三峡电站,three gorges power station
1)three gorges power station三峡电站
1.Review and Prospect of Main Protection Design for Hydro-Generators of Three Gorges Power Station;三峡电站水轮发电机主保护设计回顾与展望
2.Influence of Peak Modulation of Three Gorges Power Station in Flood Season on the Navigation Conditions of the Reach Between the Two Dams;三峡电站讯期调峰对两坝间河段通航条件影响的研究
3.Effects of peak regulation at Three Gorges Power Station on navigation;三峡电站调峰流量对航运的影响分析
英文短句/例句

1.Domestic Manufacture of Three Gorges Power Station 700 MW Hydro-generating Unit三峡电站700MW水轮发电机组国产化实践
2.Application of positioning technology to ALSTOM generator set installation in Three Gorges hydropower station三峡电站ALSTOM发电机组定位技术方案
3.Study on the Casting Process of the Three Gorges Turbine Blade三峡电站水轮机叶片的铸造工艺研究
4.The Rigidity and Strength Analysis on Hydraulic Turbine Runner of the Three Gorges Power Station(Right Bank)三峡电站(右岸)水轮机转轮刚强度分析
5.Exploration into PROFIBUS-DP based network communication for lifting equipment in The Three Gorges’ power plant三峡电站起重设备PROFIBUS-DP网络通讯初探
6.Analysis of water level at Yichang Station due to daily storage of the Three Gorges power station三峡电站日调节对下游宜昌站水位的影响
7.The Electric Capacity Benefit of the Three Gorges Hydropower Stationat Water Storage Level 135 m in the Situation of Cofferdam;三峡电站蓄水位135m围堰发电的容量效益
8.Field Measurement and Analysis on Very Fast Transient Overvoltage of GIS in Three Gorges Power Plant三峡电站GIS快速暂态过电压现场试验及分析
9.Sanxia hydro-power will supply electric power to Henan province after completion of construction.三峡水电站建成后将向河南电网供电。
10.Application of Arc-extinguishing and Over-voltage Protection Device at the Three Gorges Project Power Service Station and the Three Gorges Dam Area消弧及过电压保护在三峡电源电站和三峡坝区35kV系统中的应用
11.The Studies on the Operation Management of the Sanmenxia Hydropower Station;三门峡水电站运营管理若干问题研究
12.Analysis of VGS Unit Thrust Bearing for Three Gorges Left-bank Power-plant三峡左岸电站VGS机组推力轴承分析
13.Concrete construction techniques for Three Gorges underground power hause三峡水电站地下厂房混凝土施工技术
14.Features of the Alarm Mechanism of Computer Supervisory System of Three Gorges Right Bank Power Station三峡右岸电站监控系统报警机制特点
15.Layout and maintenance of construction control network of Three Gorges Underground Powerstation三峡地下电站施工控制网布设与维护
16.The Researching of Turbine Main Parameters Selection for Three Gorges Right Bank Power Station三峡右岸水电站水轮机参数选择研究
17.Function Design and Implementation of AVC in Three Gorges Right Bank Hydropower Station三峡右岸电站AVC功能设计及实现方法
18.Electric braking on the right bank of the Three Gorges power station on the relay the impact of downtime三峡右岸电站电气制动停机对继电保护的影响
相关短句/例句

Three Gorges Hydropower station三峡电站
1.Application of positioning technology to ALSTOM generator set installation in Three Gorges hydropower station三峡电站ALSTOM发电机组定位技术方案
2.Using this model the optimum compensating dispatching in the cooperation of Three Gorges hydropower station with the hydropower station group .在对三峡电力系统及电网内大型水电站特性分析的基础上,以提高水电站群整体调峰能力为目标,建立了水电站群优化补偿调度计算模型;并应用该模型对三峡电力系统水电站群与三峡电站联合运行进行了优化补偿调度研究。
3.Taking Three Gorges hydropower station as engineering background,the linear interpolation technique to construct the pulsating pressure in the whole hydro-turbine flow passage is brought based on VGS hydro-turbine model test and finite element method.三峡电站厂房结构的振动问题是三峡工程建设的关键问题之一。
3)Three Gorges project三峡电站
1.Manufacturing Technological Analysis for Hydraulic turbines of Three Gorges Project;三峡电站水轮机制造工艺分析
2.Research on Operating Stability of Hydraulic Turbines for Three Gorges Project;三峡电站水轮机运行稳定性研究
4)Three Gorges Hydropower Plant三峡电站
1.Analysis of 500 kV GIS Very Fast Transient Overvoltage in Three Gorges Hydropower Plant;三峡电站500kV GIS快速暂态过电压分析
2.Peak Regulation Capacity Analysis for the Three Gorges Hydropower Plant in Initial Operation Stage;三峡电站初期运行期调峰能力分析
3.The Rapid-drop Gate of the Three Gorges Hydropower Plant三峡电站机组进水口快速工作门
5)TGP三峡电站
1.Experiment Study on the Influence of TGP Regulate Peak Flood to the Navigational Condition Between Two Dams;三峡电站汛期调峰对两坝间通航条件影响试验
2.In technology design stage,the cushion layer embedding and pressure controlled embedding patterns for TGP s unit spiral case were studied,and study for direct embedding scheme was conducted based on designed pressure controlled scheme in pre-stage.三峡电站机组蜗壳在技术设计阶段研究了保压方案和垫层方案,直埋方案研究是在先期按保压方案设计的基础上进行的。
3.A large quantity of output of gigantic TGP will be sent to Mid-China Electric System, and will be over 10% capacity of the system, hence, it will give an important impact to the system.三峡电站地处华中,规模巨大,建成后送华中容量超过华中电网装机总容量10%,将对华中电力系统的运行产生重要影响。
6)Three Gorges Hydropower Station三峡水电站
1.Principles and Operation Condition of Reactive Power Regulation of Generating Units at Three Gorges Hydropower Station;三峡水电站机组无功调节原理及其运行情况分析
2.Measurement Analysis and Practice of Insulation of Generator Stator Windings on Three Gorges Hydropower Station;三峡水电站发电机定子绕组绝缘测量分析与实践
3.Analysis on Vibration Test in Site for Unit of Three Gorges Hydropower Station;三峡水电站机组现场振动测试分析
延伸阅读

电站1.用发电设备将其他形式的能量转变为电能的企业单位。