135MW机组,135 MW unit
1)135 MW unit135MW机组
1.The paper introduced the technological process of flue gas desulfurization system for 2×135 MW units in Sheyanggang Power Generation Co.介绍了江苏射阳港发电有限责任公司二期2台135MW机组烟气脱硫工艺流程,阐述了烟气系统、升压风机系统、吸收塔系统(包括SO2脱除效率、吸收塔液位、吸收塔浆液密度、除雾器的冲洗)、浆液制备系统、工艺水系统的控制策略。
2.After putting 2×135 MW units of Guodian Suqian Thermal Power Co Ltd into operation, the exhaust steam pressure and temperature from the high-pressure cylinder in operation of the said turbines is more far higher than the designed value.国电宿迁热电有限公司2×135MW机组投产后,汽轮机运行高压缸排汽(高排)压力和温度远高于设计值。
3.The 30% bypass system of home-made 135 MW unit in Taizhou Power Plant can t work properly for a long time, it is necessary to realize the integrated control by retrofitting on the bypass system, redesigning and integrating the bypass system control into DCS.台州发电厂135MW机组原设计的30%旁路系统长期无法正常使用,通过对旁路系统设备的技术改造和重新设计控制系统并整合在分散控制系统(DCS)中实现了一体化控制,不仅机组启停的自动化水平得到了很大提高,节约了投资,而且安全和经济性也取得了明显效益。
英文短句/例句

1.Study on the Coal Mill System with Intermediate Storage Bunker in 135 MW Generating Set;135MW机组中储式制粉系统优化研究
2.Research on Mixed-coal Combustion Test in Luoding 135MW Power Plant罗定电厂135MW机组混煤燃烧试验研究
3.Numerical Investigation on Wet Steam Inside the Tree-branch Shape Exhausted Duct of a 135MW Power Unit135MW机组枝状排汽管道系统内湿蒸汽的数值研究
4.Investigation into Diaphragm Bolthole Crack in LP Casing of a 135 MW Steam Turbine某135MW机组汽轮机低压缸隔板螺栓孔开裂故障分析
5.Feasibility Analysis of Ammonia Desulfurizing Method Applied to the Flue Gas Desulfurization System of Guangxi Tiandong 2×135MW Coal-fired Power Plant田东电厂2×135MW机组氨法烟气脱硫技改方案的可行性分析
6.Cause Analysis and Countermeasure Discussion on Demister Collapse Firing in 135 MW Unit's FGD System135MW机组脱硫系统除雾器坍塌失火的原因分析与对策探讨
7.The primary frequency regulation test on 135 MW circulating fluidized bed units135MW循环硫化床机组一次调频试验
8.Research of Energy Loss Analysis System for 135MW CFB Cogeneration Unit;135MW循环流化床供热机组能损分析系统的研究
9.SHAFTING VIBRATION ANALYSIS AND OPTIMIZATION FOR A 135 MW TURBOGENERATOR UNIT135MW汽轮发电机组轴系振动分析与优化处理
10.Software Design of the Turbine Model of 135MW Unit Simulator Exploitation;135MW火电机组培训仿真机开发—汽轮机部分模型软件设计
11.Design and Research on 135MW Air-Cooled Turbo-Generator Exciter;135MW空冷汽轮发电机励磁机设计与研究
12.The Optimization Research and Numerical Virbration Experiment on Ground of 135MW Steam Turbo-generator135MW汽轮发电机基础数模振动优化研究
13.Stator Insulation Structure of 135 MW Evaporative Cooling Turbo-generator by Marinating135MW全浸式蒸发冷却电机定子的绝缘结构
14.Reason Analysis and Preventive Countermeasures of Rotor Eccentricity Abnormal Increasing after 135MW Steam Turbine Shutdown135MW汽轮机停机后转子偏心异常增大的原因分析及防范措施
15.Analysis and Calculation of Structure Factor on Performance of 135 MW Turbine after Energy Saving Retrofit结构因素对135MW汽轮机通流部分改造后性能影响的分析与计算
16.The Model of Gas-Solid Flow Pattern for 135MW Circulating Fluidized Bed Boiler135MW循环流化床锅炉流动模型
17.Optimization on Anti-abrasion of Local Heating for 135 MW CFB Boiler135MW CFB锅炉局部受热面防磨优化方案
18.Central-station air handling unitsGB/T14294-1993组合式空调机组
相关短句/例句

MW air cooled unit135MW空冷机组
3)135 MW direct air cooling unit135MW直接空冷机组
4)MW PC boiler135MW机组煤粉锅炉
5)135 MW turbogenerator unit135MW汽轮发电机组
6)MW reaction steam turbine135MW反动式汽轮机
延伸阅读

135胶片135胶片135 film日本工业标准对35毫米胶片的称呼。有如135-36,135-20等,指一根胶卷摄取片格的数目。