1000MW超超临界,1 000 MW USC
1)1 000 MW USC1000MW超超临界
1.Selection and Arrangement of Main Hoisting Machinery for 1 000 MW USC Unit Turbine and Boiler Island Constructions;1000MW超超临界机组汽机与锅炉岛施工主吊机械选择与布置
英文短句/例句

1.The Research of Operating Characteristic for 1000MW Ultra-supercritical Units1000MW超超临界机组运行特性研究
2.Modeling and Simulation of 1000MW Ultra Supercritical Boiler Based on MATLAB基于MATLAB的1000MW超超临界锅炉建模与仿真
3.Hoisting and Installation of Top Girder in 1000 MW Super-critical Unit Boiler1000MW超超临界机组锅炉顶板梁吊装
4.Emergency Protection System of USC Steam Turbines1000MW超超临界机组保护系统简介
5.Design of Superheated Steam Temperature Control in 1000MW Super-supercritical Unit1000MW超超临界机组过热汽温控制设计
6.1000 MW USC Unit Bearing Bush Vibration Analysis and Remedy1000MW超超临界机组瓦振动分析及处理
7.Analysis on Configuration Mode without Motor-Driven Feed Pump for 1000MW Ultra-Supercritical Unit1000MW超超临界机组无电泵配置方式分析
8.Discussion on Main Building Layout of 1000MW Ultra Super Critical Unit1000MW超超临界机组主厂房布置格局探讨
9.Investigation on Selection of 1000 MW ESC Unit Ash Handling System1000MW超超临界机组除渣系统的选择
10.Design analysis of the Selection of the Four main pipelines of the 1000MW Ultra Supercritical Unit1000MW超超临界机组四大管道的选材
11.Comprehensive Optimization of 1 000 MW USC Steam Turbine and Its Effects1000MW超超临界汽轮机综合优化及成效
12.Design Optimization for 1000MW Ultra-supercritical Unit Control System1000MW超超临界机组控制系统设计优化
13.1000MW Ultra-supercritical Towered Boilers' Characteristic and Debug Technology1000MW超超临界塔式锅炉特点及调试技术
14.The Currently Main Technical Characters of 1000MW Ultra-supercritical Boiler当前1000MW超超临界锅炉的主要技术特点
15.The Research of 1000MW Ultra-supercritical HP Feedwater Heater1000MW超超临界高压加热器的研制
16.Technological Features and Experimental Researches for Dongfang's 1000 MW Ultra-supercritical Boiler东方1000MW超超临界锅炉技术特点及性能
17.Introduction of Steam Turbine Auxiliary System1000MW超超临界汽轮机组辅助系统介绍
18.Shaft Manufacturing of 1000 MW Ultra-supercritical Turbogenerator for Zouxian Phase IV Project1000MW超超临界汽轮发电机转轴加工工艺
相关短句/例句

1 000 MW ultra supercritical unit1000MW超超临界机组
1.Aiming at the start-up and operational characteristics of 1 000 MW ultra supercritical unit,this paper discusses capacity and function determination of motor-driven feed water pump from technology and economy point of view.针对1000MW超超临界机组的启动及运行特点,分别从技术、经济角度对电动给水泵的容量和功能选择进行了详细深入的论述,提出1000MW超超临界机组采用汽动给水泵作为运行泵,每台机组宜单独设置1台只具备启动功能的电动调速给水泵,容量满足机组启动要求的推荐方案。
3)1 000 MW extra supercritical unit1000MW超超临界机组
1.A technical and economical comparison was carried out for selection of turbine start-up mode and arrangement of its bypass system of 1 000 MW extra supercritical units in Zouxian Power Plant.通过分析、比较,确定邹县发电厂1000MW超超临界机组汽轮机采用带高压一级简化大旁路的高压缸启动方式。
4)1000MW ultra-supercritical boiler1000MW超超临界锅炉
1.Aiming at the problems occurring in coal pulverizing system of a 1000MW ultra-supercritical boiler, such as pulverized-coal deposition in primary-air tubes and more big particles inside pulverized-coal, detail analysis is made and further measures are put forward.针对1000MW超超临界锅炉制粉系统存在的一次风管积粉、煤粉中含有大颗粒的问题,进行详细分析研究,通过改进粗粉分离器结构、调整分离器挡板位置、提高一次风量、制粉系统热态调平等措施,解决了以上问题,大大提高了锅炉运行的安全性和经济性。
5)1000 MW USC unit1000MW超超临界机组
1.Calculation of a certain 1000 MW USC unit under TMCR condition shows that temperature rise at the last stage is as high as 51.对某1000MW超超临界机组TMCR工况计算发现,最末级温升高达51。
6)ultra-supercritical 1000 MW unit超超临界1000MW机组
延伸阅读

超超1.谓超然出尘。 2.高高在上貌。 3.犹绰绰。 4.见"超超玄箸"。