水击压力,water hammer pressure
1)water hammer pressure水击压力
1.The theoretical study was made of the effect of shut-in procedure on the water hammer pressure pulse.关井水击压力的大小直接决定了现场是采用“软关井”还是“硬关井”方式关井。
2.In this paper, we analyse the water hammer pressures in the upstream conduit and downstream tunnel of the turbo - generator set and the stability of the turbine speed.对上、下游水击压力及水轮机转速的稳定性进行了分析。
3.However,the water hammer pressure produced upon well shut-in will possibly exert over-high pressure on BOP,and the weak points in the well are subject to being fractured.高含硫地质环境下钻井溢流发生时,及时关井非常重要,但关井产生的水击压力,可能使防喷器超压,而且易在井内最薄弱的环节发生压漏地层事故。
英文短句/例句

1.Analysis of Bellows Absorb Water Hammer in Rocket Propellant Conveyer Pipeline;火箭推进剂输送系统中波纹管对水击压力的吸收分析
2.incompressible water impact不可压缩撞水冲击力
3.The hydraulic force by which masculine will-power is defeated by feminine water-power.女性的水动力,赖以击败男性意志力的水压力。
4.Tears: The hydraulic force by which masculine will-power is defeated by feminine water-power.泪水:女性的动力赖以击败男性意志力的水压力。
5.Impact Study on Billet Descaling with High-Pressure Water Jet高压水打击力对钢坯除鳞效果的研究
6.The Calculating and Experiments of Surges in Surge Tank and Waterhammer Pressure in Pipe Systems;调压室水位波动及压力管道水击压强的计算和试验
7.The pressure on dams and levee s is very strong.大坝和堤防需要承受巨大的洪水冲击的压力。
8.Study on the Characteristics of Wave-making and Pressure in the Slamming of a Large Bridge Structure大型桥梁结构入水砰击中兴波及压力特性研究
9.The Calculation of Impact Compactor s Impact Power and Impact Energy;冲击压实机冲击力及冲击能量的计算
10.Studies on the Dynamic Response and the Perforation Failure of the Water-filled Pre-pressurized Pipeline Impacted Laterally by Missile;充水压力管道受弹体侧向冲击动力响应及穿透破坏研究
11.pressure balanced drilling bumpersub压力平衡式钻井震击器
12.Experimental Study for Dynamic Response of Foundation by Impact Rolling;冲击碾压荷载对旧水泥路面下路基的动力响应试验研究
13.Mechanism Research of the Maximum Horizontal Stress on Rockburst and Its Application最大水平应力对冲击矿压的作用机制及其应用研究
14.Mechanical characteristics of pavement base under impact compacted load冲击碾压改建水泥混凝土路面时基层的受力特性研究
15.hydrostatic extrusio静水压挤压;静水压挤压;静液力挤压;静液力挤压;液力静挤压
16.hydraulic engine水力(液压)发动机
17.A Study of Impact Piezoelectric Property of PVDF Stress GaugesPVDF压力传感器的冲击压电特性研究
18.pneumatic and hydraulic pressure regulator气动及水压压力调节器
相关短句/例句

surge pressure水击压力
1.The surge pressure of overflow well shut-in impacts whether well can be shut down and the choice of well shut-in modes.溢流关井的水击压力关系到能否关井,以及关井方式的选择。
3)water hammer水击压力
1.Calculation of water hammer of 2nd - phase water diversion project from Gangnan - Huangbizhuang reservoir to Shijiazhuang;石家庄市引岗黄二期工程管道水击压力数值计算
4)impact water pressure冲击水压力
5)impact pressure动水冲击压力
1.Influence of rectangular impinge jet s aspect ratio on impact pressure;三维冲击射流截面宽厚比对动水冲击压力的影响
6)impulse dynamic water pressure冲击动水压力
延伸阅读

锅炉、压力容器、压力管道及特种设备定期检验锅炉、压力容器、压力管道及特种设备定期检验periodic inspection of boilers, pressure vessels, pressure piping and special equipment  guolu YOli侧飞扣1 YOli gLJal对印ji tez陌叩劝以拍1 dingqi】,on四n锅炉、压力容器、压力管道及特种设备定期检验(peri诫c inspectionof城le。,p~切reves-Sels,p~二piPing ands衅过闪uiplr屺nt)为保证设备的安全使用,规定设备必须按一定周期进行法定的、强制性的检验。定期检验由政府设立的检验所、使用单位或行业检验站进行。检验单位及检验人员必须具有与所检设备相适应的资格。设备使用单位应该建立定期检验制度,做好检验计划,按时向检验单位提出申请。检验单位应该保证及时进行检验,检验按有关检验规则进行。检验时,设备使用单位应做好配合工作,提供必要的运行资料。检验完毕,检验单位要出具检验报告,对设备能否使用,要作出明确结论。如设备有缺陷,要提出是否修理、监护使用和报废的处理意见。锅炉压力容器安全监察机构根据检验机构的报告,发使用许可证书。有缺陷的,责令使用单位修理,修理后检验仍不符合安全要求的,则通知报废。使用单位逾期不进行定期检验,锅炉压力容器安全监察机构有权停止其设备运行。(陈亦惠)