1)grouting technology灌浆工艺
1.Chemical grouting technology for TGP s permanent shiplocks;三峡永久船闸化学灌浆工艺
2.The vacuum grouting technology used for construction of prestressed concrete bridges is presented.介绍预应力混凝土结构施工中的真空灌浆工艺施工工法,提出确保真空灌浆工艺顺利实施的控制要点。
英文短句/例句
1.TECHNOLOGY OF PRESSURE GROUTING UNDER PILE TIP AT COBBLE LAYER桩端压力灌浆工艺在卵石层灌注桩中的应用
2.The crack grouting diffusion radius is the basic gist of the grouting construction design and grouting craftwork control.灌浆扩散半径是进行灌浆结构设计和灌浆工艺流程控制的基本依据。
3.Curtain Grouting Technology of Special Dam Section in Taoyuan Hydro-junction of Tonghua通化桃园水利枢纽工程特殊坝段帷幕灌浆工艺技术
4.Application Study of Grouting Technology for Prestressed Duct Based on High Performance Material基于高性能材料的预应力孔道灌浆工艺应用研究
5.Study of high performance epoxy gap-filling and application process高强环氧灌浆料及其施工工艺的研究
6.The application of the post grouting technology of bored concrete pile in Taiyuan region灌注桩后压浆工艺在太原地区的应用
7.The Application of Extruded-expanded Mud-jacking Technique on the Bottom of the Filling Pile灌注桩桩底挤扩压浆处理工艺及应用
8.Comparison and Analysis of Methods and Effect of Curtain Grouting Rock Foundation of Existing Soil Dam既有土坝坝基帷幕灌浆施工工艺及灌浆效果的探讨
9.On construction craft of danger control and reinforcement curtain grouting project in some reservoir dam某水库大坝除险加固帷幕灌浆工程施工工艺
10.POST GROUTING PILES TECHNIQUE(2)--TECHINQUE OF PRESSURE GROUTING AT BASE OF SLURRY-DRILLED PILES后注浆桩技术(2)——泥浆护壁钻孔灌注桩桩端压力注浆工艺
11.Post pressure grouting of borehole cast-in-situ pile bottom and its quality control钻孔灌注桩孔底后压浆施工工艺及质量控制
12.Constructing Techniques and Experimental Study in Situ of the Cast-in-Situ Piles with Expanded-Base and Post-Pressure Grouting;扩底后注浆灌注桩施工工艺及其试验研究
13.Test and Application of Pipe Guiding Method of the Consolidation Grouting of Contact Section接触段固结灌浆引管法施工工艺试验及应用
14.Research on Construction Technique and Working Mechanism of Bored Pile by Base Post-Grouting;钻孔灌注桩桩桩端后压浆工艺与机理研究
15.Impact of Post Grouting Process of Pile Bottom on Bored Pile Bearing Behavior桩端后注浆工艺对钻孔灌注桩承载性状的影响
16.TECHNOLOGY OF POST-GROUTING PILES(3) --THE CONSTRUCTION TECHNIQUE OF GROUTING AT TIP OF AUGER-DRILLED PILES IN A DRY CONDITIONS后注浆桩技术(3)——干作业钻孔灌注桩桩端压力注浆工艺
17.Mechanism and Application of Post Grouting for Bored Pile in Slurry Wall浅析泥浆护壁钻孔灌注桩后注浆工艺的机理与应用
18.It is characteristics of poor groutability, difficult construction, rising cost and poor quality to grout under the condition of bearing pressure water.本文以挑园水库消力池集水井灌浆为例,对承压水条件下进行了灌浆施工工艺的试验研究。
相关短句/例句
grouting process灌浆工艺
1.A new grouting process is studied which adding small amount of surfactant and coupling agent into water to make a new water emulsion used for improving the underwater concrete surface and adopting fast setting modified vinyl ester resin slurry or epoxy furfuralacetone with underwater curing agent to prepare grouting material.研究一种新的灌浆工艺,在水中加入少量的表面活性剂与偶联剂制成可以用于改善水下混凝土表面的水乳液,采用可快速固化的改性乙烯基酯树脂浆材,或环氧糠叉丙酮与水下固化剂配制成灌浆材料。
3)chemical resin injection materials and process化学灌浆材料和工艺
4)grouting engineering灌浆工程
1.The requirements of flow instrument in grouting engineering and adaptation of electromagnetic flowmeter are concluded.归纳了灌浆工程对流量仪表的要求和电磁流量计的适应性;阐述了灌浆过程的主要工艺,如压水试验,灌浆等对流量仪表的要求;提示应用中需注意的事项,如操作工艺的影响,流量计测量管内附浆量的影响,介质中气泡的影响以及潮湿和高灰尘的环境引起的故障等。
2.The paper mainly focuses on how to apply partnering model to the quality management of grouting engineering.本文主要是围绕如何将Partnering模式引入到灌浆工程项目的质量管理过程中。
5)grouting construction灌浆施工
6)grouting project灌浆工程
1.Strengthening the management of grouting project to enhance the quality of grouting project;加强灌浆工程管理 提高灌浆工程质量
2.The author, from the construction need of Guan-Di hydropower station and the properties of the two pastes, thinks that the use of steady paste, mostly used in GIN, in grouting project can get a better effect than the ordinary one.在大坝灌浆工程中,浆液的选择非常重要,直接关系到受灌体的物理力学性能、施工工艺、施工工期等。
延伸阅读
采气工艺(见天然气开采工艺)采气工艺(见天然气开采工艺)gas production technology ,一‘J\匕乙吕天然气开采工艺pro以uetionteehnology)见