施工缝,construction joint
1)construction joint施工缝
1.Experimental research on the splitting tensile strength for joint surface of concrete construction joint;混凝土施工缝接缝面劈拉强度试验研究
2.A review of setting-up and treatment method of construction joint;施工缝留设和处理方法综述
3.Experimental study on the splitting tensile strength for joint surface of construction joint;施工缝粘结面劈拉强度试验研究
英文短句/例句

1.Horizontal construction joint shall be set at the top of the slab.5施工缝留设:水平施工缝留置于板顶面。
2.Primary Exploration on Control of TBM Segment Displacement under Construction in the TunnelTBM施工中管片接缝错台控制措施初探
3.Temperature Cracks Control of Mass Concrete Construction;水工大体积混凝土温度裂缝施工控制
4.Problem and Prevention of Cracks in Concrete Construction混凝土工程施工中的裂缝问题与防治
5.Study of new joint technology for PVC waterproofing membranePVC防水卷材接缝施工新工艺研究
6.Cracks and leaks are signs of poor construction in a house.裂缝和漏水表明房子的施工质量不好。
7.Summary on 180 dia seamless open caisson construction technologies at Baotou Steel包钢φ180无缝旋流沉淀池施工技术总结
8.Study on Effects of Construction Proccess and Crack Inducor at the Upstream Base of High Arch Dam;施工过程及底缝对高拱坝的影响研究
9.The Crack Control Study of the Mass Concrete Foundation Construction;大体积混凝土基础施工裂缝控制研究
10.Discussing the Crack Question in Mass Concrete Construction;大体积混凝土施工中裂缝问题的探讨
11.Cause analysis and treatment on crack of a light-industry factory building;某轻工厂房裂缝成因分析及处理措施
12.Studies of Control on Cracks on Construction of High-Strength Concrete Ctructures高强混凝土结构施工期裂缝控制研究
13.Control of Temperature Cracks in Construction of Massive Concrete大体积混凝土施工中温度裂缝的控制
14.Cause Analysis of Cracking in Dam Body during the Construction of Bailianya Dam白莲崖大坝施工期坝体裂缝成因分析
15.On construction process of bridge expansion joint and its quality control points桥梁伸缩缝施工过程及质量控制要点
16.Construction Technology for Cracking Control over Super Long Structure of Shanghai World Expo Center世博中心超长结构裂缝控制施工技术
17.Control and Prevention of Construction Cracks in Cast-in-place Reinforced Concrete Plate现浇钢筋砼板施工裂缝的控制及预防
18.Discussion on massive concrete of no crack construction in winter浅谈大体积混凝土超长无缝冬季施工
相关短句/例句

construction joints施工缝
1.On the setting and processing of construction joints in concrete structure;浅谈混凝土结构施工缝的设置和处理
2.A treatment of construction joints at the key position of the thin walled bridges;薄壁式桥梁关键部位施工缝处理
3.Experimental study on seismic behavior of cast in-site RC frame with construction joints;现浇钢筋混凝土框架施工缝抗震性能试验
3)construction gap施工缝
1.The article has conclude some waterproof ways on concrete construction gap by the practice of Masteel conetruction.通过在马钢建设施工中施工缝防水处理的实践应用,总结了一些施工缝的防水处理措施。
2.Cast—in—site concrete water tank can\'tbe casted once and itmust be constructed step by step and horizontal construction gapmust be placed.现浇钢筋砼水池难以将砼一次浇筑完成,必须设置水平施工缝,分阶段进行施工。
4)construction joint施工缝;施工接缝
5)jointless construction无缝施工
1.Practice of the jointless construction technology of the super-long concrete structure;超长混凝土结构无缝施工实践
2.On the setting of the expansion-reinforcing band in the over-long concrete structure jointless construction超长混凝土结构无缝施工中膨胀加强带的设置
3.From three aspects: design mechanism,shrinkage-compensating concrete and mix proportion design jointless construction plan of concrete is introduced.从设计机理、补偿收缩混凝土、混凝土配合比设计三方面对无缝混凝土施工方案进行了介绍,详细地阐述了大体积混凝土结构无缝施工的技术措施,以完善大体积混凝土结构无缝施工技术。
6)construction cracks施工裂缝
1.The causes and control of construction cracks of concrete;浅谈混凝土施工裂缝成因及控制
2.Based on this,it points out the prevention measures for the construction cracks,in order to control the construction cracks of the prestressed box girders.结合后张预应力箱梁施工特点,分析了产生裂缝的原因,指出收缩与温度应力是引起裂缝的主要因素,在此基础上提出了施工裂缝的预防措施,从而使预应力箱梁的施工裂缝得到有效的控制。
延伸阅读

混凝土施工缝混凝土施工缝concrete construction joint hunningtu sh一gongfeng混凝土施工缝(eonerete construetion joint) 先后浇筑的混凝土,其间歇时间超过混凝土凝结时间所形成的接缝。浇筑混凝土应连续进行,如必须间歇,其间歇时间应尽量缩短,并在前层混凝土凝结以前,将次层混凝土浇筑完毕。超过允许的间歇时间,以致用振捣器也难以使新浇的混凝土与先浇的混凝土结合成整体时,结合面即形成施工缝。与混凝土浇筑区段一平面平行的施工缝称水平施工缝,与浇筑区段平面垂直的施工缝称垂直施工缝。 混凝土浇筑允许的间歇时间,即为混凝土凝结时间,依所用水泥品种和凝结条件而异,日本及前苏联等国家都有明确规定,中国规范规定的混凝土凝结时间见表。 浇筑混凝土的间歇时间…攀叮泣 注:1.表列数值包括混凝土运输和浇筑时间;2.当掺有 促凝或缓凝剂时,最大间歇时间需经试验确定。 混凝土施工缝是混凝土结构的薄弱环节,处理不好,会引起结构开裂、漏水及影响结构耐久性,重者甚至危及结构安全。因此,通常在混凝土结构施工方案中,应根据结构类型、浇筑数量和浇筑条件,对施工缝的留设位置、施工缝型式及继续浇筑混凝土时的技术处理等,都预先予以确定。 施工缝留设位置一般留在结构受剪力较小,且便于施工的部位。各类结构的留设位置为:(1)柱子的施工缝留设在基础的顶面,梁或吊车梁牛腿的下面、吊车梁的上面、无梁楼板柱帽的下面;(2)深度大的梁,其施工缝留设在与其相连接板底面以下20~3omm处,当板下有托梁时,则应留设在托梁底下;(3)单向板的施工缝可留设在平行于板的短边的任何位置;(4)有主次梁的楼板,宜顺着次梁方向浇筑,其施工缝应留设在次梁跨度中间1/3范围内;(5)双向受力楼板、拱壳、斗仓、蓄水池、设备基础及其他复杂的结构,其施工缝的位置应按设计要求留置,一般斗仓可留设在漏斗根部及上部,或漏斗与仓壁的交接处;地坑和水池应留设在坑壁,距坑底30~50cm范围内;(6)承受动力作用的设备基础一般不设施工缝,如必须留设时,应征得设计单位同意,一般可在互不相依的两台设备和输送辊道支架之间留设垂直施工缝;(7)当在设备基础的地脚螺栓范围内留设施工缝时,水平施工缝应留设在距螺栓底下大于150mm处(直径小于3Omm的螺栓,水平缝可留设于螺栓埋入部分总长的3/4处),垂直施工缝应留设在距螺栓中心线25omm以外并小于5倍螺栓直径处。 施工缝型式对无防水要求的构筑物可采用平直的施工缝;对有防水要求的结构物应采用企口缝、V形缝或平缝加止水板。