核电项目,nuclear power project
1)nuclear power project核电项目
1.System-based training for nuclear power projects,which is originated from US Army teaching training,is a popular mode used by domestic and foreign companies.由于核电项目部工作涉及专业面广、工种多,因此参与现场工作的承包商人员组成也极为复杂,对不同种类、级别的施工人员,其培训、授权要求也不尽相同。
英文短句/例句

1.A Study on Quality Management System of China Nuclear Industry 23~(rd) Construction Corporation of Nuclear Power Project;中核23公司核电项目质量管理研究
2.Perhaps Sichuan Provence will have no chance to obtain nucleus power generation items by Wenchuan Earthquake.四川可能因汶川地震错失核电项目.
3.The new nuclear power project aroused much controversy in the country.新的核电项目在该国引起了极大的争论。
4.Choice and Practice of HaiYang Nuclear Power Project Management Mode海阳核电项目工程管理模式选择与实践
5.Surrounding the project Approval System Making thermal power project planning围绕项目核准制 做好火电项目规划
6.Study on Whole Course Cost Management for Nuclear Power Construction Project;核电站工程项目全过程成本管理研究
7.The Research of the Supervision on the Nuclear Project Construction;核电站建设项目工程建造监理的研究
8.Exploration and Discussion with Development of AE Company in the Nuclear Power Project;核电工程项目中AE公司的发展探讨
9.Research on Key Technology about Underwater Restoration of Head Delivery System (HDS) in Nuclear Power Plant;核电站水下修复项目HDS关键技术研究
10.The Cost Accounting of Projects Perfectly;如何做好电力勘测工程项目成本核算
11.Discussing of Project Management Model in Lingao Nuclear Power Station;岭澳核电站工程项目管理模式的探讨
12.Study of Nuclear Power Project Management by EPC Mode“EPC”模式下核电工程项目管理研究
13.value of project approvals项目核准金额(值)
14.Analysis on Key Articles of PPA for BOT Power Projects (2);BOT电源项目购电协议(PPA)核心条款解析(2)
15.Analysis on Key Articles of PPA for BOT Power Projects (1);BOT电源项目购电协议(PPA)核心条款解析(1)
16.Research of Project Management Application for Nuclear Power Operations Preparation;项目管理在核电站生产准备中的应用研究
17.Establishing Cost Management System for Nuclear Power Construction Project;核电站建筑施工项目成本管理体系的创建
18.The Application of Project Management to Daya Bay Nuclear Power Plant Outage Management;项目管理在大亚湾核电站大修管理方面的应用
相关短句/例句

the checking item核查项目
3)project examination项目考核
4)project accounting项目核算
1.According to the characteristics of university accounting system for projects accounting and management,clarifies the project accounting procedure and interior data processing,so that the accountants are provided with theoretic support in correct performance of projects accounting and management.结合高校会计制度中项目核算与管理的特点,阐述了项目核算的业务处理流程以及内部数据流程,为会计人员正确进行项目核算与管理提供了理论依据。
2.As the computerization of accounting and the perfecting finance software,by using project accounting function of finance software, the cash flow statement can work out easy and inquire the information about the cash flow at any time without the influence of accounting subject.随着会计电算化的普及和财务软件的不断完善,运用财务软件项目核算的功能编制现金流量表的过程简单且可随时查询现金流量信息,而且不会受到会计科目变化的影响。
5)testing items考核项目
1.Standard establishment of football technical testing items in common institutes and universities of higher learning;普通高校足球技术考核项目标准化设置的研究
6)core projects核心项目
延伸阅读

柏崎·刈羽核电厂柏崎·刈羽核电厂Kashiwazaki-Kariwa Nuclear Power Station Bo(q一y{yu Hed一onehong柏崎·划羽核电厂(Kashiwa:aki一KariwaNuelear Power Station)坐落在日本最大的岛屿本州岛中部的新泻县柏崎市,西临日本海。 柏崎·刘羽核电厂安装7座沸水堆型核电机组,其中6、7号机组为先进型沸水堆(ABWR).1、2、3号机组的主承包商是东芝公司(Toshib。),机组设计和建设的总体技术责任也由东芝公司承担。4、5号机组的主承包商、设计和建设的总体技术责任承担方是日立公司(Hitaehi)。6、7号机组由东芝公司、日立公司和通用电气公司(GE)联合承包。先进沸不堆电厂外景参见彩图擂页第2页3图。 柏崎·刘羽核电厂l号机组1979年时订货,主体工程于1978年浇灌第一雄混凝土.1984年12月达到临界,1985年2月并网发电,1985年9月投人商业运行。1号机组目前的发电容量为1100 MW(净发电容量为1067 MW),机组的效率为33.4%。 柏崎·刘羽核电厂7号机组于1991年l月开始订货,主体工程于1992年2月开始浇灌第一幼混凝土。于1996年1z月开始并网发电,1997年7月正式投人商业运行。7号机组目前的发电容量为1356 MW(净发电容量为1311 MW),机组热效率为34.5%。7号机组的冷却系统采用海水为冷却剂。核岛设备由日立公司供应,常规岛设备由通用电气公司和日立公司联合供应。堆芯部件也由通用电气公司和日立公司联合供应.首炉装料由通用电气公司负责,燕汽发生器及汽轮发电机由通用电气公司和东芝公司联合供应,土建施工由Takennaka一konuten、清水(Shimizu)和前田(Maeda)三家株式会社共同承担。 柏崎·刘羽核电厂7座核电机组的堆芯及嫩料、反应堆容器、反应堆安全壳、冷却剂、水化学、安全控制系统、装料及运行系统、乏燃料管理和汽轮发电机的各项今数不尽相同,仅以7号机组为例予以说明. 7号机组反应堆堆芯活性段高度3.71m,直径5.16m,嫩料装t为150t重金属.反应堆内装有872个徽料组件,首炉装料和换料时的嫩料组件都为8x8高燃耗燃料组件,每个燃料组件中有60根嫩料棒,嫩料组件间距15.5 mm,嫩料棒间距1.6 mm。堆芯最大热功率密度为118.4kw/L,平均为50.6kw/L。燃料材料采用UO:,首炉装料的燃料富集度为2.6%,换料时为3.5%。嫩料棒高度为4066 mm,外径12.3 mm,芯块高度10.3 mm,直径10.4 mm。包壳采用Zr一2为材料,厚度0.86 mm.包壳外部最高温度310C,芯块内部最高温度 179oC。每年换料t为29t重金属.卸料平均燃耗为39500 MW·d八U,最高为50000 MW·d八U。共有206束控制棒。 反应堆容器器壁厚170 mm,高21.om,内径7.1m。冷却系统采用水作为冷却剂,堆芯人口沮度216C,出口温度286C。反应堆产生的蒸汽流t为52200t/卜,燕汽压力7.2 MPa. 汽轮发电机额定转速为1500 r/min,连续出力为1356 MW。