施工优化,Construction optimization
1)Construction optimization施工优化
英文短句/例句

1.Research on the Design and Optimization of Deepwater Caisson Quay-walls;大型深水沉箱码头设计施工优化研究
2.Design And Construction Optimization of Deep Foundation Pit Support of a Budilding某大厦深基坑支护的设计与施工优化
3.Construction optimizing and stability analyzing for large tunnel anchor大型隧道锚施工优化及其稳定性分析
4.Optimize Construction Controlling Progress, Strengthen Construction Safety Management;优化施工控制流程 强化施工安全管理
5.Optimization Studies on Construction s Total Contract Pattern of Civil Engineering and Architecture;建筑工程施工总承包模式的优化研究
6.Summarization of Design Optimization during the Construction Stage of Xiaowan Hydropower Project小湾水电工程施工阶段设计优化管理
7.Public Works Construction Projects to Optimize the Construction Technology Program市政工程建设项目施工技术方案优化
8.STUDY ON CONSTRUCTION TECHNIQUES OF A NOVEL BAMBOO-STEEL COMPOSITE ROCK-BOLT南竹加筋复合锚杆施工工艺优化研究
9.Discussion on Optimization of Reconstruction Plan for K440 Substation in Huaihua Railway Terminals浅谈怀化枢纽K440所改造施工方案优化
10.Optimum Research on Bracing Design and Construction Schemes for Deep Foundation Pits;深基坑支护设计与施工方案优化研究
11.Research on Simulation and Optimization to TBM Construction Processes for Long Complex Tunnels;复杂长隧洞TBM施工过程仿真优化研究
12.Optimal Design on Gongboxia Hydro-Power Station Construction During Flood Perind;公伯峡水电站施工度汛方案优化设计
13.Dezhou IP Network Improvenment Project Implementation Plan;德州IP城域网二期优化工程实施方案
14.An Optimization Study of Logistics Operation Mode on Railroad Construction Project;铁路施工项目物流运作模式优化研究
15.The Optimization Study of Construction Diversion Buildings in Xiaowan Power Station;小湾水电站施工导流建筑物优化研究
16.Optimization of Thailand 750m~3 Blast Furnace the Equipments Installation & Construction;泰国750m~3高炉设备安装与施工的优化
17.Optimization of Cable Tension during the Construction for Cable-stayed Bridges;斜拉桥施工阶段索力确定的优化方法
18.Optimizing the Construction Project Management and Strengthening the Construction Cost Control;优化施工项目管理 加强项目成本控制
相关短句/例句

optimized construction优化施工
1.The paper introduces the optimized construction of 40m precast prestressed reinforced concrete box beam of Jialuhe Bridge of south-west highway of zhengzhou city.介绍河南郑州西南绕城高速公路No3合同段中贾鲁河大桥40m预制预应力钢筋砼箱梁——先简支后连续的优化施工,叙述了通过现浇中横梁及湿接缝把相邻跨的预制梁块连接成连续梁,再进行体系转换实现先简支后连续梁桥的做法,对简支梁与连续梁桥的特点进行了分析对比。
3)optimization of construction technology施工工艺优化
4)optimized construction procedure优化施工工序
5)Optimization of construction time施工工期优化
6)optimizing cable force施工索力优化
延伸阅读

施工综合进度优化施工综合进度优化optimization for overall schedule of construction shlgong Zonghe jlndU youhuo施工综合进度优化(optimization for overallschedule of eonstruetion)对施工中的相关因素进行多方案比较和优选,找出最佳的进度方案并予以实施的工作。最佳的进度方案应是工期、资源利用、工程造价等方面综合考虑最优的方案。优化的方法包括工期优化法、资源优化法、成本优化法等. 工期优化法在合理利用人力、物力、财力、资源的前提下,尽量缩短关键路径所需的时间。可以采取提高机械化程度等先进施工方法,以及采用近饱和密度的施工组织措施等.近饱和密度的施工,是按流水施工的原理确定工艺参数、空间参数和时间参数,使多工种、多工序相互穿插,紧密衔接,充分利用施工场地,尽量减少施工中的停歇时间,以加快施工进度。 资源优化法在力求减少资源投人的条件下满足工期要求。有两种优化方法:①资源已定,力求工期最短;②工期已定,力求资源投人最少。 成本优化法寻找工程总成本(或工程总造价)最低的最短工期。具体方法是:将工程的直接费(随工期压缩所需增加的机械购置和使用费用、材料费用、临建费等)与工期延长所需增大的间接费进行比较,并计算工程提前投产后的发电效益等诸多因素。优化的结果,使工程成本最低,工期最短。