1)stability of intermediate column中柱稳定性
2)Stability of pillar矿柱稳定性
1.In the system,rock integrality coefficients are used as input variables and stability of pillar and possibility of partial failure of pillar are used as two output variables.将该推理系统应用于浙江遂昌金矿矿柱稳定性声波测试工程实践中,得到的推理结果与现场实际情况基本一致,即使在声波测点较少的情况下,系统仍具有良好的推理效果。
英文短句/例句
1.Reliability analysis Of the Pillar stability in Bainaimiao Copper mine白乃庙铜矿矿柱稳定性的可靠性分析
2.On Stability Division of Irregular Pillar in a Wollastonite Mine in Zhejiang Province浙江省某硅灰石矿不规则矿柱稳定性区划研究
3.Pillar Stability Analysis and Visual Verification in Deep Mining深井开采矿柱稳定性分析与可视化验证
4.Study and Application on the Stability of the Mine Pillars and Surrounding Rocks in Xiadian Gold Mine;夏甸金矿矿柱及围岩稳定性分析与应用
5.Study on Pillars Stability by Keeping Water in Strip Mining for Small and Medium-sized Mines in Northern Shanxi Province陕北中小矿井条带保水开采煤柱稳定性研究
6.Stability Analysis on-693m Level Insulating Pillar of Deep Excavation of Chambishi Copper Mine谦比希深部开拓-693m水平隔离矿柱的稳定性分析
7.Three-dimensional Stability Analysis on Pillar Wall Rocks for Different Mining Scheme不同采矿方案顶柱围岩三维稳定性分析
8.Analysis on Stability of Supports in Coal Mining Face in High Inclined Seam of Guishan Mine圭山煤矿大倾角煤层采场支柱的稳定性探析
9.Research on the Effect of Safty Pillar Width on GAS Storage Running矿柱宽度对储气库运行稳定性的影响研究
10.Analysis on Stability of Coal Pillar in Goaf Area of No.11 Seam in Tangshangou Mine唐山沟煤矿11号煤层采空区煤柱稳定性分析
11.Control of the Stability of Drift of Non-pillar Sublevel Stoping in Gangli Iron Mine港里铁矿无底柱分段崩落采矿中巷道稳定性控制
12.Study on the Coal Pillar Stability of Deep and High Seam Strip-Partial Mining and Its Impact on the Village in Gucheng Coal Mine;古城煤矿深部厚煤层条带开采煤柱稳定性及对村庄的影响研究
13.Spinal Stability Measure System and It's Application to Ox's Spine脊柱稳定性测量系统及其对牛脊柱的稳定性测量
14.Experimental Simulation and Numerical Analysis of Partial Extraction Pillar Stability--A Case Study of Taiping Coalmine, Jining City, Shandong Province条带开采煤柱稳定性的试验模拟与数值分析——以山东省济宁市太平煤矿为例
15.Study on Stability of Caving 2~# Orebody at Anqing Copper Mine安庆铜矿2~#矿体开采稳定性研究
16.Analysis of Frictional Effect on the Drill Stem Stability in Horizontal Wells考虑摩擦时水平井钻柱的稳定性分析
17.Study on the Overall Stability of Axially Compressed Built-Up Steel Columns with Batten Plate;缀板式格构柱轴压整体稳定性能研究
18.Stability Analysis and Sectional Optimization on the Rack's Column货架立柱稳定性分析与截面优化设计
相关短句/例句
Stability of pillar矿柱稳定性
1.In the system,rock integrality coefficients are used as input variables and stability of pillar and possibility of partial failure of pillar are used as two output variables.将该推理系统应用于浙江遂昌金矿矿柱稳定性声波测试工程实践中,得到的推理结果与现场实际情况基本一致,即使在声波测点较少的情况下,系统仍具有良好的推理效果。
3)stability of coal pillar煤柱稳定性
4)pillar stability煤柱稳定性
1.Numerical simulation on pillar stability in mining of water resources preservation;保水采煤煤柱稳定性的数值模拟
2.Revealed interrelation between pillar stability, stress distribution and partial extraction dimension, recovery ratio, overlying strata features.以山东省济宁市太平煤矿为例,采用煤柱模拟试验和数值分析手段,对薄基岩条带开采时所留设煤柱的应力应变状态、煤柱强度结构及煤柱长期稳定性进行了深入的分析与研究,揭示了煤柱稳定性及煤柱应力分布与条采尺寸、采出率、覆岩特征的相互关系,进行了条带煤柱的稳定性评价,为工程实践提供了理论依据。
5)coal pillar stability煤柱稳定性
1.Analysis of the time-dependence of the coal pillar stability;煤柱稳定性的时间相关性分析
2.On this basis, a calculation program about the coal pillar stability was developed.本论文阐述了一般地质条件下条带煤柱稳定性分析计算方法,分析了特殊地质条件对条带煤柱稳定性的影响,并在此基础上编制了条带煤柱稳定性计算程序;从条带开采地表移动与变形的基本原理出发,深入探讨了地表移动与变形预计的概率积分法,为提高倾斜煤层预计的准确性,引入了等价转换线积分型概率积分法,并探讨了概率积分法理论中误差函数的求解方法,在此基础上,编制了条带开采地表移动与变形计算程序,通过对该程序的测试表明,其计算结果与条带开采地表移动与变形规律相符。
6)spinal stability脊柱稳定性
延伸阅读
连续性与非连续性(见间断性与不间断性)连续性与非连续性(见间断性与不间断性)continuity and discontinuity 11an父ux泊g四f“山。麻以角g、.连续性与非连续性(c。nt,n琳t:nuity一)_见间断性与不间断性。and diseo红ti-