大化水电站,Dahua hydropower station
1)Dahua hydropower station大化水电站
1.Summary on dam safety operation management for Dahua Hydropower Station;大化水电站大坝安全运行管理综述
2.Review on Hydraulic Characteristic Curve of Dahua Hydropower Station大化水电站水务特性曲线复核
3.Temperature monitoring system on overflow sections in Dahua hydropower station is introduced,along with analysis on long monitoring data,from which the law of temperature distribution and its change in solid dam section,hollow dam section and piers are presented.本文介绍了大化水电站溢流坝温度监测系统,并对长期监测资料进行了分析,找出了空腹坝段、实体坝段及闸墩温度分布规律及变化规律,通过与设计计算温度场对比,找出了引起两者差异的原因。
英文短句/例句

1.Design of Drop-tilting Gates at Dahua Hydropower Station and the Layout of Hoist大化水电站船闸卧倒闸门设计及启闭机布置
2.Left high bank slope stability analysis and treatment for Dahua Hydropower Station Expansion Project大化水电站扩建左岸高边坡稳定分析及处理
3.producibility of hydro electric power station水力发电站最大发电量
4.Optimal Analysis on Preloading Filling Scroll Case Structure of Large Hydropower Stations;大型水电站充水预压蜗壳结构优化分析研究
5.Chemical Grouting of Concrete Cracks for Strengthening of Dam in Construction of Daxia Hydropower Station大峡水电站坝体混凝土裂缝补强化学灌浆
6.An quantitive assessment on regional crustal stability of the Jinchuan hydropower station region on the Dadu river大渡河金川水电站区域地壳稳定性定量化评价
7.Study on Optimization of the Large-Scale Coal-fired Station Circulating Water System Operating大型燃煤电站循环水系统运行优化研究
8.Optimum and Comparative Design for Pipe's Material and Diameter in Daheyan Seventh Hydropower Station大河沿河七级水电站管材、管径优化比选设计
9.Introduction of automatic dam safety monitoring system at Yunfeng hydropower station云峰水电站大坝安全监测自动化系统简介
10.Digital Hydraulic Power Station Based on IEC61850;基于IEC61850的数字化水电站
11.The Application of the Hydrogeochemistry on the Research of Ground Water System at the Dam Area of Da Gangshan Hydropower Station;水文地球化学在大岗山水电站坝区地下水系研究中的应用
12.Enhancing the safety level of hydropower dams by summarizing experiences and strengthening management总结经验 强化管理 努力提高我国水电站大坝安全水平
13.An improved discriminant criterion method (IDCM) derived form the discriminant criterion method is presented to solve long-term optimal scheduling operation problem of large-scale mixed hydropower systems.采用改进判别式法求解大规模混联水电站库群发电优化调度问题。
14.A STUDY ON THE SHORT-TERM OPTIMAL SCHEDULING FOR THE ENERGY MAXIMIZATION OF FUJIAN HYDROPOWER SYSTEMS;福建水电站群短期发电量最大优化调度模型与算法研究
15.Application of Chemical Grouting in Treatment for Concrete Dam Cracks of Dahua Hydropower Station化学灌浆技术在大花水电站大坝混凝土裂缝处理中的应用
16.Substation automation system and communication mode of Xiafu Hydraulic Complex下福水电站变电站自动化控制及通信方式
17.Specification of reservoir operation for large and medium-scale hydropower stationsGB17621-1998大中型水电站水库调度规范
18.Construction Technique for Large Diameter Discharging Tunnel in the Luoxidu Hydropower Plant溪洛渡水电站大孔径排水孔施工技术
相关短句/例句

expansion project of Dahua Hydropower Station大化电站扩建工程水
3)Dahua Hydropower Station大华水电站
1.Evaluation on stability analysis of penstock of Dahua Hydropower Station;大华水电站钢管道稳定分析评价
4)Dapu Hydropower Station大埔水电站
5)hydropower dam水电站大坝
1.At present, major problems commonly exist in safety monitoring for hydropower dams.目前水电站大坝安全监测工作中 ,存在着观测设施陈旧 ,自动化程度不高 ,观测资料分析深度、广度缺乏全面性和系统性 ,设计市场混乱 ,施工单位在首次蓄水期间未能及时建立监测设施 ,运行管理单位监测队伍不稳定等现象。
6)hydropower dams水电站大坝
1.The feedback analysis on the accidents of hydropower dams shows that most of the accidents are related to the faults in design, the hidden perils from construction and the errors in operation management.对水电站大坝事故的反馈分析表明 ,大多数事故与设计阶段的失误、施工过程遗留下的隐患、运行管理中的差错等因素有关 。
延伸阅读

