施工时期,excavation period
1)excavation period施工时期
英文短句/例句

1.Generally, this type of preliminary construction is also enquired to carry temporary bridges for both vehicles and pedestrians.通常,施工时期架设临时桥梁来保证车辆及行人通行,也需要这种建设方案。
2.Working Thought Of Construction Management For Project Owner In New Period新时期项目业主施工管理的工作思路
3.Preliminary Discussion on How to Make Good Arrangement for Talents in Landscaping Construction Enterprise in Present New Era;浅谈新时期如何做好园林施工企业人才工作
4.India practiced extensive import substitution when it was industrializing.印度在工业化时期大规模实施进口替代。
5.The Research on Time-dependent Reliability of Concrete Cable-stayed Bridges During Construction;混凝土斜拉桥施工期的时变可靠性研究
6.Options game analysis of bidding opportunity decision for railway construction enterprise;铁路施工企业投标时机决策的期权博弈分析
7.On the Construction Enterprises Management of Receivable Account During the Period of Changing Systems;浅谈改制时期施工企业对应收账款的管理
8.Re-orientation of construction enterprise s leading cadres in the new era;试论新时期施工企业领导干部素质的定位
9.Tasks and measures of hospital statistics in new era;新时期医院统计信息工作的任务与措施
10.Opportunity,Challenge and Countermeasure of the Development of Archives Work in the New Period新时期档案工作发展的机遇挑战与对策措施
11.Research on Establishing Environmental Supervision System of "Three Simultaneities Environmental Protection Facilities During Construction Period建立“施工期“三同时”环境保护措施建设”环境监理制度的分析研究
12.Specification for winter construction of building engineering建筑工程冬期施工规程
13.DESIGN AND INSTALLATION IN TEMPORARY APPLICATION TO HIGH-RISE BUILDING CONSTRUCTION IN FORTUNE CENTER (Ⅱ) APARTMENT BUILDING财富中心二期公寓楼工程超高层建筑施工临时用水设置
14.The first phase (stage) of the infrastructure project基础设施工程第一期
15.The Work of College Communist Youth League in New Times and the Education of Socialist Outlook on Honor and Shame;新时期高校共青团工作与社会主义荣辱观教育的实施
16.A Study of the Necessities and Measures to Enforce the work upon College Students Political Thought;加强新时期高校学生思想政治工作的必要性及措施
17.Technology Research on Real-time Monitoring for Treatment Effect of Karst Geological Conditions in Beijing-Shanghai High-Speed Railway京沪高速铁路施工期岩溶地质处理效果的实时监测技术研究
18.Engineering Quality Management's Characteristics and Measures during the Rapid Expansion Period of Construction Scale建设规模快速扩张时期工程质量管理的特点与措施
相关短句/例句

construction period施工工期
1.Measures to reduce construction period;如何合理缩短工程施工工期
2.Study on construction period risk of jiao-jiang bridge;椒江口大桥施工工期的风险研究
3.Determine the construction period for complex mountain railway in design phase复杂山区铁路设计阶段施工工期确定
3)fertilization time施肥时期
1.A fertilization time experiment is conducted in the spring and autumn respectively,in order to study the effects of fertilization time on the bermudagrass seed production.通过在春秋季分别施肥,研究施肥时期对狗牙根种子生产的影响,结果表明:①不同施肥时期对狗牙根生殖枝数影响显著。
4)N application time施氮时期
5)Topdressing stage追施时期
6)time of adding施入时期
延伸阅读

施工施工construction  shlgong施工(eonstruetion)核电厂建设过程中在工程现场所进行的包括前期工程、土建施工和设备安装在内的全部活动。分施工准备、组织施工和竣工验收三个阶段. 核电厂的建设坚持“安全第一,质量第一”的方针,并依据相关的大纲、程序进行管理。施工准备是保证工程项目具备开工和连续施工的基本条件‘组织施工是工程实施最重要的部分,必须认真做好质量、进度、投资三大控制和安全管理;竣工验收是检查验证完工的建筑物、构筑物及就位的设备、系统的质量、功能符合设计要求,竣工资料真实、完整。核电厂施工要严格按规章制度进行,做到凡事有章可循,凡事有据可查,凡事有人负责,凡事有人监怪。 施工准奋施工准备分为施工组织准备、施工技术准备、施工物资准备及施工现场准备. 施工组织准备工作涉及工程建设的三方,即业主、施工承包单位及监理单位,内容主要包括建立健全组织机构及进行工程管理规划设想.业主的施工管理机构为:施工经理领导下设土建施工、设备安装(核岛、常规岛及电厂辅助设施、电气)、施工支持(文件、测t、设备控制、金属质量、安全)等职能处室,由施工经理统一对外,要求人员精干,职贵明确,建立管理程序,严格按合同和程序办事,高效规范运作。施工单位应按合同规定建立施工组织机构,管理机构要高效精干,建立并实行一级质t保证、两级〔队(厂)与公司级〕质量控制制度,施工机构要与承担的任务相适应.建立、分析人力动员曲线,编写、出版管理程序和工作程序,开展管理及技能培训、工艺评定等。监理单位根据监理委托合同.建立项目监理部,总监理工程师及专业监理工程师应具备核电工程施工管理经验。 施工技术准备主要包括图纸文件及施工组织设计。业主应按合同规定及时将图纸文件交付施工单位,并确认可以使用。施工单位应认真阅读、理解,如有疑问之处,及时向业主提出澄清,由业主或设计单位做出答复。由承包单位编制并经业主(或委托监理单位)审查的施工组织设计是指导现场施工全过程的重要技术文件,其重点是施工方案、进度计划、人员及机具配备、施工平面布置及质量与安全措施.为此,应据此对现场进行统筹规划,科学组织,建立正常合理的施工程序,充分利用空间,争取时间,采用已经成熟的先进施工技术,并进行不利气候因素等风险分析.适当留有余度,以应付施工过程中的某些突发事件。对混凝土人模温度控制、大体积混凝土裂缝控制、反应堆弯顶整体吊装等重要施工方案进行专题分析、论证。 施工物资准备主要包括建筑安装材料、施工机具、永久设备三个方面。对开工必备的材料、机具要安排先期进场。