1)Gelantan Hydropower Station戈兰滩水电站
1.The Comprehensive Improvement of the High Slope for the Diversion Tunnel of Gelantan Hydropower Station;戈兰滩水电站导流洞高边坡综合治理
2.The Analyze of Water Level-Discharge Relation of Gelantan Hydropower Station;戈兰滩水电站水位流量关系分析
3.Design on Dam Crest Gantry Crane and Access Bridge of Gelantan Hydropower Station戈兰滩水电站坝顶门机及交通桥设计
英文短句/例句
1.Design on Dam Crest Gantry Crane and Access Bridge of Gelantan Hydropower Station戈兰滩水电站坝顶门机及交通桥设计
2.Full Supply Level Demonstration Process and Considerations of Gelantan Hydropower Station戈兰滩水电站正常蓄水位论证过程与体会
3.Review and Rethinking of the 2006 October Flood Suffered by Gelantan Hydropower Station戈兰滩水电站2006年10月洪水回顾与反思
4.Investigation and Design Process and Features of Gelantan Hydropower Station戈兰滩水电站工程勘测设计过程及特点
5.Ertan hydropower station is the first power station built on Yalong River.二滩水电站是雅砻江梯级开发的第一个水电站。
6.Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area龙滩水电站坝址区平洞结垢量的估算
7.SEISMIC HAZARD ANALYSIS OF THE ERTAN DAM SITE二滩水电站坝区场地地震危险性分析
8.Appraisal on Supervision Work of Arch Dam Works of Ertan Hydropower Project;二滩水电站拱坝工程监理工作后评估
9.Financing for the Longtan Hydropower Project and its funds management;龙滩水电站工程融资和资金使用管理
10.Optimization of Protection Configuration for 10kV Station Transformers of Longtan Hydropower Station龙滩水电站10kV厂用变保护的优化配置
11.Technical Innovation for Mechanical Hydraulic Drive System of Letan Governor乐滩水电站调速器机械液压系统改造
12.Joints Grouting Construction Technology of Arch Dam in Goupitan Hydropower Station构皮滩水电站拱坝接缝灌浆施工技术
13.Overview on Bulb Tubular Turbine Generator Design for Jinjitan Hydropower Station金鸡滩水电站灯泡贯流式水轮发电机设计综述
14.Summarization on the design of 6.3/0.4kV drainage transformer substation on plunge-pool at Ertan Hydropower Station二滩水电站水垫塘6.3/0.4kV排水工程设计综述
15.Chemical Grouting Treatment to Leakage in Transverse Joints inside Dam Body of Lingjintan Hydropower Station凌津滩水电站坝体横缝漏水化学灌浆处理
16.The Water Turbine Stability Problem Study for Wujiang Goupitan Hydropower Station;乌江构皮滩水电站水轮机稳定性问题研究
17.Discussion on Favoring the People of Relocation by Aquatic Breeding in Luodian Reservoir of Longtan Hydropower Station;龙滩水电站罗甸库区水产养殖反哺移民的探讨
18.Experimental research on overflow cofferdam of Tankeng Hydropower Station in Zhejiang Province浙江滩坑水电站过水围堰模型试验研究
相关短句/例句
Gelantan reservoir戈兰滩水库
1.Based on the characteristics of Gelantan reservoir, one dimension vertical temperature model is adopted to predict water temperature distribution of the reservoir.针对戈兰滩水库水文分层特性,采用一维垂向水库水温数学模型进行该水库的水温分布-预测。
3)Gelantan戈兰滩
1.The Emulational Analyse of Gelantan Roller ComPacted Concrete (RCC) Dam;戈兰滩碾压混凝土重力坝仿真分析
4)Longtan Hydropower Station龙滩水电站
1.Practice and Experience of Environment Protection and Water-soil Conservation Supervision for Longtan Hydropower Station;龙滩水电站环保水保综合监理的实践与体会
2.Waste Water Disposal for Macun Aggregate Production System of Longtan Hydropower Station;龙滩水电站麻村砂石加工系统废水处理
3.Engineering characteristics of defective geological bodies at right-bank dam abutment of Longtan Hydropower Station and analysis of their causes;龙滩水电站右岸坝肩边坡不良地质体特征及成因分析
5)Ertan Hydroelectric Station二滩水电站
1.The authors expounds the present status of natural environments and social environments in Ertan Hydroelectric Station and the reservoir area.论述了二滩水电站及其库区自然环境和社会环境的现状。
6)Yantan Hydropower Station岩滩水电站
1.Stability Analysis of Surrounding Rock of Underground House Group in Yantan Hydropower Station;岩滩水电站地下厂房洞室群围岩稳定性分析
2.Operation of RCC dam in Yantan Hydropower Station;岩滩水电站碾压混凝土坝的运行
3.Study on water log caused by karst immersion surrounding Yantan Hydropower Station;岩滩水电站水库岩溶浸没性内涝的研究
延伸阅读
兰戈人兰戈人Lango东非乌干达民族。又称阿米罗人、兰吉人。主要分布在基奥加湖以北地区。属尼格罗人种苏丹类型,系尼罗特人中南部卢奥人的一支。在语言文化上,与阿乔利人相近。使用兰戈语,属尼罗-撒哈拉语系沙里-尼罗语族。信仰自然崇拜和祖先崇拜。在社会结构上存在年龄结群制度。婚姻实行一夫多妻制。男女均行成年仪式,并有摘除下门牙的习俗。按父系续谱、居住和继承财产。从事农牧混合经济,以农为主,种植粟、高粱、芝麻、荞麦、豆类和花生;饲养山羊、绵羊及短角牛,兼事狩猎。