大化水电站

大化水电站

Dahua Hydropower Station 概  述   大化水电站位于珠江水系西江干流红水河中游、广西壮族自治区大化县,南距南宁市约100km。大化水电站以发电为主,兼有航运、灌溉等效益。电站近期装机容量40万kW,保证出力10.68万kW,多年平均发电量21.06亿kW·h。上游天生桥、龙滩等梯级建成后,扩建左岸厂房,增加装机20万kW,最终装机达60万kW,保证出力34.3万kW,多年平均发电量33.19亿kW·h。水库淹没耕地489.2hm2,移民1689人。工程于1975年10月开工,1983年12月第一台机组发电,1986年底竣工。   坝址以上集水面积112200km2,多年平均流量1990 m3/s,多年平均径流量627亿m3,多年平均输沙量4740万t。水库正常蓄水位155m,死水位153m,总库容9.64亿m3,为日调节水库。大坝按百年一遇洪水流量23200m3/s设计,库水位163.8m,按千年一遇流量31000m3/s校核,库水位169.3m。电站最大水头39.2m,最小水头13m,设计水头22m。   坝址基岩主要为三叠系薄层泥岩、灰岩互层,岩性软弱,结构挤压强烈,平缓断层发育,工程地质条件较复杂。   枢纽建筑物由和混凝土重力坝和左右岸土坝、混凝土溢流坝、河床式厂房、升船机等组成。   坝线全长1166m,坝顶高程174.5m,最大坝高78.5m。溢流坝布置在河床左侧深河槽部分,长228.4m,设有13孔开敞式溢流孔,孔口宽14m,高14m。   厂房布置在右岸滩地上,为全封闭式,副厂房布置在主厂房上。厂房长175m,宽75.6m,高83.28m。厂房内安装4台轴流转桨式水轮发电机组,单机容量10万kW,额定转速76.9r/min,水轮机转轮直径8.5m。发电机为伞式空冷型,额定电压15.75kV,定子铁芯内径12.8m。厂房进口前沿设有4个排沙底孔。   通航建筑物布置在右岸台地上,由上游引航道、挡水坝段、中间通航渠道、升船机和下游引航道组成。航道全长1266.88m。采用卷扬升降平衡重式垂直升船机,标准船尺寸为37m×9.33m×1.27m(长×宽×吃水深),最大升程36.6m。设计年货运量390万t,最大通航船只为250t。   施工中采用过水围堰,分期导流。二期导流厂房过水。过水土石围堰高29m,用1m厚混凝土板和钢筋网护面, 最大过堰流量9130m3/s,相应单宽流量51m3/s。工程于1980年10月23日实现截流。实际截流流量1390m3/s,用10~25t自卸汽车抛投块石、石串和10~15t混凝土块,双戗立堵,最大落差2.33m,最大抛投强度12680m3/h,费时24h,截流后利用厂房4台机组的蜗壳、尾水管及排砂廊道宣泄导流流量,设计导流流量为3850m3/s。导流时间历时25个月,一般导流水头2~4m,最大4~13m。混凝土采用人工骨料,掺用新型外加剂(TF和3FG-2)。浇筑时使用滑动模板。总工程量为:土石方开挖747万m3,土石方填筑139万m3,混凝土浇筑146万m3。   2~7号坝段坝基有倾向上游(倾角13°)厚1~6cm的软弱夹层,在坝踵处开挖10m深齿槽回填混凝土,在上游铺以3m的混凝土铺盖。