1)model acceptance test模型验收试验
1.Turbine model acceptance test of Baise multi_purpose dam project;百色水利枢纽水轮机模型验收试验
英文短句/例句
1.Code for model acceptance tests of hydraulic turbinesGB/T15613-1995水轮机模型验收试验规程
2.The Turbine Model Acceptance and Local Test of Longtoushi Hydropower Station龙头石电站水轮机模型验收试验与现场测试
3.Acceptance test on model for Kaplan turbine in Xixiayuan Project西霞院工程轴流转桨式水轮机模型验收试验
4.On Turbine Model Acceptance Test and Parameters of Feilaixia Hydropower Station飞来峡水电站水轮机模型验收试验与参数
5.Model acceptance test is applied to accept Yantan turbine performances. The model efficiency maximum is 92 percent in the completion of similar prototype.岩滩水电站水轮机性能采用模型验收试验方式验收.其全模拟模型最高效率达到92%。
6.Model Acceptance Test of the Baoying Pumping Station in the South-to-North Water Project南水北调东线一期工程宝应泵站水泵装置模型验收试验成果分析
7.This paper presents the turbine model acceptance test and the test results of Feilaixia hydropower station.简要介绍了飞来峡水电站水轮机的模型验收试验的情况及结果。
8.The parameter selection and model acceptance test of the Feilaixia Hydropower Station all have reached satisfied results.飞来峡水轮机的参数选择和模型验收试验都达到了满意的结果
9.Hydraulic Turbine Model Acceptance Test of No.2 Unit of Xinanjiang Hydropower Station新安江水电厂2#机增容改造水轮机模型验收试验
10.The runner model acceptance test of bulb tubular type turbine for Shapotou Hydropower Station沙坡头水电站灯泡贯流机组水轮机转轮模型验收试验
11.Main Parameter Selection of Unit & Model Acceptance Test on Turbine of Yantan hydropower Station岩滩水电站机组主要参数的选择及水轮机模型验收试验
12.Model Acceptance Test of the Pump Turbine of Hohhot Pumped Storage Power Station呼和浩特抽水蓄能电站水泵水轮机模型验收试验
13.acceptance test验收试验;验收试验;接机考验;接收测试;接收试验
14.Numerical Simulation and Experimental Research on Shrinkage of GF Reinforced PP;GF增强PP成型收缩率的试验研究与数值模拟
15.Study on Pull-out Test and Numerical Simulation of Newly Recoverable Anchor;新型可回收式锚杆抗拔试验及数值模拟研究
16.Shaking Table Test Model Design with Setback in Elevation for a Super High-Rise Building某立面收进超高层结构振动台模型试验设计
17.acceptance functional test验收功能试验;验收功能试验;验收性能试验;验收性能试验
18.The Acceptance Test of the Model Pump Systerm of Linjiaba Pumping Station in the Eastern Route First-stage Project of the South-to-North Water Transfer Project南水北调东线一期工程蔺家坝泵站水泵模型装置验收试验
相关短句/例句
model acceptance模型验收
1.Research on turbine model acceptance test;水轮机模型验收试验的研究与探讨
2.The author introduced the turbine model acceptance test for the efficiency, output, cavitation, pressure fluctuation, runaway, hydraulic axial thrust, hydraulic wicket gate torques and Winter-Kennedy differential pressure of the Francis turbines to be equipped at Baise multipurpose dam project.介绍百色水利枢纽混流式水轮机模型验收试验中效率、出力、空化、压力脉动、飞逸、轴向水推力、导叶水力矩和Winter -Kennedy蜗壳压差等试验的基本情况,并就试验中遇到的卡门涡、叶道涡、特殊压力脉动带等关键技术问题进行了详细的分析讨论,同时着重介绍了电站装置空化系数3种不同定义方式对压力脉动测试的影响,探讨了空化系数在原模型相似方面的影
3)model test模型试验
1.Hydraulic design and model test of a diffuser for wastewater discharge;污水排海工程的扩散器水力设计与模型试验研究
2.Model test for the water-soaked mass prediction ahead of tunnel face by geothermal measurement;岩体温度法隧道施工掌子面前方含水体预报模型试验研究
3.Method and equipment of model test for scouring resistance of riverbank with grass cover;植被护坡抗冲模型试验方法与装置研究
4)model experiment模型试验
1.Influence of water density on similarity in wave model experiments;波浪模型试验中水密度对相似性的影响
2.Study on a model experiment of two ships anchoring;码头双船系泊模型试验研究
3.Similarity Relation of Model Experiment about Thermal Environment of Tunnel Inside;隧道内热环境模型试验的相似关系
5)model tests模型试验
1.Development of multifunctional apparatus for model tests of foundations for overhead transmission line engineering;输电线路工程地基基础多功能模型试验系统研制
2.Introduction on Application of Similarity and Model Tests for Mechanical Design;浅谈相似理论与模型试验在机械设计中的应用
3.Research on the Similitude Theory of Dynamic Model Tests Based on Numerical Simulation;基于数值模拟的结构动力模型试验相似理论研究
6)modeling test模型试验
1.To solve the problems of harmful intake flow patterns affecting the pumping system characteristics and safe operation of pumping station,the author improved the intake flow patterns by adopting the method of modeling test with a 1∶50 model of Jingdu pumping station including the east sluice,west sluice and the diversion canals of 4 pumping stations.针对泵站进水流态不良,影响水泵装置性能的发挥及泵站的安全运行等问题,采用模型试验研究进水流态,建立模型比为1∶50的江都东闸至西闸间的整体进水河段及4座泵站引河的整体模型,改善了不良流态。
2.According to the modeling tests,the method to determine rel.利用地质力学模型试验方法,对上述两个问题进行了探讨,给出了确定开挖松弛区范围的方法,以及顺层岩质边坡的边坡走向与岩层走向夹角的上限值。
3.The artifical rainfall modeling test in lab and stability analysis of slope are made on the effect of erosion on slope of municipal solid waste in the situation with and without vegetation.利用室内模型试验手段,研究了在3种降雨强度作用下城市固体废弃物路堑边坡在无植被防护与有植被防护条件下坡面冲刷的变化规律,并应用侵蚀模数的概念来评价坡面的抗侵蚀能力。
延伸阅读
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条