平班水电站,Pingban Hydropower Station
1)Pingban Hydropower Station平班水电站
1.On Sliding Form Operation Technology in Slope Project Construction in Pingban Hydropower Station;平班水电站护坡工程混凝土滑模施工措施
2.Construction Organization Design for Pingban Hydropower Station;平班水电站施工组织设计
3.Design Optimization for Hydraulic Structures at Pingban Hydropower Station;平班水电站水工建筑物设计优化
英文短句/例句

1.Put into Operation for Standards and Effect of Pingban Hydropower Station Project;平班水电站工程达标投产工作体会及成效
2.Major Measures and Achievements on Investment Control and Cost Reduction for Pingban Hydropower Station Project;平班水电站工程投资控制及降低工程造价的主要措施和成效
3.Optimization of concrete mix proportion for main work Contract B of Pingban Hydropower Station平班水电站主体工程B标混凝土配合比优化设计
4.Application Technology of Synthesis Automation Level Improvement in Nobody Stands Substation提高无人值班变电站综合自动化水平应用技术
5.Analysis of cracks on cement poles of Taipingwan hydropower station and its reinforcement太平湾电站变电站水泥杆裂缝分析及加固
6.The Applications of Water-prospecting by Electrical Method in Pingguo Substations电测深法在平果变电站找水中的应用
7.Optimization of Hydropower Tunnel Upper Flat Pipe Section Support for Hydropower Station水电站引水发电隧洞上平管段支护优化研究
8.Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area龙滩水电站坝址区平洞结垢量的估算
9.Experimental investigation of the side wall deformation in the PCP region of a utility boiler电站锅炉水平侧包墙变形的试验研究
10.Influence of Pushihe flood to tail water level of taipingwan hydropower station蒲石河洪水对太平湾水电站尾水位的影响
11.Study on the Water Seal Layout at the Bulb Tubular Powe Station灯泡贯流式水电站厂房水平止水布置研究
12.Unattended Substation and Substation Automation无人值班变电站与变电站自动化
13.Small Disturbance Stability Test on Single Unit of Pingban Hydropower Station平班水电厂单机小扰动稳定性试验研究
14.Influence of flood from Pushi river on flood discharge of Taipingwan hydropower station蒲石河洪水对太平湾水电站泄洪的影响
15.floating power barge水上动力站水上发电站
16.Study of Main Slope Erosion Dynamic Processes on Project Area of Banduo Hydropower Station of Yellow River黄河班多水电站工程区主要地类坡面侵蚀动力学过程试验研究
17.Experimental Study of Runoff Processes on Waste Grassland in Project Area of Banduo Hydropower Station of Yellow River黄河班多水电站工程区荒草地坡面产流过程试验研究
18.Research and Realization of Cross-Platform Hydropower Station Based on Web;基于web的跨平台水电站系统研究与实现
相关短句/例句

Pingban Hydropower Plant平班水电站
1.Optimization of normal concrete mix proportion for left-bank gravity dam of Pingban Hydropower Plant;平班水电站左岸重力坝常态混凝土配合比优化设计
2.Crest drop flaring pier + bucket basin joint energy dissipation is adopted for the surface spillway of Pingban Hydropower Plant.平班水电站溢流表孔的消能方式是在“Y型宽尾墩”的基础上,经过试验探索和模型验证,提出的适合于中等坝高、大单宽流量、下游水深浅等具体工程条件的新型消能工———“顶部跌流宽尾墩+戽式消力池”联合消能型式,工程实践证明,这种消能方式为缩短池长、改善流态及节省工程投资取得了明显的效果。
3)Banduo Hydropower Station班多水电站
1.Failure mechanism of No.1 toppling rock mass at left bank of Banduo Hydropower Station;班多水电站左岸Ⅰ号倾倒体破坏机制分析
4)Pingban Hydropower Station平班水电厂
1.Small Disturbance Stability Test on Single Unit of Pingban Hydropower Station平班水电厂单机小扰动稳定性试验研究
5)Banduo hydropower station of the Yellow River黄河班多水电站
1.Waste grassland is the main native ground type in the project of Banduo hydropower station of the Yellow River.荒草地是黄河班多水电站工程区最主要的原生地面类型,阐明其产流过程,可为揭示与评价该工程区水土流失过程与强度奠定重要基础。
6)Duping hydropower station都平水电站
延伸阅读

班多水电站

班多水电站

Pandoh Hydropower Station 概  述   班多水电工程(又称比阿斯-萨特莱杰连接工程)位于印度喜马偕尔邦、印度河支流比阿斯(Beas)河上。工程主要为了灌溉、防洪和发电等综合效益。粘土心墙堆石坝,最大坝高76m,坝顶长411m,体积145.5万m3。水库总库容0.41亿m3,面积1.65km2。   地面厂房位于萨特莱杰(Sutlej)河的右岸。长118m,宽38m,高49m,内设6台单机容量为16.5万kW的水轮发电机组,总装机容量99万kW,发电水头320m。   电站引水系统总长度33.7km,其中包括引水隧洞长25km,隧洞直径8m。   该工程于1965年开工,1977年建成。