冲刷漏斗,scouring funnel
1)scouring funnel冲刷漏斗
1.Model test of scouring funnel model at Dengke hydropower station;等壳水电站冲刷漏斗模型试验研究
2.Numerical simulation study on longitudinal profile of scouring funnel;冲刷漏斗纵剖面形态数值模拟技术研究
3.Research on three dimensions mathematical model for scouring funnel shape in front of dam;水库坝前冲刷漏斗形态三维水沙数学模型研究
2)scour funnel冲刷漏斗
1.According to the tests,the scour funnel would be two-dimensional feature under the specific condition.探讨了特定河道条件(近坝段地形狭窄)下的水库冲刷漏斗形态问题。
3)erosion funnel冲刷漏斗
1.The flow condition and the possible producing form of erosion funnel in the dam area where the reservoir sedimentation has developed to equilibrium state and the primary factor dealing with profile of the funnel are studied qualitatively.通过概化模型试验,定性研究黄河小浪底水库淤积达到平衡状态以后,坝区流态及可能出现的冲刷漏斗形态,同时分析了影响冲刷漏斗纵坡的主要原因,并对枢纽建筑物的结构布置形式、泄水建筑物的开启运用原则等提出了建议。
4)surge hopper缓冲漏斗
5)erosion upstream funnel坝前冲沙漏斗
英文短句/例句

1.Toutun River Reservoir Upstream Flushing Funnel and the Emptying of the Initial Flushing头屯河水库坝前冲沙漏斗及泄空冲沙的初步探讨
2.Research on Designing Method and Principle for Sand Funnel of Drip Irrigation渠水滴灌系统漏斗排沙池设计原理与方法研究
3.so he searched around till he found a small sandy spot with a little funnel-shaped depression in it.于是他在周围找到一个小沙堆,沙堆中间有一个漏斗形凹陷处。
4.A small leakage through an earth fill or hydraulic fill dam or its foundation removes some fine material in suspension.贯穿填土坝、水力冲填坝或坝基的一个细小的漏水孔隙以悬浮的方式带走一些细小的土粒。
5.Parallel Computation of Finite Element with Hourglass control for Impact Dynamic Problems;带有沙漏控制的有限元冲击动力问题并行计算
6.Study on the Evolution of River Bed Scour and Siltation in the Reservoirs of Rubber Dams in Chan-Ba Ecological District;浐灞河生态区橡胶坝库区泥沙冲淤演变研究
7.Experimental study on characteristics of sediment scouring and deposition in dike-narrowed river channel of Lower Yellow River黄河下游丁坝缩窄河道泥沙冲淤特性试验研究
8.Hydraulic fill dams are built of sand and silt brought into the dam in a stream of water, usually through a pipe.水力冲填坝通常是用一根管子利用水流把砂和粉沙运到坝体处筑坝。
9.The released flow from reservoirs carries less sediment load of bed material than pre? dam periods.建坝后水库下泄水流挟带的床沙质含沙量减少,坝下游河床出现冲刷。
10.Numerical Simulation of Hydraulic Scouring of Silt in Front of Qingtongxia Reservoir Dam;青铜峡水库坝前淤积体水力冲刷的数值模拟
11.Without a way to release most of this mud, the reservoir would silt up and possibly collapse.工程师在大坝底部设计了23道闸门用于在汛期冲走泥沙。
12.Mathematical Simulation of Three Dimensional Velocity Fields in Local Scour Around Piers Protected by the Sediment Storage Dam采用拦沙坝防护的浅基桥墩局部冲坑三维流场数值模拟
13.INFLUENCE OF FLOOD DISCHARGE AND SAND SCOURING OF THREE GORGES RESERVOIR AND GEZHOUBA RESERVOIR ON DEFORMATION OBSERVATION AT YICHANG SEISMOSTATION三峡与葛洲坝水库泄洪冲沙对宜昌台形变观测的干扰
14.Something resembling this utensil in shape.漏斗状物外形象漏斗的物体
15.The Investigation of Underground Reservoir Construction in the Excess Exploited Funnel Area超采漏斗区漏斗填充式地下水库研究
16.I was more than halfway down when I came upon a deep funnel shaped formation in my path.下达大半程的时候,前面突然出现一个漏斗形的深槽。
17.The Research on the Pre-And Postoperative Chest Flat Degree and the Pulmonary Function in the Different Age Patients with Pectus Excavatum;不同年龄段先天性漏斗胸手术前后胸廓扁平程度及肺功能的研究
18.Preoperative and Postoperative Chest Flat Degree in Different Age Children with Pectus Excavatum不同年龄段漏斗胸患儿手术前后胸廓的扁平程度
相关短句/例句

scour funnel冲刷漏斗
1.According to the tests,the scour funnel would be two-dimensional feature under the specific condition.探讨了特定河道条件(近坝段地形狭窄)下的水库冲刷漏斗形态问题。
3)erosion funnel冲刷漏斗
1.The flow condition and the possible producing form of erosion funnel in the dam area where the reservoir sedimentation has developed to equilibrium state and the primary factor dealing with profile of the funnel are studied qualitatively.通过概化模型试验,定性研究黄河小浪底水库淤积达到平衡状态以后,坝区流态及可能出现的冲刷漏斗形态,同时分析了影响冲刷漏斗纵坡的主要原因,并对枢纽建筑物的结构布置形式、泄水建筑物的开启运用原则等提出了建议。
4)surge hopper缓冲漏斗
5)erosion upstream funnel坝前冲沙漏斗
6)funnel[英]['f?nl][美]['f?nl?]漏斗
1.In view of the big height and large size and complexity of the ore groove structure, large size of concrete funnel, the scientific and rational design, building and construction scheme of the scaffold are put forward to reduce the cost and ensure the construction quality with good effect.针对矿槽工程结构高大、复杂、混凝土漏斗大等特点,提出科学合理的脚手架设计、搭设、施工方案,降低施工成本,保证了施工质量,取得了良好的效果。
2.The funnels are the main karst landform in this area,the average area of them are(9?812)?m~2,the total area is(461?179)?m~2 which is 18% of the study area,the average main axis is 120?m in length,the density is 18.漏斗是本区发育的主要岩溶地貌,它们的平均面积为9 812 m2,总面积达461 179 m2,占研究区面积的18%,长轴平均长120 m,发育密度为18。
3.Big funnel structure in industrial buildings is difficult to construct due to its complicated construction procedure,not only spending a great amount of manpower and time but also consuming a number of special shaped formwork and supporting materials.工业建筑中的大型混凝土漏斗施工较为困难,其施工的工序也较为复杂,既费工费时,又耗用大量异型模板和支撑材料。
延伸阅读

冲刷水流冲击引起河、渠及海岸、库岸等土石流失或剥蚀的现象。被冲刷的泥沙随水流运动,可能在其他地点淤积。