1)Connection Survey联系测量
1.Application of Connection Survey Method in Track Traffic Projects;轨道交通工程联系测量方法的应用
2.Discussion on connection survey in underground civil defense engineering control survey;地下人防工程控制测量中联系测量方法的探讨
3.In this paper, the author completed the connection survey of a vertical shaft simply and precisely by the observation method of free oscillation.本文根据作者多年建井测量的实践经验,采用自由摆动观测方法,简单快捷、高精度地完成立井联系测量中的坐标传递工作。
英文短句/例句
1.Application of Total Station Gyroscope in Small Mine Tranverse Survey陀螺全站仪在小型矿井联系测量中的应用
2.Exploration and Practice on Mine Connection Survey of Anjialing No.1 Mine安家岭井工一矿矿井联系测量探索与实践
3.rate strapdown inertial measurement system速率捷联惯性测量系统
4.Every concept must eventually be related to measurement.每一个量最后都一定与测量联系起来。
5.The Method of Predicting Coal Output Based on Gray SPA基于灰色联系数的煤炭产量预测方法
6.Study on Speed-Measuring System of the Yield-Measuring Combine;测产型联合收割机行驶速度测量系统研究
7.Design and application of coordinate measuring machine line detection system三坐标测量机联机检测系统的设计与应用
8.The Operational System of Liaoning Artificial Precipitation Experimental Areal Rainfall Estimated by Using Radar and Rain-gauge and Parsivel雷达-雨量计-粒子激光探测仪联合估测降水量业务系统
9.Operational System of Liaoning Artificial Precipitation Experimental Areal Rainfall Estimated by Radar and Rain-gauge and Parsivel雷达-雨量计-粒子激光探测仪联合估测辽宁试验区降水量业务系统
10.Research on the Technology of Strapdown Attitude Measurement System Based on MEMS Sensors;基于MEMS器件的捷联姿态测量系统技术研究
11.A Forecast Based on Set Pair Analysis of Railway Freight Volume;基于联系度的铁路货运量集对分析聚类预测
12.The Investigation and Analysis for Partial Discharge Measuring System for the High Voltage XLPE Cable高压交联电缆局放测量系统状况调查与分析
13.Measurement Error Model of IMU in Strapdown Inertial Guidance System of Manpads Missile单兵导弹捷联惯导系统IMU测量误差模型
14.Design of test system for image motion measurement based on joint transform correlator联合变换相关器像移测量试验系统设计
15.Research on layered internet synthetic measurement management system分层的互联网综合测量管理系统的研究
16.Study on Further Discussion on Internal Relations of Classical Surveying Adjustment Models《再论经典测量平差模型间的内在联系》的研究
17.Research on optimization model of marine strapdown inertial measurement unit船用捷联惯性系统的IMU测量模型优化研究
18.Four-TDOA data association algorithm for multipassive-sensor system多被动传感器系统四时差量测数据关联算法
相关短句/例句
Contact triangle measurement三角形联系测量
3)underground connection survey井下联系测量
4)elevation survey高程联系测量
1.Shaft's elevation survey by means of total-station meter;全站仪用于竖井高程联系测量的探讨
2.Against to the limit of some traditional methods in vertical shaft elevation survey,based on which the total station technology was proposed.针对在竖井高程联系测量中一些传统方法的局限性,鉴于此提出了全站仪技术,就全站仪在立井导入高程测量中的应用以及影响测量结果的因素进行了论述,从而提高测量精度、保证测量效率。
5)shaft affiliation survey竖井联系测量
1.Taking the Gouwugongyuan-Xiangmihu segment of Shenzhen subway shield tunnel as an example, the method and the process step about setting up control net,measuring horizontal angle and chaining side as transferring control net’ coordinates and azimuth from ground to underground are introduced,and the factors influencing accuracy of shaft affiliation survey are analyzed.以深圳地铁购物公园-香蜜湖区间段盾构工程竖井联系测量为例,介绍了将地面控制网的坐标和方位角传至地下的控制网布设、水平角观测、边长量取的方法与步骤,分析了影响竖井联系测量定向精度的因素。
6)Computer system of measurement联机测量系统
延伸阅读
竖井联系测量 见矿山测量。