设计中的钢花管施工难度较大等原因,结合实际揭露地层,利用有限差分分析程序FLAC3D进行优化设计。
3.A set of stray current monitoring system was designed in accordance with the requirements for monitoring the stray current in Shenzhen subway.介绍深圳地铁3号线杂散电流实时监测系统的设计与应用,系统采用分布式集中监控系统,由参比电极、道床收集网测试端子、高架桥梁收集网测试端子、隧道收集网测试端子、智能传感器、通信电缆、数据通信转接器、PC机管理系统等构成,将监测的数据传输至上位机处理,实现了实时监测的效果。
6)Metro Line 2地铁2号线
延伸阅读
167深圳号167 深圳号,旅海级(051b型)导弹驱逐舰的第一艘,1995年12月在大连造船厂开工建造,1997年10月下水,1999年1月1日加入南海舰队。其主要任务是攻击水面舰艇与潜艇,并有较强的单舰防御能力。该舰还首次装备编队指挥系统,有较强的编队指挥能力。其综合作战能力高出051、052型一倍多。排水量:6000吨(满载)。主尺寸:全长153米;宽16.5米;吃水6米。主 机:codog,48600 马力。航 速:30节。武 器:反舰导弹:4座四联装c-802发射架,射程为120公里(66海里)舰空导弹:1座hq-7(红旗-7)8联装发射架(备弹24枚)1座双管100毫米全自动火炮。4座76甲双管37毫米全自动防空高炮,180发/分,射程3-5千米。反潜导弹:两座四联装长缨-1(cy-1)反潜导弹发射架,射程18公里鱼雷:6具324毫米“白头”b515鱼雷发射管(2座三联装)直升机:2架z-9直升机