疏散时间,evacuation time
1)evacuation time疏散时间
1.Influence of transport mode choice on evacuation time in mixed traffic flow evacuation simulations城市混合流疏散中不同交通方式配比对疏散时间的影响
2.The paper discusses engineering calculation of evacuation time based on crowd dynamics,in order to correct the error and give some improvement to the existing calculation method a comprehensive calculation method is given,in which pre-movement factor and interaction factor are introduced.应用人群动力学理论来研究人群疏散时间的工程计算问题,为解决现有计算方法的误差,合理引入疏散时间延迟因子和人员相互作用因子,提出了疏散时间的综合计算方法,该方法对现行的工程计算方法进行了改进和补充,并运用building EXODUS软件的模拟结果对综合计算方法进行了初步检验。
3.In this paper,a computational evacuation discrete time model(EDTM)has been presented to analyze the building egress evacuation time problem with previous works,and discusses the advantages of the use of the modified model over the use of the previous model.基于人群流动理论和离散计算方法对传统疏散时间计算公式进行了改进,并提出了疏散离散时间计算模型(EDTM)。
英文短句/例句

1.THE TIME NUMERICAL METHOD OF EVACUATION IN A BURNING BUILDING;建筑消防设计中疏散时间的确定方法
2.Influence of transport mode choice on evacuation time in mixed traffic flow evacuation simulations城市混合流疏散中不同交通方式配比对疏散时间的影响
3.Study on Law of Human Behavior and Evacuation Time When Buildings are on Fire;建筑物火灾时人员行为规律及疏散时间研究
4.Calculation Method of Emergency Evacuation Time Based on Paramics基于Paramics仿真软件的应急疏散时间计算方法
5.The Study on The Time of Passenger Evacuation in Guangzhou Asian Games Opening Ceremony第十六届广州亚运会开幕式疏散时间研究
6.Study on Combustion Performance and Available Safe Evacuation Time in Fire for Flame Retarded ABS阻燃ABS燃烧性能及对火灾中人员所需安全疏散时间的影响
7.The mathematical model of the passenger flow in subway station is studied to calculate the scatter time of subway travelers.研究地铁候车厅客流运动的数学模型,使之能够应用于地铁到达客流疏散时间的预测。
8.Research on Human Evacuation Response Time in Fire based on ANFIS基于ANFIS的火灾中人员疏散反应时间的研究
9.Model of Discrete Time Dynamic Network Flow and Its Application in Evacuation;离散时间动态网络模型及其在疏散过程中应用的研究
10.An Earthquake Safety Evacuation Evaluation in Confined Space--A Case Study of an Academic Building in a Fuzhou College受限空间地震时人员疏散的评价——以福州市某高校教学楼为例
11.Synthetical Optimization Model of Optimal Evacuation Routes and Departure Time Choice in a Dynamic System动态系统最优的疏散路线与出发时间综合优化模型
12.During the war their school had been evacuated to the countryside战争期间他们的学校被疏散到乡下。
13.During the war their school was evacuated to the country.战争期间他们的学校被疏散到了乡下。
14.We emptied the house as soon as the fire started.火灾刚发生时,我们就都疏散出去了。
15.Studies on Human Urgent Evacuation in the Underground Emporium Fire;火灾时地下商场人员紧急疏散的研究
16.The crowds dispersed; The children scattered in all directions when the teacher approached;.人群疏散了;老师来的时候,孩子们向各方散开了。
17.discrete-time approximation离散时间近似(法)
18.Stars condense from the matter scattered thinly through interstellar space.恒星是疏散在星际空间的物质凝聚而成的。
相关短句/例句

evacuating time疏散时间
3)the minimal evacuation time最小疏散时间
4)evacuation action time疏散行动时间
5)pre-evacuation time疏散准备时间
1.The present paper aims to introduce the authors' study on the pre-evacuation time for the occupants and its effect on the fire risk assessment.作为人员疏散时间中重要组成部分的疏散准备时间服从概率分布,而通常计算中往往将其简单取为常数。
6)safety egress time安全疏散时间
1.The common criterion of safety egress time for performancebased fire protection analysis was discussed in this paper.对目前常用的性能化防火分析中的安全疏散时间判据进行了讨论,认为存在必要而非充分条件的缺点,给判断是否真正安全带来不确定性,因此提出了一种更为合理的安全疏散时间判据,具有满足充分必要条件,简单可靠,使用方便的优点。
延伸阅读

