工期,Construction period
1)Construction period工期
1.On the multiobjective resource optimisation under the settled construction period;工期固定多目标资源优化的方法
2.Discussion on determining construction period for catenaries of electrification projects of existing railways;谈既有线电气化接触网工程施工工期的确定
3.Construction technical assurance of powerhouse works for Gongboxia Hydropower Station after its construction period reduction;公伯峡水电站厂房工程工期压缩后的施工技术保障
英文短句/例句

1.prevent employees from working during a strike.在罢工期间阻止工人工作。
2.money paid to strikers from union funds.联合会基金付给罢工期间工人的工资。
3.The factory machines lay idle during the workers' strike.在工人罢工期间, 工厂的机器都闲置着.
4.One million man - hours were lost through industrial action.在工人罢工期间损失了100万工时。
5.How to Control the Construction Limit Time for a Highway or Municipal Project;在高速公路工程施工中如何确保工期
6.These are stored in the Duration1, Duration2, and Duration3 fields respectively.这些信息分别保存在“工期1”、“工期2”和“工期3”域中。
7.I work Monday(s) to Friday(s).我星期一至星期五工作.
8.Electronic Engineers《电子工程师》(期刊)
9.Wages are paid on Fridays.每星期五 发工资.
10.Specification for winter construction of building engineering建筑工程冬期施工规程
11.Women workers are entitled to maternity leave with full pay.女工产假期间工资照发。
12.It was a summer job, lasting five weeks.那是一份为期5个星期的暑期工作。
13."I work from Tuesday to Saturday, and Sunday and Monday are my days off."我从星期二到星期六工作,星期日和星期一休息。
14.The Conditions of British Working Class Women in Factories During the Industrial Revolution;论工业革命时期英国工厂女工的状况
15.Your work has Been remarkaBle this week.这星期你的工作很出色。
16.He gets his pay each Thursday.他每星期四领工资。
17.interim audit work of cash对现金的期中审计工作
18.Must you be in Sunday's work?你必须在星期天工作吗?
相关短句/例句

Time limit for a project工期
1.Econmically optimization of time limit for a project;建设项目总工期经济最优化评判
2.Dissertation on the investment,time limit for a project and quality control of construction projects;建设项目的投资工期和质量控制
3.The Dialectical Relationship between Cost of Construction and Time Limit for a Project;建筑工程造价与工期的辩证关系
3)time limit工期
1.Balance relationships among time limit,quality and cost;论如何平衡项目工期和质量及成本的关系
2.Research on methods of managing various factors affecting construction activities and time limit responsibility with factor analysis method;因素分析法管理多因素影响施工活动工期责任的方法研究
3.Detailed discussion is also made on the question that how to increase engineering quality,reduce time limit and cost control,in order to fine the optimum management and control method to create excellent project with high quality and benefits.针对质量、工期和成本在建设项目中的重要性,指出了这三个要素之间的联系,就如何提高工程质量、缩短工期及控制成本管理策略三方面进行了深入探讨,以寻找这三个要素的最佳结合点,从而创造高质量、高效益的精品工程。
4)time[英][ta?m][美][ta?m]工期
1.Construction time-cost-quality trade-off based on genetic algorithms;基于遗传算法的项目工期成本质量综合优化
2.Analysis of time-cost-quality tradeoff optimization in construction project management;工程项目管理中工期—成本—质量综合均衡优化
3.Analysis of integrated time-cost-quality optimization in construction project;关于工程项目工期、成本、质量综合优化的思考
5)construction time工期
1.Analysis of risk probability of construction time for Taihangshan tunnel;太行山隧道施工工期的风险概率性分析
2.The paper discusses the application of CPM in project contract which involves construction time and how contractors can use CPM to claim in order to ensure their benefits.就CPM在工程承包中对于工程工期管理的方法,使承包商应用它进行索赔维护其利益进行研究和讨论。
3.As a result of adopting the sectional construction method,the construction time was greatly cut short,and a remarkable economic benefit attained.针对储库筒仓的结构特点和工期成本,矿渣微粉工程储库筒仓10。
6)period[英]['p??ri?d][美]['p?r??d]工期
1.Railway construction period scheme comparison and analysis between Jingzhou to Yueyang荆州至岳阳铁路建设工期方案比较分析
2.It’s construction speed immediately influence coal mine’s, and mine construction’s early completion play a crucial role in later operation and maintenance, so improved the management level of shaft engineering,speedy the construction speed, shorten the construction period is a question which urgently awaits to be solved for coal mine enterprise.井巷工程是煤矿基本建设中的重点工程,其工程量和投资额一般占煤矿建设的60%以上,井巷工程建设工期直接影响着煤矿建设的速度。
3.The paper discusses the construction period forms of construction enterprises\' general contract projects.对于施工企业总承包项目的工期反映形式进行讨论,从工期确定、工期管理、工期索赔和技巧等角度,结合具体的案例,对工期索赔和相应的费用进行了分析。
延伸阅读

建设工期  建设项目或单项工程在建设过程中耗用的时间。即从设计文件所列工程正式破土动工到建成投产(生产出设计规定的合格产品)或交付使用为止所需要的时间,包括建筑、安装、试车、验收、交付使用等所需要的时间,但不包括施工准备时间。一般按日历工月数计算,并明确建设起止年限。    建设工期是具体安排计划、签订经济合同、组织施工、检查工程进度的依据,也是从建设速度的角度反映和考核投资效果的指标。缩短建设工期,尽快形成生产能力,既能减少基本建设投资的占用,节约投资支出,又能为增加额外社会产品和国民收入创造物质技术条件,并使企业能比计划或工期定额规定的时间提前而获得更多的盈利。拖延工期,必然导致大量人力、物力、财力陷入未完工程中,长期不能发挥其经济效益,造成不应有的损失。中国第一个五年计划时期,基本建设工作组织得比较好, 156项骨干项目的建设工期,一般只用三四年时间。以后建设工期逐渐拖长,有的项目建设工期甚至拖长一倍以上。为了加快社会主义现代化建设,必须努力缩短建设工期。国家要求,除了少数工程量特大的项目以外,一般的项目建设工期要缩短到五年以内,大中型纺织厂、轻工厂、机械厂要在二三年内建成。国家责成各部门、各地区,根据本行业、本地区的具体情况,按平均先进水平,分门别类订出同类型、同规模建设项目的工期定额,作为确定具体建设项目工期的依据。大中型项目要按合理工期一次安排建设计划,分配投资和材料,落实建设条件和相关项目的同步建设,分年实施,以保证工程开工后能连续建设,按期建成,并形成综合生产能力,以提高投资效益。建立健全工期责任制,工程按期或提前投产,给予一定的奖励;由于工作上的原因拖长工期,给予经济惩罚。    就组成单项工程的某一个单位工程(如厂房建设或设备安装)的施工而言,则自该单位工程正式动工至完成的时间,在中国称之为施工工期。