1)temper mill平整机
1.Measurement of chatter marks on the backup roll of a cold temper mill;冷轧平整机振纹实测研究
2.Application of new hydraulic roll bending control system for temper mill;新型液压弯辊控制系统在平整机上的应用
3.Research of coordinated control technology for elongation,rolling force and tension of temper mill;平整机延伸率、轧制力及张力的协调控制技术
英文短句/例句
1.Elongation automation system of double stands skin miller双机架平整机延伸率自动化控制系统
2.Research on Modeling and Control of 1500 Temper Rolling Mill Force System1500平整机轧制力系统建模与控制研究
3.Study on Work Roll Shifting Strategy for 2250 Hot Temper Mill in Wisco武钢2250热轧平整机窜辊策略的研究
4.Technology for Controlling Elongation on 1 500 mm Cold Rolled Skin Pass Mill in Angang鞍钢1500mm冷轧平整机组延伸率控制技术
5.Technology Research of 2-high UCM Temper Mill for Thin Strip薄带钢过双UCM平整机生产技术研究
6.Elongation Control Technique of Temper Mill for 1500mm Cold Rolling1500mm冷轧平整机的延伸率控制技术
7.2250 mm Leveling Machine Production Line Craft and Equipment2250mm平整机生产线工艺及设备
8.Technology of Online Setting Shape Parameter in Double Frame UCM Tempers双UCM平整机组板形参数在线设定技术
9.Elongation control technique for baosteel 1550mm CAL temper mill宝钢1550连续退火机组平整机延伸率控制技术
10.equalizing stenter整幅拉幅机,平幅机
11.The road was cleared with a bulldozer.道路用推土机平整好了。
12.Airport Platform Contractors Joint Venture新机场平台平整工程联营公司
13.Level camera on tripod head. Set lens to f/8.把相机在架顶放平,镜头调整到f/8。
14.The bulldozers quickly leveled off the site.堆土机很快把工地整平了。
15.The bulldozers quickly levelled off the site.推土机很快就把工地整平了。
16.Theoretical and Technical Research on Wet Temper Rolling with Dual-rack and Great Extension双机架大延伸湿平整理论与工艺研究
17.Walking control for biped robots on uneven ground不平整地面上双足机器人的步态控制
18.To clear, dig up, or move with a bulldozer.用推土机整地用推土机消除、削平或挖出
相关短句/例句
skin pass mill平整机
1.Elongation assignment of steel plates between a tension leveler and a skin pass mill for the Acid-Refined 2030 in BaoSteel;宝钢2030酸洗机组中拉矫机和平整机的延伸率分配
2.Improvement of tension control system of skin pass mill;平整机张力控制系统的改进
3.Speed control system of skin pass mill in Cold Strip Rolling Mill of Wuhan Iron &Steel Group Company;武钢冷轧厂平整机速度控制系统
3)temper rolling mill平整机
1.A high-resolution high-speed rolling force model for cold strip temper rolling mill;冷轧带钢平整机高精度高速度轧制力模型开发
2.Measures to improve the strip shape control of temper rolling mill;提高冷轧平整机组板形控制能力的措施
3.Analysis of the cause of edge abrasion mark of upper work roll of temper rolling mill and its preventive measures;平整机上工作辊边部擦伤原因及防止措施
4)skin mill平整机
1.Research of raising precise prediction model on 1220 skin mill;提高1220平整机预测精度模型研究
2.A 3-D rolling model of four-high skin mill,in which the rolls′ elastic deformation is coupled with sheet′s elastic-plastic deformation,has been built using large deformation elastic-plastic finite element method(FEM).采用大变形弹塑性有限元法将辊系弹性变形与带材弹塑性变形耦合在一起建立四辊平整机三维模型。
5)temper mill model平整机型
6)whole machine balance整机平衡
1.The methods of damping of vibration from three directions of whole machine balance, dynamic damper and vibration isolation are presented on the base of the researching to the reason of creating vibration for horizontal centrifuge.在对卧式离心机产生振动原因进行分析研究的基础上 ,提出了从整机平衡、动力减振和隔振三方面着手的减振方法 ,并介绍了这些方法的基本思路和实际使用效
延伸阅读
场地平整 在建设区域内,为建筑施工创造条件,按设计要求进行的填挖土石方作业。平整场地前应先做好各项准备工作,如清除场地内所有地上、地下障碍物;排除地面积水;铺筑临时道路等。 选择场地设计标高的原则是:①在满足总平面设计的要求,并与场外工程设施的标高相协调的前提下,考虑挖填平衡,以挖作填;②如挖方少于填方,则要考虑土方的来源,如挖方多于填方,则要考虑弃土堆场;③场地设计标高要高出区域最高洪水位,在严寒地区,场地的最高地下水位应在土壤冻结深度以下。 施工测量 根据施工区域的测量控制点和自然地形,将场地划分为轴线正交的若干地块。选用间隔为20~50米的方格网,并以方格网各交叉点的地面高程,作为计算工程量和组织施工的依据。在填挖过程中和工程竣工时,都要进行测量,做好记录,以保证最后形成的场地符合设计规定的平面和高程(见工业建设施工测量、工业建设竣工测量)。 土石方调配 通过计算,对挖方、填方和土石方运输量三者综合权衡,制定出合理的调配方案。为了充分发挥施工机械的效率,便于组织施工,避免不必要的往返运输,还要绘制土石方调配图,明确各地块的工程量、填挖施工的先后顺序、土石方的来源和去向,以及机械、车辆的运行路线等。 施工机械选择 根据具体施工条件、运输距离以及填挖土层厚度、土壤类别,作下列选择:①运距在100米以内的场地平整以选用推土机最为适宜。②地面起伏不大、坡度在20°以内的大面积场地平整,当土壤含水量不超过27%,平均运距在800米以内时,宜选用铲运机。③丘陵地带,土层厚度超过3米,土质为土、卵石或碎石碴等混合体,且运距在1.0公里以上时,宜选用挖掘机配合自卸汽车施工。④当土层较薄,用推土机攒堆时,应选用装载机配合自卸汽车装土运土。⑤当挖方地块有岩层时,应选用空气压缩机配合手风钻或车钻钻孔,进行石方爆破作业。 填方压实 土石方的填筑作业分为土工构筑物和回填土两类。其应共同遵循的原则是:填方要有足够的强度和稳定性;土体的沉陷量力求最小。因此必须慎重选择填筑材料,并规定科学的填筑方法。含水量大的土、淤泥和腐殖土都不能用作填筑材料。所有的填方都要分层进行,每层虚铺厚度应根据土壤类别、压实机械性能而定。填方边坡的大小也要根据填筑高度、选用材料的类别和工程重要性,做出恰当的选择。填方的压实一般采用碾压、夯实、振动夯实等方法。大面积场地平整的填方多采用碾压和利用运土机械和车辆本身,随运随压,配合进行。填土在压实过程中,一般应配合取土样试验干容重,测试密实度,保证符合设计要求后方可验收。
