1)adjustment test调整试验
1.The influence of burners on safety and economics of boilers are known after the combustion adjustment tests and burner tilting tests for 2 100 t/h boilers in Shajiao C Power Station,which is referable for guiding the safe and economic operation of boilers.对沙角C电厂2 100 t/h 锅炉进行燃烧调整试验和燃烧器的摆动试验后, 掌握了燃烧器对锅炉安全和经济性的影响, 这对指导锅炉安全经济运行有一定的参考价值。
2.The orthogonal experimental method was adopted during adjustment test,the main and secondary sequence effected on spicific output and coal fineness of coal pulverizing system were determined and the optimum operation mode of pulverizers on coal pulverizing system was forecasted.对其运行方式进行优化,在调整试验中采用正交试验法,确定出影响制粉系统单耗、煤粉细度各个因素的主次顺序,预测磨煤机制粉系统最佳运行方式,根据校核试验的结果,确定了制粉系统磨煤机的最佳运行方式为挡板开度60%,加载力偏置-2。
英文短句/例句
1.ORTHOGONAL TEST METHOD AND ITS APPLICATION IN COMBUSTION ADJUSTING TEST OF CFB BOILERS正交试验方法在CFB锅炉燃烧调整试验中的应用
2.Regulation Testing Research of Combustion on 500MW Boiler;500MW锅炉机组燃烧调整试验研究
3.Studies on reform of boiler burner and burning adjustment test;锅炉燃烧器改造及燃烧调整试验研究
4.Study on Combustion Adjustment of 600MW Supercritical Pressure Boiler600MW超临界机组锅炉燃烧调整试验研究
5.Combustion Adjustment and Optimization of a 1025t/h Boiler1025t/h锅炉燃烧调整试验及优化运行
6.DEH Valve Commissioning for SIEMENS 1 000 MW Steam Turbine西门子1000MW机组DEH汽门调整试验
7.Application of Orthogonal Experimental Method on Medium Speed Pulverizer Adjustment Test正交试验法在中速磨煤机制粉系统调整试验中的应用
8.The Mathematical Statistic Analysis of Experiments on Structural Parameters Selection of Combustion Chambers燃烧室结构参数调整试验的数理统计分析
9.Experimental Analysis on Combustion Adjustment and Optimal Operation of 220t/h Boiler;220t/h锅炉燃烧调整试验分析及优化运行
10.Coordinating Test for Combustion Optimization of Boiler No.1 in India Yamunanagar Power Plant印度雅慕那电厂1号锅炉的燃烧优化调整试验
11.RESEARCH AND APPLICATION OF TUNING TEST FOR OPTIMIZING CFB BOILER COMBUSTIONCFB锅炉燃烧优化调整试验方法研究与应用
12.Research of Optimized Operating Adjustment Experiment on Coal Pulverizing System with Ball Mills钢球磨煤制粉系统优化运行调整试验研究
13.Adjustment Test on a Gas Turbine Starter in Altitude Starting某型燃气涡轮起动机空中起动调整试验
14.Pulverized Coal Fineness Adjustment and Analysis of Double-inlet and Double-outlet Ball Mill双进双出钢球磨煤机煤粉细度调整试验及分析
15.bench adjustment机架调整,试验台上调整
16.motor-testing and regulating apparatus发动机试验和调整仪
17.Function test and adjust error for log on sea trial.航行试验中计程仪效用试验及误差调整。
18.Test of co-whole system整架调试(整机联试)
相关短句/例句
commissioning test调整试验
1.The main technical specifications,characteristics and commissioning tests before put into use of HG-1950/25.4-YM1型燃煤超临界锅炉主要技术规范、技术特点和试运前的调整试验。
3)test adjustment试验调整
4)regulation & test调整和试验
5)RB test adjustingRB试验调整
6)Adjustment test to achi eve optimization寻优调整试验
延伸阅读
静电除尘器调整试验静电除尘器调整试验commissioning test of electrostatic precipitator J一ngd一an ehuehenq一t一oozheng sh.yon静电除尘器调挂试验(eommissioning test。feleetrostatie preeipitator)对静电除尘器进行电气设备交接试验、空载升压试验、振打装置振打试脸、气流均布试验、试运行及除尘效率测定等,使其性能指标合格能正常投人运行所进行的工作。 电气设备交接试验主要有整流变压器及电抗器的绝缘试验;电力电垅直流耐压试验;瓷瓶、振打轴及瓷套筒等的绝缘耐压试验;二次回路通电操作试验;整流、触发回路的特性试验。 空载升压试验即极板间介质为空气时的升压试脸。目的是检查极板施工质量。先在每一电场的电极系统(放电极和收尘极)安装结束后进行,电压升至规定值不击穿为合格。当一台整流变压器容量不够时,可用两台并联加压,升压过程中若发生击穿,应检查处理,处理时要注意安全,应先将高压电源侧接地后始可进入极板区。各电场全部安装结束后需总体再进行一次空载升压试验。 振打装里振打试验内容除检查电气回路的联动情况、电动机转向、时间整定、振打一个周期的程序符合要求外,尚需到除尘器室内观察振打锤与撞击头的接触位工是否正确,若不合适应进行调整。振打试验时间不小于3h,振打后检查各部件的紧固螺栓有无松动。 气流均布试验即通过除尘器的气体流速分布试验。在最后一层分布板之后约500 mm处共设100~120个测点(纵行、横行测点间距离约lm)。测得数据按均方根值法进行计算,要求气流不均匀系数不大于。.2。若局部气体流速偏高或偏低,可将分布板上相应的孔径缩小或扩大加以解决。试验在锅炉空气动力场试验前后进行。 试运行试验项目有:①排灰装置投人试运行;②振打装t投人试运行;③锅炉点火前24h投人各电加热器加热瓷套,并检查各灰斗的蒸汽加热装置的工作情况;④侧定各电场的空载伏安特性,电压每升高2kV停留105测得相应的电流值,所得特性曲线作为日后运行检修的原始数据;⑤除尘器室通人烟气后再次记录各电压、电流值以测定各电场的负载特性,⑥调节火花频率数。 在试运过程中,当灰斗内集灰过多未及时排除时,将使除尘器放电电压值降低,甚至极间短路,电源开关跳闸,此时应及时清灰,排除故障。 除尘效率测定在锅炉移交生产后进行。(见除尘器性能试脸)