1)siltation回淤
1.Study of siltation for development of deep water navigtion channel of Lingdingyang in Pearl river estuary;珠江口伶仃洋深水航道开发方案的回淤研究
2.Analysis of reasons for the siltation in North Passage of Yangtze Estuary长江口北槽航道回淤原因分析
3.Based on the understanding of the mechanism of sediment transport and channel siltation,the regulation schemes for the outer channel of Huanghua Port are evaluated,and the rationality of the regulation scheme already carried out is discussed.在总结黄骅港海域泥沙运动规律和航道回淤机理的基础上,对黄骅港外航道各种整治工程方案进行评价,论证了已经实施的整治工程方案的合理性。
英文短句/例句
1.Survey and study on characteristic of sediment in the constructing channel of muddy coast淤泥质海岸航道建设期泥沙回淤特征监测研究
2.Change of re-siltation in the Yangtze Estuary deepwater channel during 1~(st) and 2~(nd) stages长江口深水航道(一、二期工程)回淤变化
3.Study on Exertion of Semi-empirical Formula for Out Channel Resedimentation on Lianyungang Coast;连云港海域外航道回淤半经验公式运用研究
4.Study on Morphological Evolution and Siltation in Deep Waterway Due to Channel Re-construction in the North Passage, Yangtze Estuary;长江口深水航道河床演变与航道回淤研究
5.Study on Near Bottom Dynamics and Sediment Processes in Turbidity Maximum基于底边界层研究的航道回淤机制分析
6.Hydrological sediment condition and sedimentation analysis of Nansha Port, Guangzhou广州港南沙港区水文泥沙条件及回淤分析
7.Sediment siltation at Waigaoqiao Phase VI harbor basin of the Yangtze Estuary长江口外高桥六期码头港池泥沙回淤分析
8.Calculation results show that the recirculating region and back silting of Plan 2 are smaller than those of Plan 1.计算结果表明,方案2的回流范围和泥沙回淤强度均小于方案1。
9.Establishing an Sea-route Safety Forecast Model by Using the ANN in Analysing the Sullage in the Sea-route;港口航道回淤分析中人工神经网络预测模型的建立
10.Research on approach channel dimension of Tianjin central fishing port and sediment siltation天津中心渔港进港航道尺度论证与航道泥沙回淤研究
11.Bed Load Agradation in Reservoir and Depostion in Variable Backwater Region水库推移质淤积、变动回水区淤积及回水抬高
12.Experimental study on sediment deposition in circulation zone of shallow water flows明渠浅水回流区泥沙淤积的试验研究
13.Application of Nonparametric Projection Pursuit Regression in Prediction of Dam Land Sedimentation of Warping Dam非参数投影寻踪回归在淤地坝坝地淤积预测中的应用
14.Based on the theoretical derivation and the experimental verification, a formula to calculate the sediment deposition rate in the closed Chanel is also derived.本文还探讨了回流淤积的计算,推导出回流淤积率无量纲函数关系式。
15.Characteristic of Circumfluence in Dredged Harbor Basins and Its Influence on Siltation;挖入式港池回流特性及其对淤积的影响研究
16.The Sediment accumulation Situation of the Variety Back-water Zone In Shanxia Dam;三峡水库变动回水区泥沙淤积状况及治理
17.Changes of sediment deposition and erosion at Chongqing reach in backwater area of Three Gorges Project after reservoir adjusting of the upstream in the Yangtze River水沙调节后三峡工程变动回水区泥沙冲淤变化
18.Experimental Study of Control Method of Horizontal Circulation and Sedimentation Behind a Spur Dike;丁坝回流尺度控制方法和减少回流淤积的实验研究
相关短句/例句
back silting回淤
1.Analysis of back silting of excavated harbor basin and navigation channel in silt beach of cangnan;浙江苍南淤泥质潮滩开挖港池和航道的回淤分析
2.Based on the back silting analyses of the sandbar-dotted waterway in the Oujiang River estuary after three times dredging,reasons for back silting in the waterway are presented considering influences of flow dynamics,waves and salinity distribution on sediment concentration.通过对瓯江口拦门沙航道3次疏浚后的回淤分析,以及从瓯江口的水流动力条件、风浪、盐度分布对含沙量影响等的初步分析,得出了拦门沙航道回淤的原因。
3.If there exists shelter embankment at the water intake area of a power plant, the back silting at the place of intake and intake canal etc.电厂取水口建掩护堤后,取水口、取水渠等处的回淤必须在电厂建设之前予以解决。
3)amount of siltation回淤量
1.Prediction of the amount of siltation in the seaward deepwater channel for various excavated projects is performed by using the mathematic model.根据实测资料分析了广州港出海航道泥沙冲淤时空变化以及伶仃航道的回淤原因,运用数学模型对伶仃航道不同开挖尺度方案回淤量进行预测。
4)alluvium thickness回淤厚度
5)foundation ditch back silting基槽回淤
6)back silting intensity回淤强度
1.On the basis of sediment concentration field,the annual back silting intensity on the approach channel of 70 000 DWT at Lianyungang Harbor was also simulated,and the calculated results was coincident with actual data.鉴于进港航道回淤量是当地海域潮流、波浪、泥沙长期共同作用的结果,建议采用年平均含沙量场进行回淤计算,并在此基础上模拟了连云港7万吨级进港航道的年回淤强度,计算结果与实测资料吻合较好。
延伸阅读
三一回五一回1.犹言三番五次。