1)Silin hydropower station思林水电站
1.Seepage analysis of the non-overflow section at Silin hydropower station;思林水电站非溢流坝段渗流分析
2.Analysis on hydraulic transient of long trailrace tunnel without tailrace surge tank for Silin Hydropower Station;思林水电站长尾水隧洞取消尾调水力过渡过程分析
3.Stability analysis and safety evaluation for high rock slope of navigable lock of the Silin Hydropower Station;思林水电站船闸高边坡稳定安全分析与评价
英文短句/例句
1.Seepage Flow Field Analysis of Silin RCC Dam;思林水电站碾压混凝土坝的渗流分析
2.3D numerical simulation of overtopping flow field for earth-rockfill cofferdam of Silin hydropower station思林水电站土石围堰过水流场三维数值模拟
3.Design and Construction of Impermeable and Anti-breath Cofferdam in Siling Hydropower Station,Wujiang,Guizhou贵州乌江思林水电站围堰防渗闭气设计及施工
4.The conduction and damming current planning choice and the construction of Jilintai the first level hydroelectric power station吉林台一级水电站导截流设计及施工
5.Study on Hydraulic Turbulence of Jilintai 2nd Stage Hydropower Station吉林台二级水电站水力干扰过渡过程研究
6.Thoughts on the Operation Model of Shahe Pumped-Storage Power Station;对沙河抽水蓄能电站经营模式的思考
7.Quality Control of Cable Anchorage in High Side-slope of Extension Works of Zhelin Hydropower Station柘林水电站扩建工程高边坡锚索施工质量监控
8.Studies on the Jilintai First Class Power Station s Shot Firing Aggregate in Triaxial Test;吉林台一级水电站爆破堆石料的三轴试验研究
9.Discussion about the Management of Jilintai-ⅠHydropower Station;关于吉林台一级水电站工程管理的探讨
10.The relation between building talinxi hydroelectric station and contivnubally developing district economy;塔林西水电站与区域经济可持续发展的关系
11.The discussion on comprehensive automation for small hydropower stations吉林省农村小水电站实现综合自动化的探讨
12.On Forestry Ecological Construction of Tian’e Reservoi Region in Guangxi Longtan Hydro Power Station论广西龙滩水电站天峨库区的林业生态建设
13.floating power barge水上动力站水上发电站
14.Review and Rethinking of the 2006 October Flood Suffered by Gelantan Hydropower Station戈兰滩水电站2006年10月洪水回顾与反思
15.hydroelectric(power) statio水(力发)电厂[站]
16.Practice and Consideration of Ertan Hydropower Station Construction Project Management;二滩水电站建设项目管理的实践与思考
17.REFLECTIONS ON THE ISSUES OF PUMPED STORAGE POWER STATION IN DEREGULATED POWER MARKET;市场环境下抽水蓄能电站问题的几点思考
18.Consideration on diversion tunnel plugging gate for Laxiwa hydropower project on the Yellow River关于黄河拉西瓦水电站导流封堵闸门的思考
相关短句/例句
Zhelin Hydropower Station柘林水电站
1.Reasonability and characteristics of safety monitoring system for Zhelin Hydropower Station were discussed.讨论了柘林水电站安全监测网布置的合理性和特点;分析了安全监测成果;并采用能反映边坡变形行为特点的模型,对重要监测点的监测数据进行了变形预测。
3)Miaolin hydropower station庙林水电站
1.After workers enter the site to construct the access bridge for Miaolin hydropower station,the commencement of the project is postponed due to the change of bridge site.庙林水电站交通桥工程进场施工后,由于桥址变更而引起工程延后开工,而桩基础施工是影响整个工程施工进度的关键工作,为了确保工程施工进度,桩基施工优选了钻孔机具,并采取有效的施工工艺,从制浆、钻孔、清孔、安放钢筋笼、灌注水下混凝土等方面来控制其施工质量和进度。
4)Tongzilin water power station桐子林水电站
1.Test of optimization of open diversion channel exit and downstream protection in Tongzilin water power station;桐子林水电站导流明渠出口优化及下游防护试验研究
5)Jilintai water power station吉林台水电站
1.The paper calculates the flood discharging rich considering the flood process uncertainty rich value taking Jilintai water power station as the example with Monte-carlo method,compares the flood discharging rich value of considering the flood process and no-considering the flood process,the result indicates that the rich value of the latter is bigger than the rich value of the former.本文以吉林台水电站为例,运用蒙特卡罗法计算了考虑洪水过程中洪峰位置不同时的泄洪风险,对洪峰位置靠前和洪峰位置靠后的洪水过程的泄洪风险分别进行了计算,结果表明后者的风险值大于前者,这说明洪水过程中洪峰位置的不确定性对泄洪风险的影响是不可忽略的。
6)Talinxi hydroelectric station塔林西水电站
1.This paper introduces the general situation of the project in Talinxi hydroelectric station and analyzes the relation between project benefit and district economical development. 介绍了塔林西水电站的工程概况;分析了其工程效益及区域经济发展的关系。
延伸阅读
林澄思林澄思。广东博罗人。中共党员。1938年先后就读于延安抗日军政大学和鲁迅艺术学院文学系,1939年参加八路军,历任一一五师战士剧社文艺教员,山东军区文工团艺术指导,山东省文化协会执行委员兼《文艺丛书》主编,解放军东北军区文艺科长兼文工团团长,军委公安军文化部副部长,安徽省文学艺术界联合会副主席、党组副书记,《安徽文学》、《戏剧界》杂志主编。安徽省文学艺术界联合会名誉主席,安徽省作家协会、音乐家协会名誉主席,安徽省政协常委,中国戏剧家协会第四届常务理事。1936年开始发表作品。