1)high-rise building高层建筑物
1.Lightning protective earthing and shielding of high-rise buildings;高层建筑物的防雷接地和屏蔽
2.Based on this,for example,the high-rise building,this paper introduces the deformation observation method of high-rise building and analyzes the deformation reasons;at last puts forward the concrete solution scheme.建筑物在建筑过程中可能会对其周围建筑物产生形变影响,基于此,以某高层住宅楼为例,介绍了高层建筑物变形观测的主要方法,并对其变形原因进行分析,最后提出了具体的解决方案。
3.This article analyzes the factors about subsidence of the high-rise building,including the reasons of building itself and the change of the natural condition,which discusses the reference point and observation point build and observation method and cycle in subsidence observation process.分析引起高层建筑物沉降的因素,包括建筑物本身相联系的原因和自然条件引起的变化,论述沉降观测过程中基准点、观测点的布设、观测方法及周期,以提高高层建筑物的沉降观测精度,从而确保建筑物的安全。
英文短句/例句
1.There is no lightning protector on this high building.这个高层建筑物上没有安避雷针。
2.Numerical Simulation of Wind Field Around Tall Buildings;高层建筑物绕流风场的数值模拟研究
3.Spread footings are also used-in greatly enlarged form-for high-rise Buildings.延伸的基脚也用在高层建筑物,形式加以放大。
4.Our field of vision is limited by that tall building.我们的视野受到了那座高层建筑物的限制。
5.Influence of High-rise Building Settlement on Nearby Metro Tunnel高层建筑物沉降对邻近地铁的影响分析
6.Extraction method of standing faces of high building based on perceptual organization基于感知编组的高层建筑物立面提取方法
7.Some Thoughts of Lighting Proof and Grounding of High Rise Buildings and Electronic Devices高层建筑物及电子设备防雷接地的几点思考
8.A Integrative Detection Method of the Areas Containing High Building Based on Correlative Coefficient基于相关系数的高层建筑物区域综合检测
9.On Use of GPS to Measure Ultra-high-rise Buildings Displacement Caused by Strong WindsGPS用于强风引起的超高层建筑物位移测量研究
10.Environment problems and relevant prevention and cure measures of foundation construction of high building高层建筑基础施工对相邻建筑物的影响
11.The building top layer is cut off decreases the altitude.建筑物的顶层将被拆去以减低高度。
12.The Sinking Survey of Construction of Meizhou Yinyu Mansion;高层(大型)建筑物施工的沉降观测
13.A multistoried building equipped with elevators.高层建筑带电梯的多层建筑
14.Simulation of Collapse Process of Blasting Demolition of Towering Building and Tall Building;高耸(高层)建筑物拆除爆破倒塌过程模拟
15.For buildings three or four storeys high, exterior bearing walls may be used, but above that height skeleton construction is usually adopted.外承重墙可以用于3至4层高的建筑物。但是,3、4层以上高度的建筑物通常采用骨架结构。
16.This building has a 3-floor atrium in the middle, at proper proportion and with sufficient sunshine.建筑物中有三层楼高的中庭,比例得当,日光充足。
17.Study on Civil Liability Caused by Unknown Tossed Object from High Buildings;高层建筑不明抛掷物致人损害的民事责任研究
18.Study on Civil Liability Caused by Tossed Object from High Buildings高层建筑抛掷物致人损害民事责任研究
相关短句/例句
high building高层建筑物
1.Analysis on dynamic behaviors of high buildings— pile foundation—soil system;高层建筑物—桩筏基础—地基相互作用体系动力特性分析
2.Extraction method of standing faces of high building based on perceptual organization基于感知编组的高层建筑物立面提取方法
3.The high building lightning protection has its complexity,this text advances the auditing importance of protection lighting is lightning protection of basic flat,side stroke thunder,equipotential bonding,power supply,computer network,fire fighting control system,reasonable comprehensive wiring,surface lightning protection etc.高层建筑物防雷具有其复杂性,本文提出防雷审核重点是基础平面防雷、侧击雷、等电位连接措施、供电、计算机网络及消防控制系统防雷、合理的综合布线、天面防雷等,掌握了防雷审核要素,能够快捷、高效无遗漏地审核高层建筑物防雷装置,找出防雷审核思路,提高工作效率。
3)tall building高层建筑物
1.This article discussed the tall building subsidence observation necessity,the subsidence observation rank and the precision determines,the standard basic point and the subsidence observation point establishes,subsidence observation method,subsidence observation cycle and frequency rate.对高层建筑物沉降观测的必要性、沉降观测等级及精度确定、水准基点和沉降观测点布设、沉降观测方法、沉降观测周期和频率等方面进行了讨论,介绍了沉降观测成果的处理、安全性分析及变形预报的方法。
2.The wind load is a major load on tall buildings from side directions.风荷载是高层建筑物的主要侧向控制荷载,准确地测量作用于建筑物上的静态和动态风荷载并预测建筑物的动态响应具有重要的工程意义。
4)skyscraper[英]['ska?skre?p?(r)][美]['ska?'skrep?]高层建筑物
1.Observation of skyscraper s settlement and it s data analysis;高层建筑物沉降观测及其数据分析
5)high rise building高层建筑物
1.The foundation of a high rise building in Nanjing is improved by using the technique of post grouting piles.介绍了后灌浆桩复合地基的加固机理及施工工序 ,利用后灌浆桩加固南京某高层建筑物的地基 ,达到了工期短、安全可靠和造价低的效果 。
6)building storey height建筑物层高
延伸阅读
采用可拆卸预应力锚杆技术进行高层建筑基坑护坡采用可拆卸预应力锚杆技术进行高层建筑基坑护坡 霹 采用可拆卸预应力锚杆技术进行高层建筑基坑护坡