工程变更,engineering change
1)engineering change工程变更
1.On the management of the engineering change based on the engineering quantity list valuation mode;论清单计价模式下工程变更的管理
2.How to deal with the accounts settling of engineering changed items by chartered estimation engineers;造价工程师如何处理工程变更中的结算问题
3.Discussion on the method of supervision engineer treating engineering change;关于监理工程师处理工程变更的方法探讨
英文短句/例句

1.The Confirmation and Control of Construction Cost in Project Change;论工程变更后工程造价的确定与控制
2.Analysis of Influences of Project Change over Municipal Engineering Cost;工程变更对市政工程造价的影响分析
3.The Research of Engineering Change Management in Collaborative Working Environment;协同工作环境下的工程变更管理研究
4.Influence of Variation Order during the Construction Stage on Construction Cost;施工阶段工程变更签证对工程造价的影响
5.Control of Supervision Engineer to Construction Changing in Construction Phase施工阶段监理工程师对工程变更的控制
6.Discussion on the method of supervision engineer treating engineering change;关于监理工程师处理工程变更的方法探讨
7.Alterations of Engineering Works in Implementation of Contract of Dahuofang Reservoir Water Diversion Project;大伙房水库输水工程合同实施阶段的工程变更
8.How to deal with the accounts settling of engineering changed items by chartered estimation engineers;造价工程师如何处理工程变更中的结算问题
9.The policy of cost control from the owner s view under the project changes;工程变更条件下的甲方工程造价控制策略
10.Application of Value Engineering in Evaluating Engineering Change in Supervision;价值工程在监理评估工程变更方案中的应用
11.On the Operation and Management of Engineering Change Performed by the Supervision Engineer论监理工程师对工程变更的操作与管理
12.Game Analysis of Engineering Change in Main Body of Construction Project Based on Dissymmetry Information;建设项目主体工程变更行为博弈分析
13.Risk Identification and Risk Assessment in Engineering Variation of Construction Project;建设项目工程变更的风险分析与评价
14.The Method of Making a Price of Project Alteration under the Clause of FIDIC;FIDIC条款下工程变更的定价方法
15.The Research on Change Management of Direct Current Transmission Construction Project直流输电建设项目工程变更管理研究
16.Differentiation Relationship and Application of Engineering Change and Claim工程变更与索赔的辩证关系及其运用
17.Simple Analysis of Design Alteration and Engineering Visa浅析工程中设计变更与工程量签证单
18.Research of Controlling the Integration Alteration of the Architecture Engineering Design Process;建筑工程设计过程综合变更控制研究
相关短句/例句

project change工程变更
1.The application & practice of management in systematic procedural project changes;制度化程序化工程变更管理的应用与实践
2.Contract management of project changes of Shuiyu reservoir s danger removing and strengthening work;水峪水库除险加固工程变更的经济分析
3.The influencing of project changes in cost management;工程变更在造价管理中的影响
3)project changes工程变更
1.Importance of project changes in project settlement;浅谈工程变更在工程结算中的重要性
2.The contents application and endorsement process of project changes;试论工程变更的内容及申报审批的程序
4)engineering alteration工程变更
1.Reflection on claims from engineering alteration;对工程变更进行索赔的思考
2.Combined with engineering practice, the supervision experience in the implementation of FIDIC clause in Handan water supply project was introduced in aspects of payment of engineering fees, disposal method of engineering alteration, and claim for compensation.结合工程实践,从工程款的支付、工程变更的处理以及索赔事件的处理三方面,介绍了邯郸供水项目中实施FIDIC条款的监理经验。
3.In this paper,how to determine alteration unit price is explored by analyzing the causes of engineering alteration and adjustment of engineering amount.工程变更在工程实施过程中普遍存在,变更费用的多少直接关系到业主和承包商的切身利益,而变更费用的重点在于变更单价。
5)project variation工程变更
1.According to the property of project variation,the paper divides variation into fatal variation,important variation and general variation,and points out that we can control variation effectively by establishing.首先依据工程变更内容将工程变更划分为工作范围变更、施工条件变更、设计变更、施工变更和技术标准变更,对不同内容的变更区别情况提出不同控制方法。
2.To strengthen the active control of architectural engineering construction cost,and reduces the project variation visa during the project construction stage as far as possible,and guarantee the project settlement price does not surpass the investment plan volume which confirmed,and speed up the rate of project settlement progress.为了加强对建筑工程造价的有效控制,尽量减少工程施工阶段工程变更签证,保证工程结算价不超过即定的投资计划额,同时加快工程结算进度。
6)change in the work工程变更
1.In this article,author introduces the classification,meanings and contents,examine and approve rules and the notices of the change in the work,puts forward some suggestions about how to strengthen the management of change in the work.介绍了工程变更的分类、含义及内容、审批原则及注意事项,并对如何加强管理变更工作提出了建议。
延伸阅读

坦克维修工程车(见坦克保养工程车、坦克修理工程车)坦克维修工程车(见坦克保养工程车、坦克修理工程车)tank maintenance %26 repair vehicle 一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。