1)shaft equipment井筒装备
1.The corrosion-proof design and practice of shaft equipment;井筒装备防腐设计与实践
2.Test technology and research of level force on Xulou vice-shaft equipment;许楼副井井筒装备水平力测试技术及研究
3.Application of die plate in shaft equipment installation of multi-purpose shaft;模具盘在混合井井筒装备安装中的应用
英文短句/例句
1.Technical code for anticorrosion of shaft equipment of vertical shaft of coal mine煤矿立井井筒装备防腐蚀技术规范
2.Discussion on Working Platform Arrangement Pattern in Vertical Shaft Construction立井井筒装备施工吊盘布置方式探讨
3.Analysis of Lower equip Construction for Installation of Pit Shaft equip井筒装备安装工程下部装备施工方法浅析
4.The Design and Installation of Suspended PlateDuring the Fixing of Shaft Equipment for Metal Mining Mixed Well and its Application金属矿混合井井筒装备安装中吊盘的设计安装及使用方法
5.Application of electric arc spray paint enduring antiseptic technique in the mine shaft equipments电弧喷涂长效防腐技术在煤矿井筒装备中的应用
6.Experience on the shrink shaft drilling construction reserve period缩短立井井筒凿井施工准备期的经验
7.at the top of the shaft there is usually a structure called a headframe. It contains some of the machinery necessary for mining operation.在井筒顶部通常都有一个叫作井架的建筑,其上装有一些采矿作业所需要的机械设备。
8.Development of the artificial buoyant seabed(ABS)浮筒式深水钻井装置(ABS)的研制
9.On the Configuration of Mechanized Construction Equipment of 1000 Meters Wellbore浅谈千米井筒机械化施工设备的配置
10.Standard for the equipment of ventilative safety of colliery矿井通风安全装备标准
11.Application of Frication Reel-cage Prevented Fall in Malan Mine Viceshaft摩擦卷筒式防坠罐装置在马兰矿副立井的应用
12.Development of Simulative and Experimental Facility for Heavy Oil Wellbore Based on Distributed Optic Fiber基于分布式光纤的稠油井筒模拟实验装置开发
13.Simple, Fast Deployment of Main Shaft Sheathed Cable to Monitor Construction Process简易、快速敷设主井筒铠装监测电缆施工工艺
14.3D visualization technique used for designing the installation of well centralizer应用井筒三维可视化技术设计油井扶正器安装位置
15.fabric slitting device织物剖幅装置(筒状针织物的剖幅设备)
16.Gangue Vertical Shaft Sinking Mechanization Equipment and Technology Application to Xintie Coal Mine新铁煤矿矸石立井凿井机械化装备与技术应用
17.Research on Technology and Equipment of PVA Hydrosols Drying and Forming Using the Drum Dryer;水溶胶滚筒法干燥固化成膜技术及装备研究
18.Code for the Construction and Equipment of Mobile Offshore Drilling Units移动式近海钻井装置建造和设备规范
相关短句/例句
main shaft equipment主井井筒装备
3)shaft equipment installation井筒装备安装
4)rigid shaft furniture刚性井筒装备
1.The characteristics of the rigid shaft furniture structure and the force acting on the rigid shaft furniture are introduced.介绍了刚性井筒装备结构的特性和作用在刚性井筒装备上荷载的特性。
5)shaft equipment井筒设备
6)refitting pit shaft井筒改装
延伸阅读
井筒钻进井筒钻进shaft drilling {Ingtong zuonj旧井筒钻进(shaft drilling)用竖井钻井法掘进时,利用钻井设备钻凿竖井井筒的作业。井筒钻进、洗井和支护是竖井钻井法掘进的三大工序,其中井筒钻进是主体工序。它包括钻井准备工作、钻凿、防偏和测斜、故障处理等,所用时间占总工期的80%一85%。 准备工作在此期间应完成的工作有:平整井场,保证水、电管线及道路和通讯的畅通,钻凿井筒的检查孔,建立工业和生活福利设施,检查并安装钻井设备,制备洗井泥浆,进行综合试运转等。准备工作所需时间取决于钻井工程的规模、设备大小、施工组织的合理程度。 钻凿主要工作有:下钻、起钻、接长钻杆和钻进。下钻包括下钻头、钻头就位、接钻杆、下放钻杆钻头、接风管和混合器、接主动钻杆等工作。起钻按下钻相反的顺序进行。当主动钻杆钻到最低位置时,需接一根钻杆(又称加尺),这时要停止钻进和停止泥浆循环,把主动钻杆提出转盘,并提出风管,接长一根钻杆,重新安上风管和主动钻杆,继续钻进,依此循环不已,直至钻完整个井筒。钻进时要根据地质条件正确选择合理钻进参数,注意观察转盘、钻具运转和排碴等情况。 防偏和测斜采用钻井法掘进井筒时,对井筒偏斜率有严格要求:当钻井深度小于30om时,允许偏斜率不得超过0.1%;钻深为300~4O0m时不得超过32omm,401一SOom时不得超过400mm,501~6oom时不得超过48Omm。因此在钻进过程中必须注意防止偏斜过大。井筒偏斜的原因很多,主要有钻井设备安装不当、钻压过大、冲击层中有卵石、工作面岩层软硬不均等。针对上述原因要采取相应的有效防偏措施,及时测量井筒偏斜率。当偏斜率超过允许值时,要及时纠偏。中国矿山常用的钻井测井仪有CJ一501型,CSX-731型和超声波式等。这类测井仪的测量范围是,井筒直径小于10m,井筒深度小于50om,测量精度为l%。测井仪所适应的泥浆,其粘度要小于25Pa·s,密度小于1·39/em3,温度在10一35℃。 故障处理钻井时常见的故障有泥包钻头,跳钻,卡钻,掉钻头、刀具和风管等,井筒片帮或坍塌。一旦出现这些故障,要采取相应的措施予以处理。 (何修仁)
