1)predicting coal seam washout zones冲刷带预测
2)scouring zone冲刷带
1.Introduced sedimentation analysis,mine geophysicalprospecting and geostatistical analysis three methods for coal seam scouring zone forecasting.介绍了沉积分析法、矿井物探法以及地质统计法三种煤层冲刷带预测方法。
英文短句/例句
1.The feature and forecast of 3~(-1) coal seam washout zones in Buertai Coal Mine布尔台矿井3~(-1)煤层冲刷带特征及预测
2.As the receding wave swept back with a hoarse roar,当退却的海浪带着刺耳的轰鸣向后冲刷而去的时候,
3.Erosion of a relatively soft surface, such as a roadbed, by a sudden gush of water, as from a downpour or floods.冲刷相对松软表面的冲刷,如路基被源于暴雨或洪水的水流冲刷
4.The sailors were washing down the decks.水兵们在冲刷甲板。
5.someone who cleanses by scouring.冲刷洗涤来清洁的人。
6.washed or swept with water especially waves of the sea.被水、特别是海浪所冲刷。
7.The waves bathed the sunny shores.波浪冲刷着阳光海岸。
8.The garden wall is is washed by the flood water.大水冲刷著花园的围墙。
9.The garden wall be be washed by the flood water大水冲刷著花园的围墙
10.They are busy clamping down the deck.他们正在忙着冲刷甲板。
11.The garden wall is being washed by the flood water.大水冲刷着花园的围墙.
12.The released flow from reservoirs carries less sediment load of bed material than pre? dam periods.建坝后水库下泄水流挟带的床沙质含沙量减少,坝下游河床出现冲刷。
13.Most navigable waterways require dredging because of siltation. This is true when navigation channels penetrate through the littoral zone.多数航道由于泥沙淤积都需要疏浚,冲刷沿岸地带的航道尤其是这样。
14.To be emptied or cleaned by a rapid flow of water, as a toilet.冲刷以快速的水流冲掉或冲净,如厕所冲水马桶
15.Tape Printing;Tape Perforating;Tape Printing/Perforating;Page Printing;Keyboard;Facsimile带式印刷;纸带穿孔;带式印刷/穿孔;页式印刷;键盘;传真
16.Where resistant channel materials prevail, erosion is limited solely to "plunge pools" immediately below the outlets.如果河床为抗冲物质,则冲刷仅限于紧靠出口下游的“冲刷坑”。
17.Self-Adhesive Printed Cellotape自粘印刷玻璃纸胶带
18.rubber tapped spilt brush带胶皮头分裂式电刷
相关短句/例句
scouring zone冲刷带
1.Introduced sedimentation analysis,mine geophysicalprospecting and geostatistical analysis three methods for coal seam scouring zone forecasting.介绍了沉积分析法、矿井物探法以及地质统计法三种煤层冲刷带预测方法。
3)go through scouring zone过冲刷带
4)scour survey冲刷测量
1.Influenced by many factors,decline of offshore platform often happens,which will bring hidden troubles to the operation,so the decline and scour survey becomes necessary.文中结合工程实例,介绍了几种使用常规、通用的测量仪器,并运用科学、经济的测量平差方法,解决了海上平台倾斜、冲刷测量的技术难题。
5)pre-brushing time预冲刷时间
1.On this basis, the article determines the time of pre-brushing of the semi-rigid base material,and puts forward that the unit time brushing rate in 7 minutes can be used as the index to evaluate the anti-brushing performance of the semi-rigid base material excluding the influence of pre-brushing time on the experimental result.该文利用冲刷试验仪进行了二灰碎石、水稳碎石等半刚性基层材料的室内抗冲刷试验,并在此基础上确定了半刚性基层材料的预冲刷时间,提出了在扣除预冲刷时间对试验结果的影响后,可利用7 min内的单位时间冲刷率,作为评价半刚性基层材料抗冲刷性能的指标。
6)washout zone in coal seam煤层冲刷带
1.Application study of geostatistics to predicate washout zone in coal seam;地质统计学在预测煤层冲刷带中的应用研究
延伸阅读
冲刷水流冲击引起河、渠及海岸、库岸等土石流失或剥蚀的现象。被冲刷的泥沙随水流运动,可能在其他地点淤积。