1)dam construction大坝施工
1.Visual simulation based upon GIS of dam construction;基于GIS和面向对象方法的大坝施工可视化仿真
2.Traditional dam construction simulation has some disadvantages, for example, most of them are not visual and hardly understood.针对传统大坝施工仿真中存在的问题,本文提出了一种基于GIS的大坝施工可视化仿真的方法,并以某拱坝施工仿真为例,进行了实例研究。
3.In order to meet the requirement of dam construction layout and transport,the upper structure is composed of track girders fo.为了满足大坝施工布置及运用要求 ,上部结构由门、塔机轨道梁、纵横联等组成 ,轨道梁为等直简支全焊钢箱梁 ;下部结构采取两种方案 ,即泄 13号坝段以左为钢桥墩 ,以右为混凝土桥墩。
英文短句/例句
1.Cause Analysis of Cracking in Dam Body during the Construction of Bailianya Dam白莲崖大坝施工期坝体裂缝成因分析
2.Application of Concrete Crushing-type Side Wall to Nanshan Reservoir Dam in Guangxi挤压边墙施工技术在水库大坝施工中的应用
3.Method of Real Time Supervisory Control Filling and Rolling Quality Construction in the Dam by GPSGPS大坝施工碾压质量实时监控方法
4.Measures of Quality Control Adopted at the Dam Construction of Yangshan First Cascade Hydropower Station仰山一级站大坝施工质量管理与监督措施
5.Dynamic Three-Dimension Visual Simulation for Xiangjiaba Hydroplant Dam Concrete Construction;向家坝水电站大坝施工动态三维可视化仿真研究
6.Variable economical factors in construction of Jiangya dam;江垭大坝工程施工中变化的经济要素
7.Monitoring and Analysis of Cut-off Wall of Yanshan Reservoir in Construction Period燕山水库大坝防渗墙施工期监测分析
8.Construction technology of RCC dam for Yeya hydropower project in Burma缅甸耶涯水电站RCC大坝主要施工技术
9.On construction craft of danger control and reinforcement curtain grouting project in some reservoir dam某水库大坝除险加固帷幕灌浆工程施工工艺
10.Concrete construction management in reconstruction of energy dissipation structures of Hongshi dam红石大坝泄洪消能工改造工程混凝土施工管理
11.Control of explosion in reconstruction of energy dissipation structures of Hongshi dam红石大坝泄洪消能工改造工程爆破施工控制
12.Cracks Treatment Construction Technology of the Danjiangkou Dam Heightening Project丹江口大坝加高初期工程裂缝处理施工工艺
13.Studies on Embankment Matials Test and Compacting Test of Shui Niujia Power-station Embankment Dam Project;水牛家水电站大坝工程施工期筑坝材料试验及碾压试验研究
14.The Design and Construction of Seepage-proof Reinforcement of West Vice-dam of Dazhan Reservoir;大站水库西副坝防渗加固工程设计与施工
15.Disscussion on Construction Progress Control and Management for Yanshan Reservoir Dam Project浅议燕山水库大坝工程施工进度控制与管理
16.Safety Management of the Construction and the Hydro Project Operation in the Danjiangkou Dam Heightening丹江口大坝加高工程施工与枢纽运行安全管理
17.Concrete Construction Technology at the Left Bank of the Danjiangkou Dam Heightening Project丹江口大坝加高左岸工程混凝土施工技术综述
18.Analysis on Dam Monitoring Results of Three Gorges Project三峡工程大坝混凝土施工及监测成果分析
相关短句/例句
dam concrete construction大坝混凝土施工
1.This paper introduces the technology measures,control methods and control effictiveness for dam concrete construction temperature control combined the project practice.锦潭水电站是广东省有史以来建设的第一高拱坝,工程地处华南地台内部,粤北山字型构造前弧,夏季炎热,昼夜温差较大,地质条件复杂,混凝土施工温度控制难度较大,本文结合了工程实际情况详细介绍了锦潭水电站大坝混凝土施工温度控制的技术措施、控制措施和控制效果。
3)dam slope construction坝坡施工
4)arch dam construction拱坝施工
1.After testing the algorithm,the result obtatined is correct and can meet the engineering requirement,and can be used in the process of arch dam construction to bring along hydroelectric engineering production automatization and produce the tremendous economic efficiency.所述算法建立在对拱坝进行了有限元网格剖分与计算已获得施工数据的基础上 ,提出了对将建拱坝工程量预算较为合理的计算方法 ,并用 C语言编程实现 ,经测试验证后 ,结果正确 ,符合工程要求 ,可将其应用于拱坝施工全过程 ,势必带动水电工程生产自动化 ,产生巨大经济效
5)dam design and constructicn大坝的设计与施工
6)high arch dam construction高拱坝施工
1.To fit the complexity and particularity of different hydropower projects,methodology of object-oriented simulation was introduced to dynamic simulation for high arch dam construction processes.为了建立通用的高拱坝施工仿真模型,以适应不同水电工程的复杂性与特殊性,在高拱坝施工全过程动态仿真中引入面向对象的仿真方法。
延伸阅读
施工企业技术组织措施计划(见施工企业技术)施工企业技术组织措施计划(见施工企业技术)technical and organize measurement plan in construction enterprise 施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。