西安枢纽,Xi an pivot
1)Xi an pivot西安枢纽
1.By analysis and research on the present situation and the existed problems of Xi an pivot,author presents and elaborates the significence of selecting the northsouth circuit railway and the position of the second passenger station.通过对西安枢纽现状及存在问题的分析研究 ,提出并阐述修建枢纽南北环线及第二客站位置选择的意义。
英文短句/例句

1.Discussion on scheme design of Xi'an hub new built north ring railway line浅谈西安枢纽新建北环铁路线路方案设计
2.Transient Construction Plan of Departure Yard on Up Line of Xinfeng Station in Xi’an Railway Terminal西安铁路枢纽新丰站上行出发场过渡施工方案
3.Xi'an railway hub Beihuan line important bridge operation management and maintenance西安铁路枢纽北环线重点桥梁运营管理及养护
4.Discussion on embedment method of safety monitoring instruments for Changzhou water project广西长洲水利枢纽项目安全监测仪器埋设方法经验谈
5.Research on Design of Transfer Space of Urban Public Transport Hub--With Beijing Xizhimen Traffic Hub as an Example城市公共交通枢纽换乘空间问题分析——以北京西直门交通枢纽为例
6.Safety management for excavation of underground chambers and tunnels of Baise multipurpose dam project百色水利枢纽地下洞室开挖安全管理
7.Reservoir area inhabitant resettlement planning design for Changzhou hydraulic complex;长洲水利枢纽库区移民安置规划设计
8.Safety Management of Changzhou Hydraulic Complex and Buckets Effect长洲水利枢纽安全管理与“水桶定律”
9.Study on River Bed Erosion Below Changzhou Reservior in Xunjiang River广西浔江长洲枢纽坝下河床冲刷研究
10.The Northwestern Pacific area:A geopolitical junction in the 21th century;西北太平洋:21世纪的地理——政治枢纽
11.Within a range of 500km around the provincial capital city of Hefei lives a population of 500million people, with the aggregate GDP accounting for nearly 40% of that in the whole country.随着内通外畅的综合交通网的形成,安徽承东启西、呼南应北的枢纽位置日益凸显。
12.Retrospection and consideration on the resettlement of Sanmenxia and Xiaolangdiprojects in the Yellow River三门峡、小浪底水利枢纽移民安置的回顾与思考
13.The resettlement implementation & management of Ni'erji water conservancy project尼尔基水利枢纽工程移民安置实施管理
14.Research on Safety and Stability of a Dam with Floatage Drains of Feilaixia Hydropower Project;飞来峡水利枢纽排漂坝段安全稳定性研究
15.Design and Implementation of Safety Monitoring System for Nierji Hydrologic Hinge;尼尔基水利枢纽安全监测系统的设计与实现
16.Characteristics of Resettlement for Villages at Reservoir Area of Changzhou Hydraulic Complex;长洲水利枢纽工程库区农村移民安置实施特点
17.Migrant relocation in construction of Wangfuzhou Project on Hanjiang River;汉江王甫洲水利枢纽建设中的移民安置
18.Existing problem and suggestion of the migration-setting work of BMPDP;百色水利枢纽移民安置工作存在的问题和建议
相关短句/例句

Xiniu Project西牛枢纽
1.General Latout Study on Xiniu Project of Lianjiang River;通过枢纽整体水工模型试验,从多方面对连江西牛枢纽工程的平面总体布置方案进行了优化比选,从而选出通航条件好、工程量小、河道演变较稳定的左岸方案Ⅱ作为推荐方案。
3)Huai an project淮安枢纽
1.Crack control measures of underpass culvert concrete structure for Huai an project;淮安枢纽立交地涵混凝土结构防裂措施
4)Guangxi Yujiang navigation junctions广西航运枢纽
5)upstream of Xijin Junction西津枢纽上游
6)Xiniu Navigation Junction西牛航运枢纽
1.Being the last navigation step not constructed yet in the planning of Lianjiang River Whole-Line Canalization Works, Xiniu Navigation Junction has favorable construction conditions and may achieve remarkable comprehensive benefit after construction, thus it is of trans-epoch significance.连江渠化过程历史悠久 ,西牛航运枢纽是连江全线渠化工程规划中的最后一座未建航运梯级 ,其建设条件优越 ,建成后综合效益显著 ,具有重要的跨时代意义。
延伸阅读

长江三峡水利枢纽鸟瞰图长江三峡水利枢纽鸟瞰图  长江三峡水利枢纽鸟瞰图 《中国建设企业百强榜》