铁路工程造价,Railway engineering cost
1)Railway engineering cost铁路工程造价
英文短句/例句

1.Studies on the whole process control of railway project cost;关于铁路工程造价全过程控制的思考
2.To improve the railway engineering cost standard system and consolidate the railway construction investment control basis;完善铁路工程造价标准体系 夯实铁路建设投资控制基础
3.THE APPLICATION OF SELF ADAPTIVE FILTER IN ESTIMATING CONSTRUCTION COST OF RAILWAY ENGINEERING自适应过滤技术在铁路工程造价估测中的应用
4.Links likely to create deviations in the determination of railway engineering cost;铁路工程造价确定中容易产生偏差的环节
5.Measures to strengthen self building of railway engineering cost consulting organs;铁路工程造价咨询机构加强自身建设的措施
6.Comparative analysis of construction cost levels between railway engineering and highway engineering铁路工程与公路工程造价水平对比分析
7.Explorations of factors influencing engineering cost in passenger dedicated railway projects铁路客运专线工程造价影响因素探讨
8.Reasonably Definite The Cost Of Overseas Railway Engineering Project,;合理确定国外铁路工程项目的工程造价
9.The Research of Standard System of Earlier Stage Cost Making of Railway Project;铁路建设项目前期工程造价计价标准的研究
10.Application of total process cost control in railway capital investment;全过程造价管理在铁路工程投资中的应用
11.Construction scheme design and engineering cost of mountainous high speed railways;山区高速铁路施工组织设计与工程造价
12.Initial exploration of engineering cost management ofconstruction enterprises under new modes;新模式下铁路施工企业工程造价管理初探
13.Analysis of Construction Organization Design and Engineering Cost for High-grade Railway高等级铁路施工组织设计和工程造价探析
14.Cost Management of Geotechnical Engineering in The Railway Construction Projects;铁路建设项目中岩土工程造价管理问题的研究
15.Initial discussion on the relationship between the type of subway track laying and the engineering cost thereof;地铁线路的敷设方式及其与工程造价的关系
16.Influence of High-Performance Concrete to the Cost of Railway Bridge Engineering高性能混凝土对铁路桥梁工程造价的影响分析
17.Railway projects engineering cost control under the conditions of EPC contractsEPC合同条件下的铁路建设项目工程造价控制
18.On the factors affecting railway architectural project costs at design stage设计阶段影响铁路建筑工程造价的因素分析
相关短句/例句

highway construction cost公路工程造价
1.Analysis on the impact of highway construction cost on project under corporation responsible system浅析项目法人制对公路工程造价的影响
2.Because of highway construction market competition aggravated, engineering quantities and costs are presented by fuzzy analogue rapid dynamic method according to the demand of dynamic control on highway construction cost and its datum.面向公路建设市场竞争的加剧 ,根据我国公路工程造价迫切需要实行动态控制的要求 ,充分利用我国高速公路的工程造价资料 ,提出利用模糊类比快速动态地评估项目工程量及其造价的合理
3.Aiming at the development of information technology and the change of cost management mode, the stepwise implemenation strategy for developing the highway construction cost management information system (HCCMIS) in Web environment is put forward.针对信息技术的发展和造价管理模式的转变 ,提出了 Web环境下公路工程造价管理信息系统开发目标设定的逐层实现策略 ,设定了系统开发的总体目
3)highway engineering cost公路工程造价
1.Management and control of highway engineering cost in construction stage;施工阶段公路工程造价的管理与控制
2.Influence of the management of highway engineering cost after acceding to the WTO;加入WTO对公路工程造价管理的影响
3.A model of highway engineering cost estimation based on neural networks;基于神经网络的公路工程造价推测模型
4)highway project cost公路工程造价
1.As an auxiliary subsystem of highway project informatization management,the highway cost information system(HCIS) can greatly enhance the efficiency of highway project cost management.公路工程造价信息系统(HCIS)是公路工程信息化管理的辅助子系统,可大大提高公路工程造价管理的效率。
5)engineering cost工程造价
1.The importance of engineering cost management in development of construction enterprises;工程造价管理在建筑施工企业发展中的重要性
2.On the prophase management and the control of the engineering cost;浅谈工程造价的前期管理和控制
3.Study on the influence of the contract management on the engineering cost;合同管理对工程造价影响的研究
6)project cost工程造价
1.Full process controlling and management of constructing item project cost;建设项目工程造价的全过程控制与管理
2.Exploration and practice of the case teaching method in project cost;案例教学法在工程造价中的探索与实践
3.Project Cost Management Reform and Control Methodology;工程造价管理改革与控制方法浅论
延伸阅读

发电工程造价发电工程造价power project construction cost fadion gongeheng zoojlo发电工程造价(power projeet constructioncost)指发电工程从前期工作开始,到投产发电的全部工程费用。它因内容不同可分为发电工程静态投资、发电工程动态投资。 发电工程静态投资由建筑工程费、设备购!费、安装工程费、其他费用、基本预备费和材料价差组成,其反映的是某一价格水平年的静态造价水平。1998年价格水平中国内发电工程单位造价水平为:2x300MW国产引进型机组新建4422元/kW,扩建3759元/kw,4台机组时4090元/kw;2X600MW国产引进型嫌煤机组新建3675元/kW,扩建3381元/kw,4台机组时3528元/kw;2 x 300 MW等级进口嫩煤机组新建5010元/kw,扩建4460元/kw,4台机组时4735元/kW;2x600MW等级进口燃煤机组新建4640元/kw,扩建4450元/kW,4台机组时4545元/kW。 发电工程动态投资由发电工程静态投资、价差预备费和建设期贷款利息组成,其中价差预备费是指工程从编制年至竣工年期间建筑工程费、设备购置费、安装工程费、其他费用上涨而预备的费用;建设期贷款利息是指工程项目的各类融资在建设期发生的利息。按电力工程单机竣工结算办法,第一台机组及公用系统所发生利息计算到第一台机组投产前一季度,第二台机组投资所发生的利息计算到第二台机组投产,以下类推。1”8年审批的发电工程初步设计概算动态投资情况如下:2台30万新建国产机组为4997元/kW,2台60万扩建国产机组为4481元/kW,2台35万新建进口机组为5588元/kW,2台“万新建进口机组为6388元/kW。由于价差预备费、建设期贷款利息与国民经济发展情况、物价上涨情况、利息变化情况有关,而这些因素往往具有不可预见性,因此从1995年起对工程概算执行“静态控制,动态管理”的政策,即控制静态投资在批准的额度以内,动态投资则可根据实际情况进行调整。