接卸,unloading
1)unloading[英]['?n'l?ud][美][?n'lod]接卸
1.The selection of wagon tipper in coal handling system in the second stage project of Dingzhou thermal power plant(2×660 MW)could not meet the unloading demand of K80 light hopper wagon which will be placed in service on the railway Shuohuang by Shenhua Group.定洲电厂二期(2×660 MW)扩建工程在输煤系统翻车机选型时,无法满足神华集团朔黄铁路即将投入运营的K 80底开门车的接卸要求。
2.The paper firstly introduces the lectotype of wagon tripper in coal handling system of the 2nd stage construction of Dingzhou Fossil Fuel Power Plant,and the common one-car wagon tripper can not meet the unloading demand of K80 type light hopper wagon.针对定洲电厂二期扩建工程在输煤系统翻车机选型时,无法满足K80底开门车接卸要求的问题,深入分析比较单、双线卸煤沟方案、新C型折返式双车翻车机方案,最终在二期工程中选择了新C型折返式双车翻车机方案。
3.The case of unloading high sulfur crude oil in a petrochemical company is given and hazards existed during unloading process of high sulfur crude oil are analyzed.通过某车间首次接卸高含硫原油的实例,分析了硫化氢在高含硫原油接卸过程中存在的危害,制定了有针对性的防范对策和专项安全作业措施,为安全快速地接卸高含硫原油提供了参考。
英文短句/例句

1.chain cable shackle联接卸扣锚链连接卸
2.articulated chute(浇混凝土用的) 活接卸
3.PD: by the way, where they are links of unloading??顺便说一句,他们在哪里是链接卸载?
4.Design for Dedusting System for Cassava Slice Handling and Its Equipment Selection木薯干接卸除尘系统设计及设备选型
5.unloading auger clutch lever卸粮螺旋离合器接合杆
6.RKE Receiver Remove/InstallRKE接收器拆卸/安装
7.Remove cylinder attaching bolts and remove cylinder from support plate.拆卸分泵附接螺栓并从支撑板上拆卸分泵。
8.Remove the cover plate of the relief valve by removing the four connecting screws.通过拆卸四个连接螺丝来拆卸安全阀盖板。
9.fuel unloading arm [aviation fuel receiving facility]卸油臂〔飞机燃料接收设施〕
10.fuel unloading berth [aviation fuel receiving facility]燃料卸载停泊处〔飞机燃料接收设施〕
11.removable direct access storage可装卸式直接存取存储器
12.Remove relay from connector before testing.在测试前,从接头拆卸继电器。
13.Detachable serrated nozzle, water flow control outlet attachable).可拆卸水嘴,可加接防溅起泡器。
14.Enumeration describing how an Add-in is unloaded.描述卸载外接程序的方式的枚举。
15.The environment calls this method when it unloads the add-in.环境在卸载外接程序时调用此方法。
16.Remove nut securing pedal shaft in support bracket.拆卸支撑托架上连接踏板轴的螺帽。
17.The next piece of code we will look at is the unload routine.我们接下来要看的代码段是卸载例程。
18.Design of the Hydraulic System for TL345J Articulated Dump TruckTL345J铰接式自卸车液压系统设计
相关短句/例句

crude received and sent原油接卸
3)rod breaker接卸钻杆
1.Based on the analysis of the current rod breakers of down hole drill, the structural program and hydraulic system of the fully hydraulic rod breaker are proposed.通过综合分析潜孔钻机接卸钻杆装置 ,提出了全液压接卸钻杆装置的结构方案及液压控制系统 ,研究了夹杆缸的结构及夹杆爪与夹杆缸的联接方式 ,研制了夹杆缸双行程及夹杆缸活套联接结构的夹杆器 ,分析了夹杆缸结构参数与工作参数的相互关系 。
4)unloading facility接卸设备
5)loading and unloading pump house接卸泵房
1.Practice of vane pump replacement on vacuum pump at loading and unloading pump house;滑片泵在接卸泵房中替代真空泵的实践
6)railway receiving and unloading operation铁路接卸
延伸阅读

星接阻抗和三角接阻抗的变换星接阻抗和三角接阻抗的变换transformation between starc-onnected and delta-connected impedances x ing]一e乙日kongl介e sonJ一00}Iez日伙ongde匕一。一〕huon星接阻抗和三角接阻抗的变换(t ransfor-mation betweenstar一eonneeted and delta-eonneeted imPedanees)接成星形的三个阻抗和接成三角形的三个阻抗互相替代的等效变换。它们之间的关系可用一组变换公式表示。按这组公式,用星接阻抗替换三角接阻抗或者反过来,不会影响稳态下电路其他部分的正弦电压和电流,常用于对称三相电路的分析和计算。 图1为三个阻抗21、Z:、23接成星形(又称丫形)。图2为三个阻抗Z小22。、Zal接成三角形(又称△形)。它们之间的变换公式如下:人23土图1星接阻抗图2三角接阻抗(1)将星形连接变换成三角形连接212一Z:+22+2 122及3一22+za十警(1)、|冬|矛231一23+21+2321(2)将三角形连接变换成星形连接z、-二一典乒兴-) 艺‘2士乙“3十乙31…_2 oqZI,}Z。一下万~一二-二二-汁 乙‘2士乙23十乙3‘1_Z。IZoq}艺q一二二一~二,二二--,-二二-~J 乙12十乙23十艺32夕(2) 当三个星接阻抗相等,即21一Z:一23一z丫、三个三角接阻抗相等即212一223一231一Z△时,变换公式是 Z二一32丫,Z丫一Z△/3