1)Yangjiang Pumped Storage Plant阳江抽水蓄能电站
1.Regression analysis of in-situ stress field for Yangjiang Pumped Storage Plant;阳江抽水蓄能电站地应力场回归分析
2)Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站
1.Design and Construction Optimization of the Upper Reservoir of Jiangsu Yixing Pumped Storage Power Station;江苏宜兴抽水蓄能电站上水库工程设计与施工优化
2.Construction and Management on Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站建设与管理
3.Project Auditing of Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站工程项目审计
英文短句/例句
1.Brief Introduction to the Mechanical and Electrical Equipment of Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站机电设备简介
2.Project Auditing of Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站工程项目审计
3.Large-diameter Shear-Resistant Pile Engineering at Yixing Pumped Storage Power Station in Jiangsu江苏宜兴抽水蓄能电站大直径抗剪桩施工
4.Design Features of Upper Reservoir Main Dam of Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站上库主坝设计特点
5.Construction Technology and Quality Management of Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站施工技术与质量管理
6.Application of "Four-New Technology" to Jiangsu Yixing Pumped Storage Power Station Project江苏宜兴抽水蓄能电站工程“四新技术”的应用
7.Support Design of Underground Powerhouse of Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站地下厂房的支护设计
8.Review on the Safety Work of Jiangsu Yixing Pumped Storage Power Station Project江苏宜兴抽水蓄能电站工程安全工作回顾
9.Budget Control in Project Implementation Stage of Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站项目实施阶段概算控制
10.Management of Foreign Affairs during the Construction of Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站建设中的外事管理工作
11.Water Pressure Test on the Steel Bifurcation for Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站引水钢岔管压水试验测试
12.Anti-seepage Disposal of the Surge Shaft of Upper Reservoir for Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站上水库闸门井(兼调压井)防渗处理
13.Rockfilling Construction Quality Control of the Major Dam of Upper Reservoir of Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站上水库主坝坝体填筑施工质量管理
14.The Construction and Quality Control of Earth-rockfill Dam for Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站下水库土石坝施工与质量控制
15.The Research of the Abnormal Water Hammer Phenomenon based on the Unit 3 over Speed Test of Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站3号机组过速试验异常水击现象的研究
16.Information Management of Construction Security Monitoring on Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站施工安全监测信息化管理
17.Construction of Rockfill Mixed Dam with Reinforced Concrete Face Slab for the Upper Reservoir of Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站上库面板堆石混合坝建设实践
18.Excavation and Support of Underground Powerhouse of Jiangsu Yixing Pumped-storage Power Station江苏宜兴抽水蓄能电站地下厂房开挖及支护施工
相关短句/例句
Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站
1.Design and Construction Optimization of the Upper Reservoir of Jiangsu Yixing Pumped Storage Power Station;江苏宜兴抽水蓄能电站上水库工程设计与施工优化
2.Construction and Management on Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站建设与管理
3.Project Auditing of Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站工程项目审计
3)Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站
1.Budget Control in Project Implementation Stage of Jiangsu Yixing Pumped Storage Power Station江苏宜兴抽水蓄能电站项目实施阶段概算控制
4)Nanyang Huilong Pumped Storage Plant南阳回龙抽水蓄能电站
5)Liyang Pumped Storage Power Station溧阳抽水蓄能电站
1.Application of composite seepage prevention of geomembrane and clay in Liyang Pumped Storage Power Station土工膜黏土组合防渗在溧阳抽水蓄能电站中的应用
6)pumped-storage hydroelectric plant抽水蓄能水电站
延伸阅读
下武昌江行望涔阳【诗文】:悠悠次楚乡,楚口下涔阳。雪隐洲渚暗,沙高芦荻黄。渔人共留滞,水鸟自喧翔。怀土年空尽,春风又淼茫。【注释】:【出处】:全唐诗:卷293_27