个别劳动时间与社会必要劳动时间  两种互相联系的决定商品价值量的劳动时间。个别劳动时间指个别商品生产者生产某种商品所耗费的劳动时间。社会必要劳动时间是在当时社会正常的生产条件下,按社会平均的劳动熟练程度和劳动强度生产某种商品所需要的劳动时间。    在商品经济的条件下,各部门都有许多生产同种商品的生产者。由于他们所使用的生产资料不同和劳动的好坏不同,因此生产同一种商品所耗费的个别劳动时间也不一样。商品的价值由生产商品所耗费的劳动时间来决定。但这决不是说,一个人越懒,劳动越不熟练,他所生产的商品就越有价值。个别劳动时间形成商品的个别价值。个别劳动时间越长,只是指商品的个别价值越大。然而商品是用来交换的,不同生产者所生产的同种商品的个别价值虽然不同,但它们在交换中只能有一个价值。由于形成价值实体的劳动是相同的一般人类劳动,是同一人类劳动力的耗费,单个劳动力都要具有社会平均劳动力的性质,起着社会平均劳动力的作用,因此,表现在交换中的商品价值是由社会必要劳动时间决定的。    各个生产者所生产的商品数量共同构成该种商品的总量。某种商品总量同其单个商品一样,包含着生产它的社会必要劳动时间。在一般情况下,某种商品的大多数由中等条件所生产,小部分由较好和较坏的条件所生产。这时,该种商品总量的社会必要劳动时间,就由中等条件下生产的商品的个别劳动时间决定,较好和较坏条件下生产商品的个别劳动时间的差别可以互相抵消。这是商品生产上的第一种含义的社会必要劳动时间,即生产某种商品的单个产品及其总量实际耗费的社会必要劳动时间。与商品生产有关的还有第二种含义的社会必要劳动时间,即满足社会现有需要应该投入的劳动时间,或社会总劳动按比例应分给该种商品生产的劳动量。第二种含义的社会必要劳动时间是决定第一种含义的社会必要劳动时间所形成的商品价值实现的数量界限的。在社会生产按比例进行时,该种商品的生产量与社会需求量相一致,第一种含义的社会必要劳动时间和第二种含义的社会必要劳动时间相一致,商品总量的价值量就能全部得到实现。反之,两者不一致时,即第一种含义的社会必要劳动时间和第二种含义的社会必要劳动时间不一致时,商品的市场价值就会和市场价格不相等。当某种商品实际生产的总量超过社会对该种商品的需求总量时,第一种含义的社会必要劳动时间的总量超过了第二种含义的社会必要劳动时间的总量,该种商品中所耗费的部分劳动时间就得不到社会的承认,因此,该种商品的部分价值也就得不到实现。    个别劳动时间与社会必要劳动时间之间是对立统一关系。个别生产者的个别劳动时间与社会必要劳动时间(无论第一种含义和第二种含义)又每每不一致。这对商品生产者有很重要的意义。他的个别劳动时间的高低直接影响到收入和在竞争中的地位。他的个别劳动时间如果等于社会必要劳动时间,他的劳动耗费能全部得到补偿;如果低于社会必要劳动时间,可以得到额外收入;如果高于社会必要劳动时间,一部分劳动就得不到补偿。因此,社会必要劳动时间迫使生产者通过改进技术提高劳动生产率、降低商品生产上的个别劳动时间。在以私有制为基础的社会里,这种情况在一定程度上会推动生产力的发展,同时也会引起商品生产者的两极分化。